{"id":180166,"date":"2024-10-19T11:14:53","date_gmt":"2024-10-19T11:14:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/cdc-designconstructionstandards-2017\/"},"modified":"2024-10-25T03:32:31","modified_gmt":"2024-10-25T03:32:31","slug":"cdc-designconstructionstandards-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/cdc\/cdc-designconstructionstandards-2017\/","title":{"rendered":"CDC DesignConstructionStandards 2017"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
40<\/td>\n
2.0 Introduction <\/td>\n<\/tr>\n
41<\/td>\n2.1 Administration of Thethe Reference Guidelines <\/td>\n<\/tr>\n
43<\/td>\n2.2 Codes and Standards <\/td>\n<\/tr>\n
50<\/td>\n2.3 Accessibility <\/td>\n<\/tr>\n
51<\/td>\n2.4 Sustainable Design and High Performance Building Guidelines
2.4 Sustainable Design and High Performance Building Guidelines <\/td>\n<\/tr>\n
53<\/td>\nPer E.O. 13514 Section 2 (g) (iii), Federal agencies are required to ensure that at least 15 percent of the agency\u2019s existing buildings (above 5,000 gross square feet) and building leases (above 5,000 gross square feet) meet the Guiding Principles by …
GUIDING PRINCIPLES FOR SUSTAINABLE NEW CONSTRUCTION AND MAJOR RENOVATIONS <\/td>\n<\/tr>\n
78<\/td>\n2.5 Furniture & Equipment Design and Procurement <\/td>\n<\/tr>\n
79<\/td>\n2.6 Commissioning Policy <\/td>\n<\/tr>\n
80<\/td>\n2.7 Hazardous Materials Policy <\/td>\n<\/tr>\n
82<\/td>\n2.8 Energy Policy <\/td>\n<\/tr>\n
84<\/td>\n2.9 Water Management Policy <\/td>\n<\/tr>\n
86<\/td>\n2.10 Dispatch of Loads <\/td>\n<\/tr>\n
88<\/td>\n2.11 Value Engineering <\/td>\n<\/tr>\n
90<\/td>\n3 Procedures
3.0 Introduction <\/td>\n<\/tr>\n
91<\/td>\n3.1 CDC General Drawing Requirements (CAD) <\/td>\n<\/tr>\n
92<\/td>\nEND OF SECTION <\/td>\n<\/tr>\n
93<\/td>\n3.2 Drawing Requirements <\/td>\n<\/tr>\n
94<\/td>\nEND OF SECTION 3.3 Existing Condition Facility Documentation <\/td>\n<\/tr>\n
99<\/td>\nEND OF SECTION 3.4 Numbering Systems <\/td>\n<\/tr>\n
105<\/td>\n3.5 Furniture Procurement <\/td>\n<\/tr>\n
106<\/td>\n3.6 Commissioning <\/td>\n<\/tr>\n
112<\/td>\n3.7 Hazardous Materials
3.8 Health and Safety
3.9 Operating and Maintenance Manuals <\/td>\n<\/tr>\n
113<\/td>\n4 PLANNING AND DESIGN GUIDELINES
4.0 Introduction <\/td>\n<\/tr>\n
114<\/td>\n4.1 General Planning Criteria <\/td>\n<\/tr>\n
115<\/td>\n4.1.1 Master Plan <\/td>\n<\/tr>\n
118<\/td>\n4.1.2 Environmental Health and Safety <\/td>\n<\/tr>\n
121<\/td>\n4.1.3 Security <\/td>\n<\/tr>\n
125<\/td>\n4.1.4 Civil & Site Development Guidelines <\/td>\n<\/tr>\n
