{"id":407691,"date":"2024-10-20T05:27:13","date_gmt":"2024-10-20T05:27:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-433-2009-2\/"},"modified":"2024-10-26T09:54:43","modified_gmt":"2024-10-26T09:54:43","slug":"ieee-433-2009-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-433-2009-2\/","title":{"rendered":"IEEE 433-2009"},"content":{"rendered":"
Revision Standard – Inactive-Reserved. This recommended practice describes very low frequency withstand and diagnostic tests that are performed on the stator windings of ac electric machines.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 433\u2122-2009 Front cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Acknowledgments <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Interpretations Patents Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Important notice 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.3 Background 2. Normative references <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4. Preparations for test 4.1 General 4.2 Air-cooled machines <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.3 Hydrogen-cooled machines 4.4 Liquid-cooled stator (armature) windings 4.5 Oil-cooled machines 4.6 Isolation of the winding from cables and auxiliary equipment <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.7 Sectionalizing the winding 4.8 Equipment clearances and area isolation 4.9 Grounding precautions <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5. General test considerations 5.1 Possibility of failure to pass test 5.2 Condition of winding 5.3 Test voltage determination <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6. Test equipment 6.1 Equipment specifications 6.2 Instrumentation 6.3 Protection of equipment and test specimen 6.4 Power source to the very low frequency test equipment 6.5 Operation check <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.6 Ground connections 6.7 High-voltage test connections 7. Test procedure 7.1 Overpotential tests 7.2 Diagnostic tests <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 8. Test results 8.1 Interpretation 8.2 Suggested test record 8.3 Record comments regarding <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Annex A (informative) Information on testing <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex B (informative) Glossary <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex C (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Insulation Testing of AC Electric Machinery with High Voltage at Very Low Frequency (Redline)<\/b><\/p>\n |