{"id":218517,"date":"2024-10-19T14:10:35","date_gmt":"2024-10-19T14:10:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-22476-12012\/"},"modified":"2024-10-25T07:25:17","modified_gmt":"2024-10-25T07:25:17","slug":"bs-en-iso-22476-12012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-22476-12012\/","title":{"rendered":"BS EN ISO 22476-1:2012"},"content":{"rendered":"

This part of ISO 22476 deals with equipment requirements, the execution of and reporting on electrical cone and piezocone penetration tests.<\/p>\n

\n

NOTE 1 This part of ISO 22476 fulfills the requirements for electrical cone and piezocone penetration tests as part of geotechnical investigation and testing according to EN 1997-1 [3] and EN 1997-2 [4].<\/p>\n<\/blockquote>\n

Within the electrical cone and piezocone penetration test, two subcategories of the cone penetration test are considered:<\/p>\n