{"id":194715,"date":"2024-10-19T12:21:20","date_gmt":"2024-10-19T12:21:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-81-2017\/"},"modified":"2024-10-25T04:52:24","modified_gmt":"2024-10-25T04:52:24","slug":"ieee-c37-81-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-81-2017\/","title":{"rendered":"IEEE C37.81 2017"},"content":{"rendered":"
Revision Standard – Active. Requirements and guidance for the seismic qualification of metal-enclosed power switchgear assemblies including switching, interrupting, control, instrumentation, metering, and protective and regulating devices mounted thereein are provided in this guide. As used in this guide, the word switchgear shall mean metal-enclosed power switchgear assemblies with the requirements as defined in IEEE Std C37.20.1\u2122, Standard for Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear, IEEE Std C37.20.2\u2122, Standard for Metal-Clad Switchgear, and IEEE Std C37.20.3\u2122, Standard for Metal-Enclosed Interrupter Switchgear. By definition, metal-enclosed power switchgear assemblies include metal-clad switchgear, metal-enclosed interrupter switchgear, and low-voltage power circuit breaker switchgear. Metal-enclosed bus or control switchboards are not covered in this guide.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C37.81\u2122-2017 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1.\u2002Overview 1.1\u2002Scope <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.\u2002Seismic criteria 4.1\u2002General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.2\u2002Proof testing 4.3\u2002Generic testing <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.4\u2002Information furnished by the user <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.\u2002Performance requirements 5.1\u2002General 5.2\u2002Functional performance criteria <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.3\u2002Operational performance criteria 5.4\u2002Structural performance criteria <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.5\u2002Demonstration of adequacy 6.\u2002Qualification methods 6.1\u2002Analysis 6.2\u2002Testing 6.3\u2002Combined test and analysis 6.4\u2002Experience 7.\u2002Testing and results 7.1\u2002Introduction <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.2\u2002Selection and test setup 7.3\u2002Resonance search procedure <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7.4\u2002Seismic test input 7.5\u2002Number and duration of tests 7.6\u2002Tests and measurements before seismic tests 7.7\u2002Tests and measurements during seismic tests <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.8\u2002Tests and measurements after seismic tests 7.9\u2002Refurbishment, maintenance, and repairs during testing <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8.\u2002Combined analysis and testing 8.1\u2002Introduction 8.2\u2002Analysis <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.3\u2002Test procedure 8.4\u2002Qualifying the complete assembly <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 9.\u2002Extrapolation for similar equipment 10.\u2002Documentation 10.1\u2002General 10.2\u2002Test qualification report <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 10.3\u2002Combined analysis and test qualification report <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 10.4\u2002Documentation for qualification by extrapolation <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Seismic Qualification of Class 1E Metal-Enclosed Power Switchgear Assemblies<\/b><\/p>\n |