{"id":224582,"date":"2024-10-19T14:35:33","date_gmt":"2024-10-19T14:35:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-2035-20302019-online-1-licence\/"},"modified":"2024-10-25T08:21:32","modified_gmt":"2024-10-25T08:21:32","slug":"bsi-pas-2035-20302019-online-1-licence","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-2035-20302019-online-1-licence\/","title":{"rendered":"BSI PAS 2035\/2030:2019, Online – 1 Licence"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nPAS2035_bookmarked <\/td>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
8<\/td>\n0 Introduction <\/td>\n<\/tr>\n
11<\/td>\n1 Scope <\/td>\n<\/tr>\n
13<\/td>\n2 Normative references <\/td>\n<\/tr>\n
15<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
18<\/td>\n4 Guidance about retrofit building physics
4.1 Introduction
4.2 Building pathology
4.3 Thermal models and calculations <\/td>\n<\/tr>\n
20<\/td>\n5 Guidance about approaches to retrofit
5.1 Retrofit performance considerations, standards and constraints
5.2 Medium-term improvement plans <\/td>\n<\/tr>\n
21<\/td>\n5.3 Retrofit at scale
5.4 Fabric first <\/td>\n<\/tr>\n
22<\/td>\n5.5 Concentrate on the interfaces
5.6 Retrofit advice <\/td>\n<\/tr>\n
23<\/td>\n6 Requirements for retrofit coordination and risk management
6.1 Retrofit Coordinator
6.2 Establishing intended outcomes <\/td>\n<\/tr>\n
24<\/td>\n7 Requirements for retrofit risk assessments
7.1 Risk assessment process
7.2 Consequences of the outcome of the risk assessment
7.3 Repeating the risk assessment <\/td>\n<\/tr>\n
25<\/td>\n8 Requirements for whole-dwelling assessments
8.1 The purpose of the assessment
8.2 The Retrofit Assessor
8.3 Assessment: Path A
8.4 Assessment: Path B <\/td>\n<\/tr>\n
26<\/td>\n8.5 Assessment: Path C
8.6 Reporting the assessment and handing over assessment data <\/td>\n<\/tr>\n
28<\/td>\n9 Requirements for retrofit designs
9.1 Design: Path A <\/td>\n<\/tr>\n
30<\/td>\n9.2 Design: Path B <\/td>\n<\/tr>\n
32<\/td>\n9.3 Design: Path C <\/td>\n<\/tr>\n
33<\/td>\n10 Requirements for installation of retrofit designs <\/td>\n<\/tr>\n
34<\/td>\n11 Requirements for testing and commissioning
11.1 Requirements for testing
11.2 Requirements for commissioning
11.3 Test certificates and commissioning records <\/td>\n<\/tr>\n
35<\/td>\n12 Requirements for handover
12.1 Specification of handover requirements
12.2 Handover recipients <\/td>\n<\/tr>\n
36<\/td>\n13 Requirements for retrofit advice
13.1 Qualifications for Retrofit Advisors
13.2 Delivery of retrofit advice
13.3 Retrofit advice: Path A <\/td>\n<\/tr>\n
37<\/td>\n13.4 Retrofit advice: Paths B and C <\/td>\n<\/tr>\n
38<\/td>\n14 Requirements for monitoring and evaluation
14.1 The purpose of monitoring and evaluation
14.2 Retrofit Evaluator
14.3 Levels of monitoring and evaluation
14.4 Basic monitoring and evaluation <\/td>\n<\/tr>\n
39<\/td>\n14.5 Intermediate monitoring and evaluation
14.6 Advanced monitoring and evaluation <\/td>\n<\/tr>\n
40<\/td>\n15 Claims of compliance
15.1 General
15.2 Basis of claim
15.3 Permitted forms of disclosure <\/td>\n<\/tr>\n
41<\/td>\n16 References
16.1 Retrofit framework standards <\/td>\n<\/tr>\n
43<\/td>\n16.2 List of references (other than formal standards, for guidance only) <\/td>\n<\/tr>\n
44<\/td>\nAnnex A (Normative) Qualifications <\/td>\n<\/tr>\n
47<\/td>\nAnnex B (Normative) Risk Assessments <\/td>\n<\/tr>\n
51<\/td>\nAnnex C (Normative) Requirements for provision of adequate ventilation <\/td>\n<\/tr>\n
56<\/td>\nAnnex D (Normative) Requirements for dealing with interactions between EEMs <\/td>\n<\/tr>\n
58<\/td>\nBibliography <\/td>\n<\/tr>\n
63<\/td>\nPAS2030_bookmarked <\/td>\n<\/tr>\n
