{"id":262334,"date":"2024-10-19T17:23:52","date_gmt":"2024-10-19T17:23:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-62302005-2006\/"},"modified":"2024-10-25T13:14:02","modified_gmt":"2024-10-25T13:14:02","slug":"bs-62302005-2006","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-62302005-2006\/","title":{"rendered":"BS 6230:2005 2006"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British Standard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3 Terms and definitions condensing appliance damper direct gas-fired air heater enclosure forced convection air heater grille <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | hazardous area indirect-fired air heater plant room plenum chamber recirculation air transportable direct-fired air heater 4 Selection of equipment and pre-installation 4.1 Exchange of information and planning <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4.2 Selection of air heaters <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | The CE mark <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Air heater categories\/adjustment for UK gas supply conditions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.3 Heat input rating for full space heating 4.4 Resistance of the air delivery system 4.5 Outside location 4.6 Materials and components 5 Installation 5.1 Installation and siting <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2 Heater air supply <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Type B1 heaters <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Type B2 heaters <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Type C1 heaters <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Type C3 heaters <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Minimum air vent free area for room-sealed type C1 or type C3 appliances installed in a plant room or enclosure <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.3 Building ventilation <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.4 Air vents 5.5 Ducting <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.6 Return air ducting 5.7 Gas supplies and pipework <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.8 Electrical controls and connections 5.9 Other controls <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.10 Flues for indirect gas-fired air heaters <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6 Post installation 6.1 Inspection 6.2 Commissioning 6.3 User instructions <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.4 Maintenance <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | (informative) Occupational exposure limit (informative) Occupational exposure limit Occupational exposure limits <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | (informative) Checks to be carried out prior to commissioning (informative) Checks to be carried out prior to commissioning (informative) Typical live run checks (informative) Typical live run checks <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Specification for installation of gas-fired forced convection air heaters for commercial and industrial space heating (2nd and 3rd family gases)<\/b><\/p>\n |