128<\/td>\n4.1.5 Campus Mechanical <\/td>\n<\/tr>\n
133<\/td>\n4.1.6 Campus Electrical <\/td>\n<\/tr>\n
138<\/td>\n4.1.7 Building Shell <\/td>\n<\/tr>\n
139<\/td>\n4.1.8 General Facilities <\/td>\n<\/tr>\n
165<\/td>\n4.2 General Laboratory Planning <\/td>\n<\/tr>\n
172<\/td>\n4.2.1 Biological Laboratories <\/td>\n<\/tr>\n
176<\/td>\n4.2.2 Chemical Laboratories <\/td>\n<\/tr>\n
178<\/td>\n4.2.3 Engineering Laboratories <\/td>\n<\/tr>\n
180<\/td>\n4.2.4 Radiation Laboratories <\/td>\n<\/tr>\n
182<\/td>\n4.3 General Animal Facility Planning <\/td>\n<\/tr>\n
194<\/td>\n4.3.1 Primate Facilities <\/td>\n<\/tr>\n
196<\/td>\n4.3.2 Rodent Facilities <\/td>\n<\/tr>\n
198<\/td>\n4.3.3 Canine Facilities <\/td>\n<\/tr>\n
200<\/td>\n4.3.4 Insect Facilities <\/td>\n<\/tr>\n
204<\/td>\n4.3.4a Flying Insect Facilities (Mosquitoes) <\/td>\n<\/tr>\n
208<\/td>\n4.3.4b Crawling Insect Facilities (Ticks, Mites, Lice, Fleas) <\/td>\n<\/tr>\n
210<\/td>\n4.4 Office Planning <\/td>\n<\/tr>\n
218<\/td>\n4.5 Support Facilities Planning
4.5.0 Building Support Facilities <\/td>\n<\/tr>\n
219<\/td>\n4.5.1 Conference Facilities With Videoconferencing <\/td>\n<\/tr>\n
231<\/td>\n4.5.2 Cafeterias <\/td>\n<\/tr>\n
233<\/td>\n4.5.3 Break Rooms <\/td>\n<\/tr>\n
235<\/td>\n4.5.4 Vending Areas <\/td>\n<\/tr>\n
237<\/td>\n4.5.5 Snack Bars <\/td>\n<\/tr>\n
239<\/td>\n4.5.6 Travel Office <\/td>\n<\/tr>\n
241<\/td>\n4.5.7 Share (Employee Store) <\/td>\n<\/tr>\n
243<\/td>\n4.5.8 Credit Union <\/td>\n<\/tr>\n
245<\/td>\n4.5.9 Lifestyle Facilities <\/td>\n<\/tr>\n
251<\/td>\n4.5.10 Lobby Areas <\/td>\n<\/tr>\n
253<\/td>\n4.5.11 Toilet Facilities <\/td>\n<\/tr>\n
257<\/td>\n4.5.12 Stairwells <\/td>\n<\/tr>\n
260<\/td>\n4.5.13 Janitor Closets <\/td>\n<\/tr>\n
262<\/td>\n4.5.14 Mechanical Rooms <\/td>\n<\/tr>\n
265<\/td>\n4.5.15 Electrical Switchgear Rooms (Main Service Entrance) <\/td>\n<\/tr>\n
269<\/td>\n4.5.16 Electrical Rooms <\/td>\n<\/tr>\n
273<\/td>\n4.5.17 Telephone Equipment Rooms (PBX) <\/td>\n<\/tr>\n
279<\/td>\n4.5.18 Telecommunication\/LAN Rooms <\/td>\n<\/tr>\n
284<\/td>\n4.5.19 Lactation Rooms <\/td>\n<\/tr>\n
285<\/td>\n4.5.20 Campus Support Facilities
END OF SECTION <\/td>\n<\/tr>\n
286<\/td>\n4.5.21 Central Utility Plants <\/td>\n<\/tr>\n
290<\/td>\n4.5.22 Data Processing Facilities <\/td>\n<\/tr>\n
295<\/td>\n4.5.23 Transshipping Facilities <\/td>\n<\/tr>\n
298<\/td>\n4.5.24 Laboratory Chemical Storage Facilities <\/td>\n<\/tr>\n
301<\/td>\n4.5.25 Waste Handling Facilities <\/td>\n<\/tr>\n
