{"id":381032,"date":"2024-10-20T03:09:40","date_gmt":"2024-10-20T03:09:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-500052021\/"},"modified":"2024-10-26T05:43:18","modified_gmt":"2024-10-26T05:43:18","slug":"bs-iso-500052021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-500052021\/","title":{"rendered":"BS ISO 50005:2021"},"content":{"rendered":"

This document gives guidance for organizations on establishing a phased approach to implement an energy management system (EnMS). This phased approach is intended to support and simplify the implementation of an EnMS for all types of organizations, in particular for small and medium-sized organizations (SMOs).<\/p>\n

This document gives guidance on the use of twelve core elements with four levels of maturity for each element to establish, implement, maintain and improve an EnMS that results in energy performance improvement.<\/p>\n

It enables the user of this document to implement a phased approach to achieve a level of energy management appropriate to its objectives and to build a strong foundation which can subsequently be extended towards meeting the requirements of ISO 50001:2018<\/span><\/span> . This document is consistent with ISO 50001:2018<\/span><\/span> but does not cover all of its requirements.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nNational foreword <\/td>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms and definitions
4 The maturity model approach to implementing an EnMS
4.1 Explanation and structure of the maturity model <\/td>\n<\/tr>\n
11<\/td>\n4.2 Phased implementation of an EnMS using the maturity model
4.2.1 General
4.2.2 Assess the organization\u2019s initial situation <\/td>\n<\/tr>\n
12<\/td>\n4.2.3 Set and confirm a goal for the phased implementation <\/td>\n<\/tr>\n
13<\/td>\n4.2.4 Set up a simple business case
4.2.5 Set up a project plan
4.2.6 Monitor the implementation of the project plan
4.2.7 Gap analysis versus ISO 50001:2018
5 Description of elements and levels
5.1 Element 1 \u2014 Context of the organization <\/td>\n<\/tr>\n
15<\/td>\n5.2 Element 2 \u2014 Leadership <\/td>\n<\/tr>\n
16<\/td>\n5.3 Element 3 \u2014 Resources <\/td>\n<\/tr>\n
17<\/td>\n5.4 Element 4 \u2014 Energy review <\/td>\n<\/tr>\n
19<\/td>\n5.5 Element 5 \u2014 Energy performance indicators and energy baselines <\/td>\n<\/tr>\n
21<\/td>\n5.6 Element 6 \u2014 Objectives, energy targets and action plans <\/td>\n<\/tr>\n
22<\/td>\n5.7 Element 7 \u2014 Competence and awareness <\/td>\n<\/tr>\n
23<\/td>\n5.8 Element 8 \u2014 Operations and maintenance <\/td>\n<\/tr>\n
24<\/td>\n5.9 Element 9 \u2014 Procurement and design <\/td>\n<\/tr>\n
25<\/td>\n5.10 Element 10 \u2013 Process for communication and control of documented information <\/td>\n<\/tr>\n
26<\/td>\n5.11 Element 11 \u2014 Monitoring, measurement, analysis and evaluation of energy performance <\/td>\n<\/tr>\n
27<\/td>\n5.12 Element 12 \u2014 Management review and improvement <\/td>\n<\/tr>\n
30<\/td>\nAnnex A (informative) Continual improvement and advancing of the EnMS <\/td>\n<\/tr>\n
33<\/td>\nAnnex B (informative) Level version of the maturity model <\/td>\n<\/tr>\n
49<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Energy management systems. Guidelines for a phased implementation<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2021<\/td>\n50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":381041,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-381032","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/381032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/381041"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=381032"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=381032"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=381032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}