{"id":397664,"date":"2024-10-20T04:31:35","date_gmt":"2024-10-20T04:31:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1017-2013-2\/"},"modified":"2024-10-26T08:19:39","modified_gmt":"2024-10-26T08:19:39","slug":"ieee-1017-2013-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1017-2013-2\/","title":{"rendered":"IEEE 1017-2013"},"content":{"rendered":"
Revision Standard – Active. Procedures and test voltage values for acceptance and maintenance testing of electric submersible pump (ESP) cable systems are presented. This recommended practice applies to cable systems rated 3 kV and 5 kV (phase to phase) and is intended only for this special-purpose cable. The intent is to provide uniform test procedures and guidelines for evaluation of the test results.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1017\u2122-2013 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Patents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Important notice \n 1. Overview 1.1 Background <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.2 Scope 1.3 Purpose 2. Normative references 3. Definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4. Safety 4.1 Description 4.2 Application 4.3 Procedures to secure cable test area <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5. General considerations 5.1 Environmental influences <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2 Test equipment 5.3 Equipment setup 5.4 Special fault-locating test equipment <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.5 Equipment maintenance 6. DC high-pot test methods 6.1 Precautions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2 Procedures <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7. Evaluation of dc high-pot test results 7.1 Current-time relationship 7.2 Interpretation <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.3 Dielectric failure 7.4 Current comparison 8. Conductor resistivity and continuity tests <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 9. Mechanical integrity 10. Testing of surface feedthroughs and connections 10.1 Description 10.2 Wellhead with feedthrough <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 10.3 Wellhead with connections 10.4 Visual Inspection 10.5 Test procedures for surface equipment <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Field Testing Electric Submersible Pump Cable<\/b><\/p>\n |