{"id":395708,"date":"2024-10-20T04:20:56","date_gmt":"2024-10-20T04:20:56","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-ptc-47-3-2021\/"},"modified":"2024-10-26T08:07:12","modified_gmt":"2024-10-26T08:07:12","slug":"asme-ptc-47-3-2021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-ptc-47-3-2021\/","title":{"rendered":"ASME PTC 47.3 2021"},"content":{"rendered":"

The object of this Code is to provide uniform test methods and procedures for the determination of the performance of the syngas-conditioning block, which is located between the gasification block and the power block.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
7<\/td>\nNOTICE <\/td>\n<\/tr>\n
8<\/td>\nFOREWORD <\/td>\n<\/tr>\n
9<\/td>\nASME PTC COMMITTEE ROSTER <\/td>\n<\/tr>\n
10<\/td>\nCORRESPONDENCE WITH THE PTC COMMITTEE <\/td>\n<\/tr>\n
12<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
14<\/td>\nSection 1 Object and Scope
1-1 OBJECT <\/td>\n<\/tr>\n
15<\/td>\n1-2 SCOPE
1-3 UNCERTAINTY
Tables
Table 1-3-1 Largest Expected Test Uncertainties of Performance Parameters <\/td>\n<\/tr>\n
16<\/td>\n1-4 REFERENCES <\/td>\n<\/tr>\n
17<\/td>\nSection 2 Definitions and Description of Terms
2-1 GENERAL
2-2 DEFINITIONS <\/td>\n<\/tr>\n
19<\/td>\nFigures
Figure 2-2-1 Contaminant Removal <\/td>\n<\/tr>\n
20<\/td>\n2-3 ACRONYMS <\/td>\n<\/tr>\n
22<\/td>\nSection 3 Guiding Principles
3-1 TEST BOUNDARY AND REQUIRED MEASUREMENTS
Figure 3-1-1 Syngas-Conditioning Block Test Boundary <\/td>\n<\/tr>\n
23<\/td>\n3-2 PREPARATIONS FOR TESTING
3-2.1 Object of Test
3-2.2 General Precaution
3-2.3 Agreements
3-2.4 Preliminary Test Runs <\/td>\n<\/tr>\n
24<\/td>\n3-3 TESTS
3-3.1 Preparation
3-3.2 Location and Identification of Instruments
3-3.3 Stabilization
3-3.4 Starting and Stopping
3-3.5 Readjustments
3-3.6 Frequency and Timing of Observations
3-3.7 Data Collection
3-3.8 Conduct of Test <\/td>\n<\/tr>\n
25<\/td>\n3-4 OPERATING CONDITIONS
3-4.1 Operating Philosophy
3-4.2 Permissible Deviations
3-4.3 Inconsistent Measurements
Table 3-4.2-1 Guidance for Establishing Permissible Deviations From Design <\/td>\n<\/tr>\n
26<\/td>\n3-5 POST-TEST ANALYSIS
3-5.1 Evaluation of Test Runs
Figure 3-5.1-1 Uncertainty Intervals <\/td>\n<\/tr>\n
27<\/td>\n3-5.2 Causes for Rejection of Test Runs
3-5.3 Uncertainty
3-5.4 Application of Correction Methods
3-6 RECORDS: DATA RECORDS AND TEST LOG <\/td>\n<\/tr>\n
28<\/td>\nSection 4 Instruments and Methods of Measurement
4-1 INTRODUCTION
4-2 GENERAL REQUIREMENTS
4-2.1 Introduction
4-2.2 Measurements <\/td>\n<\/tr>\n
29<\/td>\n4-2.3 Instrumentation <\/td>\n<\/tr>\n
30<\/td>\n4-2.4 Instrument Calibration <\/td>\n<\/tr>\n
32<\/td>\n4-2.5 Instrument Verification
4-2.6 Instrumentation Systematic Uncertainty
4-3 PRESSURE MEASUREMENT
4-3.1 Introduction <\/td>\n<\/tr>\n
33<\/td>\nTable 4-2.6-1 Potential Instrumentation Systematic Uncertainty <\/td>\n<\/tr>\n
36<\/td>\n4-3.2 Required Uncertainty
4-3.3 Recommended Pressure Measurement Devices <\/td>\n<\/tr>\n
37<\/td>\n4-3.4 Absolute Pressure Measurements <\/td>\n<\/tr>\n
38<\/td>\n4-3.5 Gauge Pressure Measurements <\/td>\n<\/tr>\n
39<\/td>\n4-3.6 Differential Pressure Measurements
4-4 TEMPERATURE MEASUREMENT
4-4.1 Introduction <\/td>\n<\/tr>\n
40<\/td>\nFigure 4-3.6.2-1 Five-Way Manifold
Figure 4-3.6.2-2 Water-Leg Correction for Flow Measurement <\/td>\n<\/tr>\n
41<\/td>\n4-4.2 Required Uncertainty
4-4.3 Recommended Temperature Measurement Devices <\/td>\n<\/tr>\n
43<\/td>\nFigure 4-4.3.2.1-1 Three- and Four-Wire RTDs <\/td>\n<\/tr>\n