65<\/td>\nContents <\/td>\n<\/tr>\n
67<\/td>\nForeword <\/td>\n<\/tr>\n
69<\/td>\nIntroduction <\/td>\n<\/tr>\n
71<\/td>\n1 Scope <\/td>\n<\/tr>\n
72<\/td>\n2 Normative references <\/td>\n<\/tr>\n
74<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
77<\/td>\n4 Retrofit project management <\/td>\n<\/tr>\n
78<\/td>\n5 The retrofit design
5.1 Installer responsibility to be in possession of a retrofit design
5.2 Validation of the retrofit design <\/td>\n<\/tr>\n
80<\/td>\n6 Installation process
6.1 Installation method statement
6.2 Installation equipment and tools <\/td>\n<\/tr>\n
81<\/td>\n6.3 Checking, handling and storage of materials and supplies
6.4 Provision of installation instructions to operatives
6.5 People <\/td>\n<\/tr>\n
82<\/td>\n6.6 Subcontract Installers
6.7 Testing
6.8 Commissioning
6.9 Handover <\/td>\n<\/tr>\n
83<\/td>\n6.10 Installation control
6.11 Installation documents and record keeping <\/td>\n<\/tr>\n
84<\/td>\n7 Installation process management
7.1 Operation and process oversight
7.2 Pre-installation building inspection <\/td>\n<\/tr>\n
85<\/td>\n7.3 Action in respect of intermediate inspection
7.4 Installation change
7.5 Process continuity plan <\/td>\n<\/tr>\n
86<\/td>\n7.6 Process control
7.7 Internal audit and corrective action
7.8 Installation process records
7.9 Business and financial probity <\/td>\n<\/tr>\n
87<\/td>\n8 Service provision
8.1 Complaints procedure
8.2 Complaints records
8.3 Interaction with clients <\/td>\n<\/tr>\n
88<\/td>\n9 Claims of compliance
9.1 Applicability of claims
9.2 Requirement to claim
9.3 Basis of claim <\/td>\n<\/tr>\n
89<\/td>\n10 Documents essential to the application of the Annexes of this PAS
10.1 Use of the identified documents
10.2 Publicly Available Specification and British Standards <\/td>\n<\/tr>\n
91<\/td>\n10.3 Institution of Gas Engineer and Managers \u2013 Standards
10.4 Energy Networks Association Engineering Recommendations
10.5 UKLPG
10.6 Ministry of Housing, Communities and Local Government
10.7 Other insulation installation guidance references <\/td>\n<\/tr>\n
92<\/td>\nAnnex A (normative)
\nMeasure-specific Annex\u00a0selection and co-installation requirements <\/td>\n<\/tr>\n
94<\/td>\nA.3 Explanation of PAS\u00a02030\u00a0measure-specific Annex\u00a0referencing system
Annex\u00a0B (normative) BFM energy efficiency measures
A.4 Interactions between EEMs <\/td>\n<\/tr>\n
96<\/td>\nA.5 Avoidance of thermal bridging <\/td>\n<\/tr>\n
97<\/td>\nAnnex B (normative)
\nBFM energy efficiency measures
B.1 Measure BFM.1\u00a0Cavity wall insulation including that installed in party walls <\/td>\n<\/tr>\n
100<\/td>\nB.2\u00a0Measure BFM.2\u00a0Draught proofing <\/td>\n<\/tr>\n
103<\/td>\nB.3\u00a0Measure BFM.3\u00a0\u2013\u00a0Energy efficient glazing and doors including replacement Insulating Glass Units (IGU) <\/td>\n<\/tr>\n
106<\/td>\nB.4\u00a0Measure BFM.4\u00a0\u2013\u00a0External wall insulation <\/td>\n<\/tr>\n
111<\/td>\nB.5\u00a0Measure BFM.5\u00a0Flat roof insulation <\/td>\n<\/tr>\n
114<\/td>\nB.6\u00a0Measure BFM.6\u00a0Floor insulation <\/td>\n<\/tr>\n
117<\/td>\nB.7\u00a0Measure BFM\u00a07\u00a0Hybrid wall insulation <\/td>\n<\/tr>\n
122<\/td>\nB.8\u00a0Measure BFM.8\u00a0Internal wall insulation <\/td>\n<\/tr>\n
127<\/td>\nB.9\u00a0Measure BFM.9\u00a0Loft insulation <\/td>\n<\/tr>\n
130<\/td>\nB.10\u00a0Measure BFM.10\u00a0Pitched roof insulation <\/td>\n<\/tr>\n
133<\/td>\nB.11\u00a0Measure BFM.11: Solar Blinds, Shutters and Shading Devices (internal and external). <\/td>\n<\/tr>\n
136<\/td>\nB.12\u00a0Measure BFM.12: Room-in-roof insulation <\/td>\n<\/tr>\n
