{"id":346683,"date":"2024-10-20T00:22:20","date_gmt":"2024-10-20T00:22:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-iec-tr-24748-32011\/"},"modified":"2024-10-25T23:49:53","modified_gmt":"2024-10-25T23:49:53","slug":"bsi-pd-iso-iec-tr-24748-32011","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-iec-tr-24748-32011\/","title":{"rendered":"BSI PD ISO\/IEC TR 24748-3:2011"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
9<\/td>\n1 Scope
2 Terms and definitions
3 Overview of ISO\/IEC\u00a012207:2008
3.1 General <\/td>\n<\/tr>\n
10<\/td>\n3.2 Structure of ISO\/IEC\u00a012207:2008
3.3 Context of ISO\/IEC\u00a012207:2008 <\/td>\n<\/tr>\n
12<\/td>\n3.4 Comparison to previous versions of ISO\/IEC\u00a012207 <\/td>\n<\/tr>\n
13<\/td>\n4 Application Concepts
4.1 Overview
4.2 Software concepts
4.2.1 System and software concepts <\/td>\n<\/tr>\n
15<\/td>\n4.3 Life cycle concepts
4.4 Process concepts
4.4.1 General
4.4.1.1 Introduction <\/td>\n<\/tr>\n
17<\/td>\n4.4.1.2 Inputs
4.4.1.3 Outputs
4.4.1.4 Controls
4.4.1.5 Enabling Mechanisms
4.4.2 Process principles
4.4.2.1 Introduction <\/td>\n<\/tr>\n
18<\/td>\n4.4.2.2 Modularity
4.4.2.3 Responsibility
4.4.3 Process categories of ISO\/IEC\u00a012207:2008
4.4.3.1 General <\/td>\n<\/tr>\n
19<\/td>\n4.4.3.2 System context process categories <\/td>\n<\/tr>\n
21<\/td>\n4.4.3.3 Software specific process categories <\/td>\n<\/tr>\n
23<\/td>\n4.4.4 Recursive\/iterative application of processes
4.4.4.1 General
4.4.4.2 Recursive application of processes <\/td>\n<\/tr>\n
24<\/td>\n4.4.4.3 Iterative application of processes <\/td>\n<\/tr>\n
25<\/td>\n4.4.4.4 Methods and tools
4.5 Organizational concepts
4.5.1 General <\/td>\n<\/tr>\n
26<\/td>\n4.5.2 Responsibility
4.5.3 Organizational relationships <\/td>\n<\/tr>\n
27<\/td>\n4.5.4 Project organizational structure
4.6 Project concepts
4.6.1 General <\/td>\n<\/tr>\n
28<\/td>\n4.6.2 Project relationships <\/td>\n<\/tr>\n
29<\/td>\n4.6.3 Enabling system relationships <\/td>\n<\/tr>\n
30<\/td>\n4.6.4 Hierarchy of projects <\/td>\n<\/tr>\n
31<\/td>\n4.7 Adaptation concepts
4.7.1 General <\/td>\n<\/tr>\n
32<\/td>\n4.7.2 Adaptation
4.7.3 Life cycle adaptation
4.7.4 Adaptation for domains, disciplines and specialties <\/td>\n<\/tr>\n
33<\/td>\n4.7.5 Tailoring
5 Applying ISO\/IEC\u00a012207:2008
5.1 Overview
5.2 Application strategy
5.2.1 Overview <\/td>\n<\/tr>\n
35<\/td>\n5.2.2 Planning the application
5.2.3 Conduct pilot project(s) <\/td>\n<\/tr>\n
36<\/td>\n5.2.4 Formalize the approach
5.2.5 Institutionalize the approach
5.3 Application in organizations
5.3.1 Overview <\/td>\n<\/tr>\n
37<\/td>\n5.3.2 Considerations and techniques
5.3.3 Application opportunities <\/td>\n<\/tr>\n
38<\/td>\n5.3.4 Management commitment
5.3.5 Uses of ISO\/IEC\u00a012207:2008 within an organization <\/td>\n<\/tr>\n
39<\/td>\n5.4 Application on projects
5.4.1 Overview <\/td>\n<\/tr>\n
40<\/td>\n5.4.2 Application of Agreement Processes on a project
5.4.2.1 Application of the Acquisition Process <\/td>\n<\/tr>\n
41<\/td>\n5.4.2.2 Application of the Supply Process <\/td>\n<\/tr>\n
43<\/td>\n5.4.3 Application of Technical Processes to a project
5.4.3.1 General <\/td>\n<\/tr>\n
45<\/td>\n5.4.3.2 Related Technical Processes for system definition
5.4.3.2.1 General