304<\/td>\n4.5.26 Parking Facilities <\/td>\n<\/tr>\n
308<\/td>\n4.5.27 Integrated Facilities Management System (IFMS) <\/td>\n<\/tr>\n
313<\/td>\n4.5.28 Stationary Storage Battery System Rooms <\/td>\n<\/tr>\n
320<\/td>\n5 BUILDING ELEMENTS <\/td>\n<\/tr>\n
321<\/td>\n5A SUBSTRUCTURE
5A0 Introduction <\/td>\n<\/tr>\n
322<\/td>\n5A1 Foundations
5A1.10 Standard Foundations <\/td>\n<\/tr>\n
323<\/td>\n5A1.20 Special Foundations <\/td>\n<\/tr>\n
324<\/td>\n5A1.30 Slab On Grade <\/td>\n<\/tr>\n
325<\/td>\n5A2 Below Grade Construction
5A2.10 Below Grade Excavations <\/td>\n<\/tr>\n
326<\/td>\n5A2.20 Below Grade Walls <\/td>\n<\/tr>\n
327<\/td>\n5B SHELL
5B.0 Introduction <\/td>\n<\/tr>\n
328<\/td>\n5B1.10 Floor Construction <\/td>\n<\/tr>\n
330<\/td>\n5B1.20 Roof Construction <\/td>\n<\/tr>\n
332<\/td>\n5B2 Exterior Enclosure
5B2.10 Exterior Walls <\/td>\n<\/tr>\n
334<\/td>\n5B2.20 Exterior Windows <\/td>\n<\/tr>\n
335<\/td>\n5B2.30 Exterior Doors <\/td>\n<\/tr>\n
336<\/td>\n5B3 Roofing
5B3.10 Roof Coverings <\/td>\n<\/tr>\n
337<\/td>\n5B3.20 Roof Openings <\/td>\n<\/tr>\n
338<\/td>\n5C INTERIORS
5C.0 Introduction <\/td>\n<\/tr>\n
339<\/td>\n5C1 Interior Construction
5C1.10 Partitions <\/td>\n<\/tr>\n
341<\/td>\n5C1.20 Interior Doors <\/td>\n<\/tr>\n
346<\/td>\n5C1.30 Fittings <\/td>\n<\/tr>\n
350<\/td>\n5C2 Stairs
5C2.10 Interior Stairs Construction <\/td>\n<\/tr>\n
351<\/td>\n5C2.20 Interior Stair Finishes <\/td>\n<\/tr>\n
353<\/td>\n5C3 Interior Finishes
5C3.10 Wall Finishes <\/td>\n<\/tr>\n
355<\/td>\n5C3.20 Floor Finishes <\/td>\n<\/tr>\n
359<\/td>\n5C3.30 Ceiling Finishes <\/td>\n<\/tr>\n
360<\/td>\n5D SERVICES
5D0 Introduction <\/td>\n<\/tr>\n
361<\/td>\n5D1 Conveying Systems
5D1.10 Elevators and Lifts <\/td>\n<\/tr>\n
362<\/td>\n5D1.20 Escalators and Moving Walks <\/td>\n<\/tr>\n
363<\/td>\n5D2 Plumbing Systems <\/td>\n<\/tr>\n
364<\/td>\n5D2.10 Plumbing Fixtures <\/td>\n<\/tr>\n
365<\/td>\n5D2.20 Domestic Water Distribution <\/td>\n<\/tr>\n
367<\/td>\n5D2.30 Sanitary Waste and Vent Systems <\/td>\n<\/tr>\n
368<\/td>\n5D2.40 Rain Water Drainage <\/td>\n<\/tr>\n
369<\/td>\n5D2.50 Gas Distributing Systems <\/td>\n<\/tr>\n
370<\/td>\n5D3 HVAC
5D3.10 Boiler Room Piping and Specialties <\/td>\n<\/tr>\n
371<\/td>\n5D3.20 Piping Distribution Systems <\/td>\n<\/tr>\n
373<\/td>\n5D3.21 Air Distribution Systems <\/td>\n<\/tr>\n
378<\/td>\n5D3.22 Exhaust Ventilation Systems <\/td>\n<\/tr>\n
379<\/td>\n5D3.23 Steam Distribution Systems <\/td>\n<\/tr>\n
381<\/td>\n5D3.25 Glycol Distribution Systems <\/td>\n<\/tr>\n
