{"id":407965,"date":"2024-10-20T05:28:22","date_gmt":"2024-10-20T05:28:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c215-2022\/"},"modified":"2024-10-26T09:56:22","modified_gmt":"2024-10-26T09:56:22","slug":"awwa-c215-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c215-2022\/","title":{"rendered":"AWWA C215 2022"},"content":{"rendered":"
The purpose of this standard is to provide purchasers, manufacturers, and constructors with the minimum requirements for extruded polyole?n coatings for steel water pipe, including material, application, inspection, testing, marking, handling, and packaging requirements.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | Foreword I.\tIntroduction. I.A.\tBackground.\u2003Extruded polyole\ufb01n pipe-coating systems were \ufb01rst applied on steel pipe in 1956 using a crosshead-die extrusion system. In 1965, side extrusion was introduced in Europe and became available in the United States in 1972. I.B.\tHistory.\u2003The \ufb01rst edition of ANSI\/AWWA C215 was approved by the AWWA Board of Directors on June 19, 1988, and had an effective date of Jan. 1, 1989. The second edition of ANSI\/AWWA C215 was approved on Jan. 30, 1994, and had an effective date of Nov. II.\tSpecial Issues.\u2003ANSI\/AWWA C215 is intended to govern the exterior coating of steel water pipelines for underground or underwater installation under normal conditions. It is based on current experience, but it is not intended for unquali\ufb01ed use under a III.\tUse of This Standard.\u2003It is the responsibility of the user of an AWWA standard to determine that the products described in that standard are suitable for use in the particular application being considered. III.A.\tPurchaser Options and Alternatives.\u2003The following items should be provided by the purchaser: <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | IV.\tMajor Revisions.\u2003The major revisions made to the standard in this edition include the following: <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | V.\tComments.\u2003If you have any comments or questions about this standard, please call AWWA Engineering and Technical Services at 303.794.7711; FAX at 303.795.7603; write to the department at 6666 West Quincy Avenue, Denver, CO 80235-3098; or email at standa <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Sec. 1.1\tScope <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Sec. 1.2\tPurpose Sec. 1.3\tApplication SECTION 2:\tREFERENCES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | SECTION 3:\tDEFINITIONS SECTION 4:\tREQUIREMENTS Sec. 4.1\tEquipment <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Sec. 4.2\tMaterials and Workmanship Sec. 4.3\tCoating System <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Sec. 4.4\tSurface Preparation <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Sec. 4.5\tCoating Application <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Sec. 4.6\tCoating Fittings and Specials <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Sec. 4.7\tCoating Repair Sec. 4.8\tField Joints \u2013 Welded and Non-Welded <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Sec. 4.9\tField Procedures SECTION 5:\tVERIFICATION Sec. 5.1\tCoating Materials Prequali\ufb01cation Sec 5.2 Requirements of Coating System <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Sec. 5.3\tQuality Assurance and Records Sec. 5.4\tInspection and Testing by the Purchaser Sec. 5.5\tQuality-Control Requirements of Applied Coating Systems (Types A, B, and C) <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Sec. 5.6\tRejection SECTION 6:\tDELIVERY Sec. 6.1\tMarking <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Sec. 6.2\tPackaging and Shipping Sec. 6.3\tA\ufb03davit of Compliance <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C215-22 Extruded Polyolefin Coatings for Steel Pipe<\/b><\/p>\n |