{"id":402812,"date":"2024-10-20T05:03:03","date_gmt":"2024-10-20T05:03:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-22-30441348-dc\/"},"modified":"2024-10-26T08:59:32","modified_gmt":"2024-10-26T08:59:32","slug":"bsi-22-30441348-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-22-30441348-dc\/","title":{"rendered":"BSI 22\/30441348 DC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions 3.2 Abbreviated Terms <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Description of different degrees of distribution in planning and design <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5 Generalized elements of wastewater treatment and reuse systems 5.1 General 5.2 Collection <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.3 Conveyance <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.4 Treatment <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.5 Effluent reuse management 6 Cost items to be considered in economic life cycle analysis calculations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.1 Investment cost or CAPEX items (CI) <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.2 Operating cost items (CO) <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.3 Maintenance cost items (CM) <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.4 Income or revenue \u2013 Negative Cost Items (CN) <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7 Cost calculations, factoring and results integration 7.1 Conversion of all costs to present value <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.2 Normalization of all costs per unit <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8 Reporting on results of economic life cycle analysis calculations <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex\u00a0A (informative) Cost calculation example <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex\u00a0B (informative) Correlations for CAPEX and OPEX of different process units in a\u00a0treatment plant for reuse <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex\u00a0C (informative) Summary of treatment process units along with their associated cost items <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS ISO 24575. Guidelines for cost analysis in planning of decentralized wastewater treatment and\/or reuse<\/b><\/p>\n |