{"id":224215,"date":"2024-10-19T14:34:00","date_gmt":"2024-10-19T14:34:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-24516-12016\/"},"modified":"2024-10-25T08:18:54","modified_gmt":"2024-10-25T08:18:54","slug":"bs-iso-24516-12016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-24516-12016\/","title":{"rendered":"BS ISO 24516-1:2016"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4 Principles aspects of the management of assets 4.1 Objectives and requirements 4.1.1 Objectives 4.1.2 Functional requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.1.3 Performance requirements <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.2 General aspects 4.2.1 General 4.2.2 Principal aspects \u2014 Drinking water utilities <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.2.3 Principal aspects \u2014 Drinking water systems 4.2.4 Integrating the principal aspects <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.3 Risks and life cycle aspects 4.3.1 Risk <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.3.2 Life cycle 4.4 Structuring the process for management of assets 4.4.1 General <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.4.2 Strategies for the management of assets <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.4.3 Periods of planning <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.4.4 Strategic level activities 4.4.5 Tactical level activities 4.4.6 Operational level activities <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5 Investigation 5.1 General 5.2 Purpose of investigation 5.2.1 General 5.3 Determine the scope of the investigation 5.4 Data collection 5.4.1 General <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.4.2 Data requirements 5.4.3 Inventory data <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.4.4 Failure data 5.4.5 Further condition data <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.5 Data registering and data assignment 5.5.1 Data registering 5.5.2 Data assignment <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.5.3 Geo-referencing 5.6 Review of existing information 5.7 Inventory update <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.8 Types of investigation 5.8.1 Hydraulic investigation 5.8.2 Structural investigation 5.8.3 Operational investigation <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 5.9 Review of performance information <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 5.10 Planning of investigation 5.11 Performance testing 6 Assessment 6.1 Principles <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 6.2 Assessment of the hydraulic performance 6.3 Assessment of the structural condition 6.4 Assessment of operational performance 6.5 Compare with performance requirements <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 6.6 Identification of unacceptable impacts 6.7 Identify causes of performance deficiencies 7 Planning 7.1 General <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 7.2 Develop integrated solutions 7.3 Assess solutions <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 7.4 Prepare action plan 8 Implementation 8.1 General <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 8.2 Create\/update plan 8.3 Carry out work 8.4 Monitor performance 8.5 Review performance 9 Operation and maintenance 9.1 General <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 9.2 Operation <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 9.3 Maintenance 10 Rehabilitation 10.1 General <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 10.2 Strategic plan for rehabilitation of physical infrastructure (long-term planning) 10.2.1 General <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 10.2.2 Service life and failure rate development <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 10.2.3 Determining the need for rehabilitation of physical infrastructure <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 10.2.4 Budgeting 10.3 Tactical plan for rehabilitation of physical infrastructure (mid-term planning) 10.3.1 Risk-based evaluation approach <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 10.3.2 Individual evaluation and prioritizing <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 10.3.3 Coordination with other construction activities 10.4 Operational plan \u2014 Implementation of rehabilitation measures (short-term planning) 11 Documentation and efficiency review <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex\u00a0A (informative) Further objectives of the management of assets of drinking water networks <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex\u00a0B (informative) Examples for the assessment of service life and failure rates of pipes <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Annex\u00a0C (informative) Examples for risk consideration in management of assets <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Guidelines for the management of assets of water supply and wastewater systems – Drinking water distribution networks<\/b><\/p>\n |