44<\/td>\n4-4.4 Calibration of Primary Parameter Temperature Measurement Devices <\/td>\n<\/tr>\n
45<\/td>\n4-4.5 Temperature Scale
4-4.6 Typical Applications for Temperature Measurement <\/td>\n<\/tr>\n
46<\/td>\n4-5 LIQUID FLOW MEASUREMENT
4-5.1 Water
Figure 4-4.6.2-1 Flow-Through Well <\/td>\n<\/tr>\n
47<\/td>\nFigure 4-4.6.3-1 Duct Measurement Points <\/td>\n<\/tr>\n
48<\/td>\n4-6 STEAM FLOW MEASUREMENT
4-6.1 Steam Flow Characteristics
4-6.2 Secondary Steam Flow Measurements
4-6.3 Two-Phase Steam\u2013Water Mixtures <\/td>\n<\/tr>\n
49<\/td>\n4-7 GAS FLOW MEASUREMENT
4-7.1 Digital Computation of Gas Flow Rate
4-8 MATERIAL ANALYSIS
4-8.1 Sample Collection <\/td>\n<\/tr>\n
50<\/td>\n4-8.2 Analytical Techniques
4-9 AUXILIARY ELECTRIC POWER MEASUREMENT
4-9.1 Introduction
4-9.2 Electrical Metering Equipment <\/td>\n<\/tr>\n
51<\/td>\n4-9.3 Measurement of Step-Up and Step-Down Transformers
4-10 DATA COLLECTION AND HANDLING
4-10.1 Introduction <\/td>\n<\/tr>\n
52<\/td>\n4-10.2 Data Management
4-10.3 Data Acquisition System Selection <\/td>\n<\/tr>\n
53<\/td>\nSection 5 Calculations and Results
5-1 INTRODUCTION
5-2 DATA REDUCTION
5-3 FUNDAMENTAL EQUATIONS
5-3.1 Nomenclature <\/td>\n<\/tr>\n
54<\/td>\n5-3.2 Corrected Product Syngas Energy
5-3.3 Corrected Auxiliary Power <\/td>\n<\/tr>\n
55<\/td>\n5-3.4 Corrected Syngas-Conditioning Efficiency
5-4 CORRECTIONS
5-4.1 Syngas-Conditioning Block Models <\/td>\n<\/tr>\n
56<\/td>\n5-4.2 Additive and Multiplicative Corrections <\/td>\n<\/tr>\n
57<\/td>\nTable 5-4.2-1 Additive and Multiplicative Corrections <\/td>\n<\/tr>\n
58<\/td>\n5-5 PARAMETERS USED IN THE FUNDAMENTAL EQUATIONS
5-5.1 Heating Value, LHV <\/td>\n<\/tr>\n
59<\/td>\n5-5.2 Product Syngas Energy Flow, Qpg
5-5.3 Inlet Syngas Energy Flow, Qsg <\/td>\n<\/tr>\n
60<\/td>\nSection 6 Report of Results
6-1 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
61<\/td>\n6-2 EXECUTIVE SUMMARY
6-3 INTRODUCTION
6-4 CALCULATIONS AND RESULTS
6-5 INSTRUMENTATION <\/td>\n<\/tr>\n
62<\/td>\n6-6 CONCLUSIONS
6-7 APPENDICES <\/td>\n<\/tr>\n
63<\/td>\nSection 7 Uncertainty Analysis
7-1 INTRODUCTION
7-1.1 Pretest Uncertainty Analysis
7-1.2 Post-Test Uncertainty Analysis
7-2 OBJECTIVE OF UNCERTAINTY ANALYSIS
7-3 DETERMINATION OF OVERALL UNCERTAINTY <\/td>\n<\/tr>\n
64<\/td>\n7-4 SOURCES OF ERROR
7-5 CALCULATION OF UNCERTAINTY
Table 7-5-1 Expected Uncertainty Limits <\/td>\n<\/tr>\n
65<\/td>\nTable 7-5-2 Format of Uncertainty Calculations <\/td>\n<\/tr>\n
66<\/td>\n7-6 SENSITIVITY COEFFICIENTS
Table 7-5-3 Measured Parameters Needed for Uncertainty Calculations <\/td>\n<\/tr>\n
67<\/td>\n7-7 SYSTEMATIC UNCERTAINTY
7-8 RANDOM STANDARD UNCERTAINTY FOR SPATIALLY UNIFORM PARAMETERS <\/td>\n<\/tr>\n
68<\/td>\n7-9 RANDOM STANDARD UNCERTAINTY FOR SPATIALLY NONUNIFORM PARAMETERS <\/td>\n<\/tr>\n
69<\/td>\n7-10 CORRELATED SYSTEMATIC STANDARD UNCERTAINTY <\/td>\n<\/tr>\n
70<\/td>\nNONMANDATORY APPENDIX A SAMPLE CALCULATION: IGCC SYNGAS-CONDITIONING BLOCK
A-1 GENERAL
A-2 CYCLE DESCRIPTION
A-3 BASIS FOR EXAMPLE CASE
A-4 TEST BOUNDARY
A-5 TEST CORRECTIONS <\/td>\n<\/tr>\n
71<\/td>\nFigure A-2-1 Syngas-Conditioning Block Process Flow Diagram <\/td>\n<\/tr>\n
72<\/td>\nTable A-3-1 Reference Design Data <\/td>\n<\/tr>\n
73<\/td>\nFigure A-4-1 Syngas-Conditioning Block Flow Diagram
A-5.1 AP1 \u2014 Auxiliary Power Correction for Inlet Syngas CO2
A-5.2 AP2 \u2014 Auxiliary Power Correction for Inlet Syngas COS
A-5.3 AP3 \u2014 Auxiliary Power Correction for Inlet Syngas H2O
