{"id":343417,"date":"2024-10-20T00:06:15","date_gmt":"2024-10-20T00:06:15","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-67982000-2005\/"},"modified":"2024-10-25T23:24:07","modified_gmt":"2024-10-25T23:24:07","slug":"bs-67982000-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-67982000-2005\/","title":{"rendered":"BS 6798:2000 2005"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nBRITISH STANDARD <\/td>\n<\/tr>\n
2<\/td>\nCommittees responsible for this British Standard <\/td>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
6<\/td>\n3 Terms and definitions
boiler compartment
combination boiler
condensing boiler
flue pipe
hot water storage combination unit
installer
open-flued boiler <\/td>\n<\/tr>\n
7<\/td>\nopen system
rated output
room-sealed boiler
sealed system
4 Selection of equipment and pre-installation
4.1 Exchange of information and planning <\/td>\n<\/tr>\n
8<\/td>\n4.2 Selection of boiler <\/td>\n<\/tr>\n
9<\/td>\n4.3 Condensing boilers <\/td>\n<\/tr>\n
13<\/td>\nConnection of condensate drainage pipe to soil and vent stack <\/td>\n<\/tr>\n
14<\/td>\nConnection of a condensate drainage pipe downstream of a sink waste trap <\/td>\n<\/tr>\n
15<\/td>\nConnection of a condensate drainage pipe upstream of a sink waste trap <\/td>\n<\/tr>\n
16<\/td>\nExternal termination of condensate drainage pipe <\/td>\n<\/tr>\n
17<\/td>\nExample of a purpose-made soakaway
4.4 ” Materials and components <\/td>\n<\/tr>\n
18<\/td>\n4.5 “Location
4.6 “Boiler rating
5 Installation
5.1 Air supply for combustion and ventilation
5.2 Flue system <\/td>\n<\/tr>\n
19<\/td>\n5.3 Installation and location <\/td>\n<\/tr>\n
21<\/td>\nFlue pipe clearances <\/td>\n<\/tr>\n
23<\/td>\n5.4 Protection <\/td>\n<\/tr>\n
25<\/td>\n5.5 Gas supplies and pipework <\/td>\n<\/tr>\n
26<\/td>\n5.6 Electricity supplies and wiring
5.7 Water supplies and pipework <\/td>\n<\/tr>\n
28<\/td>\n6 Post-installation
6.1 Inspection
6.2 Commissioning <\/td>\n<\/tr>\n
29<\/td>\n6.3 Advice to user <\/td>\n<\/tr>\n
30<\/td>\n(informative) CORGI registration and competency
(informative) CORGI registration and competency <\/td>\n<\/tr>\n
31<\/td>\nBS 6798:2000 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Specification for installation of gas-fired boilers of rated input not exceeding 70 kW net<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2005<\/td>\n32<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":343424,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1273,2641],"product_tag":[],"class_list":{"0":"post-343417","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-140-10","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/343417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/343424"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=343417"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=343417"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=343417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}