{"id":224582,"date":"2024-10-19T14:35:33","date_gmt":"2024-10-19T14:35:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-2035-20302019-online-1-licence\/"},"modified":"2024-10-25T08:21:32","modified_gmt":"2024-10-25T08:21:32","slug":"bsi-pas-2035-20302019-online-1-licence","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-2035-20302019-online-1-licence\/","title":{"rendered":"BSI PAS 2035\/2030:2019, Online – 1 Licence"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | PAS2035_bookmarked <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 0 Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4 Guidance about retrofit building physics 4.1 Introduction 4.2 Building pathology 4.3 Thermal models and calculations <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5 Guidance about approaches to retrofit 5.1 Retrofit performance considerations, standards and constraints 5.2 Medium-term improvement plans <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.3 Retrofit at scale 5.4 Fabric first <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.5 Concentrate on the interfaces 5.6 Retrofit advice <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6 Requirements for retrofit coordination and risk management 6.1 Retrofit Coordinator 6.2 Establishing intended outcomes <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7 Requirements for retrofit risk assessments 7.1 Risk assessment process 7.2 Consequences of the outcome of the risk assessment 7.3 Repeating the risk assessment <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8 Requirements for whole-dwelling assessments 8.1 The purpose of the assessment 8.2 The Retrofit Assessor 8.3 Assessment: Path A 8.4 Assessment: Path B <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.5 Assessment: Path C 8.6 Reporting the assessment and handing over assessment data <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 9 Requirements for retrofit designs 9.1 Design: Path A <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.2 Design: Path B <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 9.3 Design: Path C <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 10 Requirements for installation of retrofit designs <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 11 Requirements for testing and commissioning 11.1 Requirements for testing 11.2 Requirements for commissioning 11.3 Test certificates and commissioning records <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 12 Requirements for handover 12.1 Specification of handover requirements 12.2 Handover recipients <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 13 Requirements for retrofit advice 13.1 Qualifications for Retrofit Advisors 13.2 Delivery of retrofit advice 13.3 Retrofit advice: Path A <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 13.4 Retrofit advice: Paths B and C <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 14 Requirements for monitoring and evaluation 14.1 The purpose of monitoring and evaluation 14.2 Retrofit Evaluator 14.3 Levels of monitoring and evaluation 14.4 Basic monitoring and evaluation <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 14.5 Intermediate monitoring and evaluation 14.6 Advanced monitoring and evaluation <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 15 Claims of compliance 15.1 General 15.2 Basis of claim 15.3 Permitted forms of disclosure <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 16 References 16.1 Retrofit framework standards <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 16.2 List of references (other than formal standards, for guidance only) <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex A (Normative) Qualifications <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex B (Normative) Risk Assessments <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex C (Normative) Requirements for provision of adequate ventilation <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Annex D (Normative) Requirements for dealing with interactions between EEMs <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Bibliography <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | PAS2030_bookmarked <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 4 Retrofit project management <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 5 The retrofit design 5.1 Installer responsibility to be in possession of a retrofit design 5.2 Validation of the retrofit design <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 6 Installation process 6.1 Installation method statement 6.2 Installation equipment and tools <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 6.3 Checking, handling and storage of materials and supplies 6.4 Provision of installation instructions to operatives 6.5 People <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 6.6 Subcontract Installers 6.7 Testing 6.8 Commissioning 6.9 Handover <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 6.10 Installation control 6.11 Installation documents and record keeping <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 7 Installation process management 7.1 Operation and process oversight 7.2 Pre-installation building inspection <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 7.3 Action in respect of intermediate inspection 7.4 Installation change 7.5 Process continuity plan <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 7.6 Process control 7.7 Internal audit and corrective action 7.8 Installation process records 7.9 Business and financial probity <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 8 Service provision 8.1 Complaints procedure 8.2 Complaints records 8.3 Interaction with clients <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 9 Claims of compliance 9.1 Applicability of claims 9.2 Requirement to claim 9.3 Basis of claim <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 10 Documents essential to the application of the Annexes of this PAS 10.1 Use of the