382<\/td>\n5D3.30 Building Automation Systems <\/td>\n<\/tr>\n
387<\/td>\n5D4 Fire Protection <\/td>\n<\/tr>\n
389<\/td>\n5D4.10 Sprinklers <\/td>\n<\/tr>\n
392<\/td>\n5D4.20 Standpipe Systems <\/td>\n<\/tr>\n
393<\/td>\n5D4.30 Fire Pumps <\/td>\n<\/tr>\n
394<\/td>\n5D4.40 Fire Protection Specialties <\/td>\n<\/tr>\n
395<\/td>\n5D4.50 Other Fire Protection Systems <\/td>\n<\/tr>\n
396<\/td>\n5D5 Electrical
5D5.10 Electrical Service & Distribution <\/td>\n<\/tr>\n
423<\/td>\n5D5.11 Electrical Studies <\/td>\n<\/tr>\n
432<\/td>\n5D5.20 Lighting & Branch Wiring <\/td>\n<\/tr>\n
444<\/td>\n5D5.30 Communications, Security & Fire Alarm Systems <\/td>\n<\/tr>\n
455<\/td>\n5D5.40 Lightning Protection\/ Grounding <\/td>\n<\/tr>\n
459<\/td>\n5D5.41 Emergency, Legally Required Standby, and Standby Power Systems <\/td>\n<\/tr>\n
469<\/td>\n5D5.42 Special Equipment <\/td>\n<\/tr>\n
473<\/td>\n5D5.43 Communication And Signaling Systems <\/td>\n<\/tr>\n
474<\/td>\n5D5.44 Freezer Alarm System <\/td>\n<\/tr>\n
475<\/td>\n5E EQUIPMENT & FURNISHINGS
5E0 Introduction <\/td>\n<\/tr>\n
477<\/td>\n5E1 Equipment
5E1.10 Office And Office Support Equipment <\/td>\n<\/tr>\n
481<\/td>\n5E1.20 Laboratory And Laboratory Support Equipment <\/td>\n<\/tr>\n
484<\/td>\n5E1.30 Vehicular Equipment <\/td>\n<\/tr>\n
485<\/td>\n5E2 Furnishings
5E2.10 Fixed Furnishings <\/td>\n<\/tr>\n
487<\/td>\n5E2.20 Movable Furnishings <\/td>\n<\/tr>\n
500<\/td>\n5F SPECIAL CONSTRUCTION & DEMOLITION
5F0 Introduction <\/td>\n<\/tr>\n
501<\/td>\n5F1 Special Construction Systems
5F1.10 Special Structures <\/td>\n<\/tr>\n
502<\/td>\n5F1.20 Integrated Construction <\/td>\n<\/tr>\n
504<\/td>\n5F1.50 Special Controls & Instrumentation <\/td>\n<\/tr>\n
505<\/td>\n5F2 Selective Building Demolition
5F2.10 Building Elements Demolition <\/td>\n<\/tr>\n
506<\/td>\n5F2.20 Hazardous Components Abatement <\/td>\n<\/tr>\n
507<\/td>\n5G BUILDING SITEWORK
5G0 General <\/td>\n<\/tr>\n
509<\/td>\n5G1 Site Preparation <\/td>\n<\/tr>\n
510<\/td>\n5G1.10 Site Preparation <\/td>\n<\/tr>\n
512<\/td>\n5G1.20 Site Demolition & Relocation <\/td>\n<\/tr>\n
514<\/td>\n5G1.30 Site Earthwork <\/td>\n<\/tr>\n
516<\/td>\n5G1.40 Hazardous Waste Remediation <\/td>\n<\/tr>\n
517<\/td>\n5G2 Site Improvements
5G2.10 Roadways <\/td>\n<\/tr>\n
519<\/td>\n5G2.20 Parking Lots <\/td>\n<\/tr>\n
521<\/td>\n5G2.30 Pedestrian Circulation <\/td>\n<\/tr>\n
523<\/td>\n5G2.40 Site Development <\/td>\n<\/tr>\n
526<\/td>\n5G2.50 Landscaping <\/td>\n<\/tr>\n
