{"id":226149,"date":"2024-10-19T14:41:51","date_gmt":"2024-10-19T14:41:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-pas-62815-22013\/"},"modified":"2024-10-25T08:36:28","modified_gmt":"2024-10-25T08:36:28","slug":"bsi-pd-iec-pas-62815-22013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-pas-62815-22013\/","title":{"rendered":"BSI PD IEC\/PAS 62815-2:2013"},"content":{"rendered":"
IEC\/PAS 62815-2:2013(E) specifies the performance requirements for tubular type cold cathode fluorescent lamps for backlight unit purposes used to flat panel displays such as TV and monitor etc., hereafter called “lamps”. For other types of lamp, additionally it will be revised when a need for them is recognized.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4 Classification 5 Lamp requirements 5.1 General <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5.2 Tests 5.2.1 General 5.2.2 Construction 5.2.3 Starting characteristic 5.2.4 Luminance <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.2.5 Luminance uniformity 5.2.6 Effective luminance length (under consideration) 5.2.7 Chromaticity coordinates (under consideration) 5.2.8 Colour uniformity 5.2.9 Dark starting time 5.2.10 Tube surface temperature 5.2.11 Lead wire tensile strength 5.2.12 Lead wire bending 5.2.13 Life (Reference) <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.3 Marking Tables Table 1 \u2013 Measurement items of test for life and criteria of failure Table 2 \u2013 Assurance Table 3 \u2013 Inspection levels and the criteria for decision <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Annex A (normative) Dimensions and criteria of CCFL Figures Figure A.1 \u2013 Dimensions and criteria of CCFL <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Annex B (normative) Measurement points of CCFL Figure B.1 \u2013 Measurement point division method of CCFL <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Annex C (normative) Method of test for CCFL <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Figure C.1 \u2013 Test circuit (HOT-GND) Figure C.2 \u2013 Test circuit (HOT-HOT) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Cold cathode fluorescent lamps – Performance specifications<\/b><\/p>\n |