identified documents 10.2 Publicly Available Specification and British Standards <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | 10.3 Institution of Gas Engineer and Managers \u2013 Standards 10.4 Energy Networks Association Engineering Recommendations 10.5 UKLPG 10.6 Ministry of Housing, Communities and Local Government 10.7 Other insulation installation guidance references <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | Annex A (normative) \nMeasure-specific Annex\u00a0selection and co-installation requirements <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | A.3 Explanation of PAS\u00a02030\u00a0measure-specific Annex\u00a0referencing system Annex\u00a0B (normative) BFM energy efficiency measures A.4 Interactions between EEMs <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | A.5 Avoidance of thermal bridging <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Annex B (normative) \nBFM energy efficiency measures B.1 Measure BFM.1\u00a0Cavity wall insulation including that installed in party walls <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | B.2\u00a0Measure BFM.2\u00a0Draught proofing <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | B.3\u00a0Measure BFM.3\u00a0\u2013\u00a0Energy efficient glazing and doors including replacement Insulating Glass Units (IGU) <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | B.4\u00a0Measure BFM.4\u00a0\u2013\u00a0External wall insulation <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | B.5\u00a0Measure BFM.5\u00a0Flat roof insulation <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | B.6\u00a0Measure BFM.6\u00a0Floor insulation <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | B.7\u00a0Measure BFM\u00a07\u00a0Hybrid wall insulation <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | B.8\u00a0Measure BFM.8\u00a0Internal wall insulation <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | B.9\u00a0Measure BFM.9\u00a0Loft insulation <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | B.10\u00a0Measure BFM.10\u00a0Pitched roof insulation <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | B.11\u00a0Measure BFM.11: Solar Blinds, Shutters and Shading Devices (internal and external). <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | B.12\u00a0Measure BFM.12: Room-in-roof insulation <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | B.13\u00a0Measure BFM.13: Insulation of existing park homes <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | Annex C (normative) \nBSM energy efficiency measures C.1\u00a0Measure BSM.1\u00a0Condensing boilers, natural gas-fired and liquefied petroleum gas-fired <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | C.2\u00a0Measure BSM.2\u00a0Oil-fired condensing boilers <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | C.3\u00a0Measure BSM.3\u00a0Flue-gas heat recovery devices <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | C.4\u00a0Measure BSM.4: Heating system insulation (ducting, pipes and cylinders) <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | C.5\u00a0Measure BSM.5\u00a0Heating, hot water system, air conditioning or ventilation controls and components <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | C.6\u00a0Measure BSM.6\u00a0Hot water systems <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | C.7\u00a0BSM.8\u00a0Mechanical Ventilation with Heat Recovery <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | C.8\u00a0Measure BSM.8\u00a0Under-floor heating <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | C.9\u00a0Measure BSM.9\u00a0Warm-air heating systems <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | C.10\u00a0BSM.10\u00a0Water efficient taps and showers <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | Annex D (normative) \nBSE energy efficiency measures D.1\u00a0Measure BSE.1\u00a0Electric storage heaters (including electric warm air heating units that incorporate heat storage) <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | D.2\u00a0Measure BSE.2\u00a0Lighting fittings, lighting systems and lighting system controls <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | Annex E (informative) \nPAS\u00a02030:2017 to PAS\u00a02030:2019\u00a0\u2013 Substantive change <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | Annex F (informative) \nInstaller guidance on the use and application of PAS\u00a02030:2019 F.1 Overview F.2 A staged approach to installation <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | Annex G (informative) \nExample installation project information collation form G.1\u00a0Use of this form G.2\u00a0Location of installation G.3\u00a0Measure(s) to be installed <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | G.4\u00a0Source of PAS 2035 compliant design (5.1) G.5\u00a0Validation of design (5.2) <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | G.6 Products and\/or system specified\/ to be installed G.7\u00a0Installation method statement <\/td>\n<\/tr>\n | ||||||
182<\/td>\n | G.8\u00a0Installation process <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | G.9 Operation and process oversight G.10\u00a0Pre-installation building inspection <\/td>\n<\/tr>\n | ||||||
187<\/td>\n | G.11 Provision for any intermediate inspection required (7.3) G.12\u00a0Installation change (7.4) G.13 Process continuity (7.5) G.14 Process control records (7.6 & 7.8) <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | G.15\u00a0Details of any problems encountered during installation, corrections agreed and remedial work undertaken G.16\u00a0Client complaints (8) <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | G.17\u00a0Commissioning \u2013 EEM performance testing carried out G.18\u00a0Record of information left with Client at handover G.19\u00a0Installation sign-off <\/td>\n<\/tr>\n | ||||||
190<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Retrofitting dwellings for improved energy efficiency. Specification and guidance<\/b><\/p>\n |