A-5.4 AP4 \u2014 Auxiliary Power Correction for Inlet Syngas H2S
A-5.5 AP6 \u2014 Auxiliary Power Correction for Plant Cooling Water Temperature
A-5.6 AP7 \u2014 Auxiliary Power Correction for Syngas Inlet Temperature
A-5.7 MS1 \u2014 Product Syngas Energy Correction for Inlet Syngas CO2 <\/td>\n<\/tr>\n
74<\/td>\nTable A-5-1 Additive and Multiplicative Corrections
A-5.8 MS2 \u2014 Product Syngas Energy Correction for Inlet Syngas COS
A-5.9 MS3 \u2014 Product Syngas Energy Correction for Inlet Syngas H2O
A-5.10 MS4 \u2014 Product Syngas Energy Correction for Inlet Syngas H2S
A-5.11 MS5 \u2014 Product Syngas Energy Correction for Inlet Syngas Flow
A-5.12 MP5 \u2014 Auxiliary Power Correction for Inlet Syngas Flow
A-6 REFERENCE AND MEASURED CONDITIONS <\/td>\n<\/tr>\n
75<\/td>\nFigure A-5.1-1 Auxiliary Power Correction for Inlet Syngas CO2
Figure A-5.2-1 Auxiliary Power Correction for Inlet Syngas COS <\/td>\n<\/tr>\n
76<\/td>\nFigure A-5.3-1 Auxiliary Power Correction for Inlet Syngas H2O
Figure A-5.4-1 Auxiliary Power Correction for Inlet Syngas H2S <\/td>\n<\/tr>\n
77<\/td>\nFigure A-5.5-1 Auxiliary Power Correction for Plant Cooling Water Temperature
Figure A-5.6-1 Auxiliary Power Correction for Syngas Inlet Temperature <\/td>\n<\/tr>\n
78<\/td>\nFigure A-5.7-1 Product Syngas Energy Correction for Inlet Syngas CO2
Figure A-5.8-1 Product Syngas Energy Correction for Inlet Syngas COS <\/td>\n<\/tr>\n
79<\/td>\nFigure A-5.9-1 Product Syngas Energy Correction for Inlet Syngas H2O
Figure A-5.10-1 Product Syngas Energy Correction for Inlet Syngas H2S <\/td>\n<\/tr>\n
80<\/td>\nFigure A-5.11-1 Product Syngas Energy Correction for Inlet Syngas Flow
Figure A-5.12-1Auxiliary Power Correction for Inlet Syngas Flow <\/td>\n<\/tr>\n
81<\/td>\nTable A-6-1 Reference and Test Conditions for Syngas-Conditioning Block
A-7 CORRECTED PERFORMANCE CALCULATIONS
A-7.1 Corrected Product Syngas Energy <\/td>\n<\/tr>\n
82<\/td>\nTable A-7.2-1 Syngas-Conditioning Block Auxiliary Power
A-7.2 Corrected Auxiliary Power <\/td>\n<\/tr>\n
83<\/td>\nA-7.3 Corrected Conditioning Efficiency
A-8 CONCLUSIONS <\/td>\n<\/tr>\n
84<\/td>\nTable A-7.3-1 Test Result Details <\/td>\n<\/tr>\n
85<\/td>\nNONMANDATORY APPENDIX B SAMPLE UNCERTAINTY ANALYSIS
B-1 GENERAL
B-2 PERFORMANCE EQUATIONS
B-2.1 Corrected Product Syngas Energy
B-2.2 Corrected Syngas-Conditioning Efficiency <\/td>\n<\/tr>\n
86<\/td>\nB-2.3 Corrected Auxiliary Power
B-3 MEASURED PARAMETERS <\/td>\n<\/tr>\n
87<\/td>\nB-4 SENSITIVITY COEFFICIENTS
B-5 UNCERTAINTY VALUES <\/td>\n<\/tr>\n
88<\/td>\nTable B-4-1 Sensitivity Coefficients
Table B-5-1 Calculated and Expected Uncertainty Limits <\/td>\n<\/tr>\n
89<\/td>\nTable B-5-2 Uncertainty of Corrected Product Syngas Energy <\/td>\n<\/tr>\n
90<\/td>\nTable B-5-3 Uncertainty of Corrected Conditioning Efficiency <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME PTC 47.3-2021 – Syngas-Conditioning Block of an Integrated Gasification Combined Cycle Power Plant<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2021<\/td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":395716,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-395708","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/395708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/395716"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=395708"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=395708"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=395708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}