{"id":211529,"date":"2024-10-19T13:41:06","date_gmt":"2024-10-19T13:41:06","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/boma-z65-2-2019\/"},"modified":"2024-10-25T06:29:31","modified_gmt":"2024-10-25T06:29:31","slug":"boma-z65-2-2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/boma\/boma-z65-2-2019\/","title":{"rendered":"BOMA Z65.2 2019"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Copyright <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | List of Illustrations <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Acknowledgements <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Executive Summary <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | About BOMA International About SIOR About ANSI <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | IPMS Compatibility <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | IPMS Compatibility cont… <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Application and Use <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Discrepancy (2%) Interpretation <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Source Information What’s New? <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 2.0 Learning the Standard <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 2.1 Boundary Area (IPMS 1-Industrial) 2.1 Boundary Conditions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 2.1 Boundary Conditions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 2.2 Space Classifications <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 2.3 Special Conditions <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 2.4 Put it all Together <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 2.4 Put it all Together \/ Floor 1 Boundary Area <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 2.4 Put it all Together \/ Floor 2 Boundary Area <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 2.4 Put it all Together \/ Floor 1 Boundary Area IPMS 1 <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 2.4 Put it all Together \/ Floor 1 Space Classifications <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 2.4 Put it all Together \/ Floor 2 Space Classifications <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 3.0 Applying the Standard <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 3.1 Global Summary of Areas Spreadsheet <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 3.1 Column Description <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 4.0 Advanced Concepts <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 4.1 Inter-Building Area <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 4.2 Capped Load Factors <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 5.0 Definitions <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ANSI\/BOMA Z65.2-2019: Industrial Buildings: Standard Methods of Measurement<\/b><\/p>\n |