{"id":224735,"date":"2024-10-19T14:36:15","date_gmt":"2024-10-19T14:36:15","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-515-3r-2020\/"},"modified":"2024-10-25T08:22:39","modified_gmt":"2024-10-25T08:22:39","slug":"aci-515-3r-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-515-3r-2020\/","title":{"rendered":"ACI 515.3R 2020"},"content":{"rendered":"
This document provides general guidance for determining appropriate acceptance criteria for a prepared surface to receive a protection system. There are many techniques for preparation of a surface prior to installation of a protection system, and no single method is ideal for all situations. This guide discusses various preparation methods that can be used to achieve the intended surface condition. Keywords: coatings; membranes; protection systems; surface preparation.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | TITLE PAGE <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CHAPTER 1\u2014INTRODUCTION AND SCOPE 1.1\u2014Introduction 1.2\u2014Scope CHAPTER 2\u2014DEFINITIONS 2.1\u2013\u2013Definitions CHAPTER 3\u2014PROJECT EVALUATION 3.1\u2014Condition assessment of concrete <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3.2\u2014Moisture in and on concrete <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3.3\u2014Concrete surface <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3.4\u2014Previously applied protection systems <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3.5\u2014Contamination of concrete <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.6\u2014Repair of nonstructural defects <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | CHAPTER 4\u2014METHODS OF SURFACE PREPARATION 4.1\u2014Surface cleaning of concrete <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.2\u2014Abrasive blasting (wet or dry) 4.3\u2014Abrading concrete <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.4\u2014Hydrodemolition 4.5\u2014Other procedures <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | CHAPTER 5\u2014EVALUATION OF SURFACE AFTER\u00a0PREPARATION 5.1\u2014Minimum acceptable levels of preparation for various protection systems 5.2\u2014Surface profile <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3\u2014Special concerns for system materials that depend on adhesives 5.4\u2014Special concerns for materials that depend on bond strength <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.5\u2014Special concerns for materials that depend on penetration 5.6\u2014Influence of ambient conditions on adhesion CHAPTER 6\u2013\u2013QUALITY ASSURANCE AND QUALITY CONTROL 6.1\u2014Preinstallation conference <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2\u2014Mockups CHAPTER 7\u2013\u2013REFERENCES <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Authored documents <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ACI 515.3R-20: Guide for Assessment and Surface Preparation for Application of Protection Systems for Concrete<\/b><\/p>\n |