5.4.3.2.2 Stakeholder Requirements Definition Process
5.4.3.2.3 System Requirements Analysis Process <\/td>\n<\/tr>\n
46<\/td>\n5.4.3.2.4 System Architectural Design Process
5.4.3.2.4.1 General
5.4.3.2.4.2 Logical architecture definition <\/td>\n<\/tr>\n
47<\/td>\n5.4.3.2.4.3 Physical architectural design
5.4.3.2.4.3.1 General
5.4.3.2.4.3.2 Physical architectural design outputs <\/td>\n<\/tr>\n
48<\/td>\n5.4.3.2.4.3.3 Traceability of physical architectural design outputs
5.4.3.2.4.4 System structure definition <\/td>\n<\/tr>\n
49<\/td>\n5.4.3.3 Related Technical Processes for system realization
5.4.3.3.1 General
5.4.3.3.2 Implementation Process
5.4.3.3.3 System Integration Process
5.4.3.3.4 System Qualification Testing Process <\/td>\n<\/tr>\n
50<\/td>\n5.4.3.3.5 Software Installation Process
5.4.3.3.6 Software Acceptance Support Process <\/td>\n<\/tr>\n
51<\/td>\n5.4.3.4 Related technical processes for system utilization
5.4.3.4.1 General
5.4.3.4.2 Operation Process <\/td>\n<\/tr>\n
52<\/td>\n5.4.3.4.3 Maintenance Process
5.4.3.4.4 Disposal Process
5.4.3.5 Enabling system definition and realization <\/td>\n<\/tr>\n
53<\/td>\n5.4.4 Application of Software Implementation Processes to a project
5.4.4.1 Overview <\/td>\n<\/tr>\n
55<\/td>\n5.4.4.2 Related Software Implementation Processes for software definition
5.4.4.2.1 General
5.4.4.2.2 Software Requirements Analysis Process
5.4.4.2.3 Software Architectural Design Process
5.4.4.2.4 Software Detailed Design Process <\/td>\n<\/tr>\n
56<\/td>\n5.4.4.3 Related Software Implementation Processes for software realization
5.4.4.3.1 General
5.4.4.3.2 Software Construction Process
5.4.4.3.3 Software Integration Process
5.4.4.3.4 Software Qualification Testing Process
5.4.5 Application of processes in a life cycle model
5.4.5.1 Overview <\/td>\n<\/tr>\n
58<\/td>\n5.4.5.2 Organizational view
5.4.5.2.1 Approaches <\/td>\n<\/tr>\n
59<\/td>\n5.4.5.2.2 Sequential approach
5.4.5.2.2.1 General <\/td>\n<\/tr>\n
60<\/td>\n5.4.5.2.2.2 Applicable systems
5.4.5.2.2.3 Risks
5.4.5.2.2.4 Opportunities <\/td>\n<\/tr>\n
61<\/td>\n5.4.5.2.3 Incremental approach
5.4.5.2.3.1 General
5.4.5.2.3.2 Applicable systems
5.4.5.2.3.3 Risks
5.4.5.2.3.4 Opportunities <\/td>\n<\/tr>\n
62<\/td>\n5.4.5.2.4 Evolutionary approach
5.4.5.2.4.1 General
5.4.5.2.4.2 Applicable systems
5.4.5.2.4.3 Risks
5.4.5.2.4.4 Opportunities <\/td>\n<\/tr>\n
63<\/td>\n5.4.5.3 Engineering view
5.4.5.3.1 General <\/td>\n<\/tr>\n
65<\/td>\n5.4.5.3.2 Technical reviews <\/td>\n<\/tr>\n
66<\/td>\n5.4.5.3.3 Configuration audits <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Systems and software engineering. Life cycle management – Guide to the application of ISO\/IEC 12207 (Software life cycle processes)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2013<\/td>\n122<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":346690,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-346683","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/346683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/346690"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=346683"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=346683"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=346683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}