{"id":343417,"date":"2024-10-20T00:06:15","date_gmt":"2024-10-20T00:06:15","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-67982000-2005\/"},"modified":"2024-10-25T23:24:07","modified_gmt":"2024-10-25T23:24:07","slug":"bs-67982000-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-67982000-2005\/","title":{"rendered":"BS 6798:2000 2005"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British Standard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3 Terms and definitions boiler compartment combination boiler condensing boiler flue pipe hot water storage combination unit installer open-flued boiler <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | open system rated output room-sealed boiler sealed system 4 Selection of equipment and pre-installation 4.1 Exchange of information and planning <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4.2 Selection of boiler <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4.3 Condensing boilers <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Connection of condensate drainage pipe to soil and vent stack <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Connection of a condensate drainage pipe downstream of a sink waste trap <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Connection of a condensate drainage pipe upstream of a sink waste trap <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | External termination of condensate drainage pipe <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Example of a purpose-made soakaway 4.4 ” Materials and components <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.5 “Location 4.6 “Boiler rating 5 Installation 5.1 Air supply for combustion and ventilation 5.2 Flue system <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3 Installation and location <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Flue pipe clearances <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.4 Protection <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.5 Gas supplies and pipework <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.6 Electricity supplies and wiring 5.7 Water supplies and pipework <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6 Post-installation 6.1 Inspection 6.2 Commissioning <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.3 Advice to user <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | (informative) CORGI registration and competency (informative) CORGI registration and competency <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | BS 6798:2000 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Specification for installation of gas-fired boilers of rated input not exceeding 70 kW net<\/b><\/p>\n |