{"id":213028,"date":"2024-10-19T13:48:05","date_gmt":"2024-10-19T13:48:05","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-19-30397774-dc\/"},"modified":"2024-10-25T06:41:04","modified_gmt":"2024-10-25T06:41:04","slug":"bsi-19-30397774-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-19-30397774-dc\/","title":{"rendered":"BSI 19\/30397774 DC"},"content":{"rendered":"

This part of ISO 16075<\/span><\/span> contains guidelines for the development and the execution of projects intending to use treated wastewater (TWW) for irrigation and considers the parameters of climate and soil.<\/p>\n

The purpose of these document is to provide guidance on all elements of a project using TWW for unrestricted and restricted irrigation, including design, materials, construction, and performance, when used for the following:<\/p>\n