529<\/td>\n5G2.60 Irrigation <\/td>\n<\/tr>\n
531<\/td>\n5G3 Site Mechanical Utilities
5G3.10 Water Supply <\/td>\n<\/tr>\n
533<\/td>\n5G3.20 Sanitary Sewer <\/td>\n<\/tr>\n
534<\/td>\n5G3.30 Storm Sewer <\/td>\n<\/tr>\n
536<\/td>\n5G3.40 Heating Distribution <\/td>\n<\/tr>\n
537<\/td>\n5G3.50 Cooling Distribution <\/td>\n<\/tr>\n
538<\/td>\n5G3.60 Fuel Distribution <\/td>\n<\/tr>\n
540<\/td>\n5G4 Site Electrical Utilities
5G4.10 Electrical Distribution <\/td>\n<\/tr>\n
542<\/td>\n5G4.20 Site Lighting <\/td>\n<\/tr>\n
545<\/td>\n5G4.30 Site Communications & Security <\/td>\n<\/tr>\n
546<\/td>\n5G4.90 Other Site Electrical Utilities <\/td>\n<\/tr>\n
547<\/td>\n5G5 Other Site Construction
5G5.10 Service And Pedestrian Tunnels <\/td>\n<\/tr>\n
548<\/td>\n5G5.20 Pest Management Program During Construction <\/td>\n<\/tr>\n
549<\/td>\n6 APPENDIX
6.10 Request for Exception Form <\/td>\n<\/tr>\n
550<\/td>\n6.20 Request for Clarification Form <\/td>\n<\/tr>\n
551<\/td>\n6.30 Interiors <\/td>\n<\/tr>\n
601<\/td>\n6.40 Document components, writing\/editing rules and uniformatUniFormat <\/td>\n<\/tr>\n
602<\/td>\n6.50 Survey Control Monuments\u2019 Locations and Descriptions
Electrical <\/td>\n<\/tr>\n
603<\/td>\n6.60 Acronyms <\/td>\n<\/tr>\n
607<\/td>\n6.70 Glossary <\/td>\n<\/tr>\n
608<\/td>\n6.80 Accessibility <\/td>\n<\/tr>\n
611<\/td>\n6.90 Facilities Master Planning Guide <\/td>\n<\/tr>\n
612<\/td>\n6.91 Wayfinding Masterplan <\/td>\n<\/tr>\n
666<\/td>\n6.92 BAS Graphics Standards <\/td>\n<\/tr>\n
696<\/td>\n6.93 Lactation Support Program <\/td>\n<\/tr>\n
703<\/td>\n6.94 ELECTRICAL
Arc-Flash and Shock Hazard Appropriate PPE Required <\/td>\n<\/tr>\n
704<\/td>\nArc-Flash and Shock Hazard Appropriate PPE Required <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

CDC Reference Guidelines – Design & Construction Standards<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
CDC<\/b><\/a><\/td>\n2017<\/td>\n723<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":180168,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2846],"product_tag":[],"class_list":{"0":"post-180166","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-cdc","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/180166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/180168"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=180166"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=180166"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=180166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}