{"id":262126,"date":"2024-10-19T17:22:31","date_gmt":"2024-10-19T17:22:31","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-68962005\/"},"modified":"2024-10-25T13:11:54","modified_gmt":"2024-10-25T13:11:54","slug":"bs-68962005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-68962005\/","title":{"rendered":"BS 6896:2005"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British Standard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3 Terms and definitions hazardous area high-level ventilation low-level ventilation overhead radiant heater overhead radiant tube heater overhead luminous radiant heater <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 4 Selection of equipment and pre-installation 4.1 Exchange of information and planning <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4.2 Selection of heater or multi-burner system The CE Mark <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Heater (system) categories\/adjustment for UK gas supply conditions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4.3 Heat input requirements for full space heating 4.4 Materials and components <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5 Installation 5.1 Installation and siting <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.2 Heater\/multi-burner system air supply <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Type B11 overhead luminous radiant heater <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Type B12, type B13, type B22 and type B23 overhead radiant tube heaters <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Type C12, type C13, type C32 and type B33 overhead radiant tube heaters <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3 Building ventilation <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.4 Air Vents <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.5 Gas supplies and pipework 5.6 Electrical controls and connections <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.7 Other controls 5.8 Flues <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6 Post installation 6.1 Inspection 6.2 Commissioning 6.3 User instructions <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.4 Maintenance <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | (informative) Checks to be carried out prior to commissioning (informative) Checks to be carried out prior to commissioning <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | (informative) Testing for carbon dioxide in the environment (informative) Testing for carbon dioxide in the environment Occupational exposure limits <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Specification for installation of gas-fired overhead radiant heaters for industrial and commercial heating (2nd and 3rd family gases)<\/b><\/p>\n |