138<\/td>\nB.13\u00a0Measure BFM.13: Insulation of existing park homes <\/td>\n<\/tr>\n
141<\/td>\nAnnex C (normative)
\nBSM energy efficiency measures
C.1\u00a0Measure BSM.1\u00a0Condensing boilers, natural gas-fired and liquefied petroleum gas-fired <\/td>\n<\/tr>\n
144<\/td>\nC.2\u00a0Measure BSM.2\u00a0Oil-fired condensing boilers <\/td>\n<\/tr>\n
147<\/td>\nC.3\u00a0Measure BSM.3\u00a0Flue-gas heat recovery devices <\/td>\n<\/tr>\n
149<\/td>\nC.4\u00a0Measure BSM.4: Heating system insulation (ducting, pipes and cylinders) <\/td>\n<\/tr>\n
151<\/td>\nC.5\u00a0Measure BSM.5\u00a0Heating, hot water system, air conditioning or ventilation controls and components <\/td>\n<\/tr>\n
154<\/td>\nC.6\u00a0Measure BSM.6\u00a0Hot water systems <\/td>\n<\/tr>\n
157<\/td>\nC.7\u00a0BSM.8\u00a0Mechanical Ventilation with Heat Recovery <\/td>\n<\/tr>\n
160<\/td>\nC.8\u00a0Measure BSM.8\u00a0Under-floor heating <\/td>\n<\/tr>\n
163<\/td>\nC.9\u00a0Measure BSM.9\u00a0Warm-air heating systems <\/td>\n<\/tr>\n
166<\/td>\nC.10\u00a0BSM.10\u00a0Water efficient taps and showers <\/td>\n<\/tr>\n
168<\/td>\nAnnex D (normative)
\nBSE energy efficiency measures
D.1\u00a0Measure BSE.1\u00a0Electric storage heaters (including electric warm air heating units that incorporate heat storage) <\/td>\n<\/tr>\n
171<\/td>\nD.2\u00a0Measure BSE.2\u00a0Lighting fittings, lighting systems and lighting system controls <\/td>\n<\/tr>\n
174<\/td>\nAnnex E (informative)
\nPAS\u00a02030:2017 to PAS\u00a02030:2019\u00a0\u2013 Substantive change <\/td>\n<\/tr>\n
177<\/td>\nAnnex F (informative)
\nInstaller guidance on the use and application of PAS\u00a02030:2019
F.1 Overview
F.2 A staged approach to installation <\/td>\n<\/tr>\n
179<\/td>\nAnnex G (informative)
\nExample installation project information collation form
G.1\u00a0Use of this form
G.2\u00a0Location of installation
G.3\u00a0Measure(s) to be installed <\/td>\n<\/tr>\n
180<\/td>\nG.4\u00a0Source of PAS 2035 compliant design (5.1)
G.5\u00a0Validation of design (5.2) <\/td>\n<\/tr>\n
181<\/td>\nG.6 Products and\/or system specified\/ to be installed
G.7\u00a0Installation method statement <\/td>\n<\/tr>\n
182<\/td>\nG.8\u00a0Installation process <\/td>\n<\/tr>\n
185<\/td>\nG.9 Operation and process oversight
G.10\u00a0Pre-installation building inspection <\/td>\n<\/tr>\n
187<\/td>\nG.11 Provision for any intermediate inspection required (7.3)
G.12\u00a0Installation change (7.4)
G.13 Process continuity (7.5)
G.14 Process control records (7.6 & 7.8) <\/td>\n<\/tr>\n
188<\/td>\nG.15\u00a0Details of any problems encountered during installation, corrections agreed and remedial work undertaken
G.16\u00a0Client complaints (8) <\/td>\n<\/tr>\n
189<\/td>\nG.17\u00a0Commissioning \u2013 EEM performance testing carried out
G.18\u00a0Record of information left with Client at handover
G.19\u00a0Installation sign-off <\/td>\n<\/tr>\n
190<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Retrofitting dwellings for improved energy efficiency. Specification and guidance<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2019<\/td>\n194<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":224588,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1273,2641],"product_tag":[],"class_list":{"0":"post-224582","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-140-10","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/224582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/224588"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=224582"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=224582"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=224582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}