{"id":160751,"date":"2024-10-19T09:39:22","date_gmt":"2024-10-19T09:39:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-330-1-14\/"},"modified":"2024-10-25T01:58:02","modified_gmt":"2024-10-25T01:58:02","slug":"aci-330-1-14","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-330-1-14\/","title":{"rendered":"ACI 330.1 14"},"content":{"rendered":"

This specification covers minimum requirements for the construction of unreinforced concrete parking lots on grade. Included are requirements for submittals, testing and inspection, concrete materials, embedded reinforcement at joints, jointing and sealant material, forms, subgrade preparation, subbase, placing, texturing, curing, jointing, tolerances, and opening to traffic. This specification does not cover requirements for pervious concrete. Keywords: construction; curing; inspection testing; jointing; pavements; site paving; texturing.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nTITLE PAGE <\/td>\n<\/tr>\n
4<\/td>\nPART 1\u2014GENERAL
1.1\u2014Scope
1.2\u2014Definitions <\/td>\n<\/tr>\n
5<\/td>\n1.3\u2014Referenced standards
1.4\u2014Submittals
1.5\u2014Storage and handling
1.6\u2014Testing and inspection
PART 2\u2014PRODUCTS
2.1\u2014Concrete <\/td>\n<\/tr>\n
6<\/td>\n2.2\u2014Embedded reinforcement at joints
2.3\u2014Membrane-forming curing compounds
2.4\u2014Joint and sealant material
2.5\u2014Forms
PART 3\u2014EXECUTION
3.1\u2014Subgrade preparation
3.2\u2014Subbase
3.3\u2014Setting forms
3.4\u2014Placing embedded reinforcement at joints
3.5\u2014Batching, mixing, and delivery
3.6\u2014Placing and finishing fixed-form pavement <\/td>\n<\/tr>\n
7<\/td>\n3.7\u2014Placing and finishing slipform and laser-guided screed pavements
3.8\u2014Edging
3.9\u2014Final surface texture
3.10\u2014Tolerances
3.11\u2014Curing
3.12\u2014Hot- or cold-weather construction
3.13\u2014Jointing <\/td>\n<\/tr>\n
8<\/td>\n3.14\u2014Opening to traffic
NOTES TO SPECIFIER
General notes
FOREWORD TO CHECKLISTS <\/td>\n<\/tr>\n
9<\/td>\nMANDATORY REQUIREMENTS CHECKLIST <\/td>\n<\/tr>\n
10<\/td>\nOPTIONAL REQUIREMENTS CHECKLIST
SUBMITTALS CHECKLIST <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

330.1-14: Specification for Unreinforced Concrete Parking Lots and Site Paving<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ACI<\/b><\/a><\/td>\n2014<\/td>\n12<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":160753,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2650],"product_tag":[],"class_list":{"0":"post-160751","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aci","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/160751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/160753"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=160751"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=160751"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=160751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}