{"id":421335,"date":"2024-10-20T06:35:39","date_gmt":"2024-10-20T06:35:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-62862-1-22017\/"},"modified":"2024-10-26T12:20:37","modified_gmt":"2024-10-26T12:20:37","slug":"bsi-pd-iec-ts-62862-1-22017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-62862-1-22017\/","title":{"rendered":"BSI PD IEC\/TS 62862-1-2:2017"},"content":{"rendered":"
This part of IEC 62862 defines the procedures for the creation of annual solar radiation data sets (ASR) for solar thermal electricity (STE) plant simulation.<\/p>\n
In addition to the definition of procedures needed for the ASR construction, its components and parameters will be also described.<\/p>\n
The scope of application of this document refers to the needs associated with solar thermal power plant projects and mainly related to the simulation of an annual period with a solar radiation sum close to a normal annual value (from among an estimation of all possible annual values).<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Elements forming the ASR data set 4.1 Geographic and time identification 4.1.1 Geographic identification <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.1.2 Time reference 4.1.3 Time frequency 4.2 Variables 4.2.1 General 4.2.2 Mandatory variable 4.2.3 Other variables <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.3 Format 5 Procedures and methodology for ASR generation 5.1 General Tables Table 1 \u2013 Direct solar irradiance place label values <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2 Measurement campaign 5.2.1 General 5.2.2 Quality control 5.2.3 Validation and gap filling Figure 1 \u2013 Sections of ASR generation procedure <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.3 Study of the representative long-term value 5.3.1 General 5.3.2 One source <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Table 2 \u2013 Table format for the estimation of a representativelong-term value based on one data source <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.3.3 Several sources <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table 3 \u2013 Table format for estimating the representative long-term valuefrom several different data sources <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.4 Generation of the representative series 5.4.1 General 5.4.2 Procedure based on estimates 5.4.3 Procedure based on measurement campaign <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6 Report <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex A (informative) Expression and relationships between formats of types of time <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Annex B (informative) General recommendations for measurement stations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex C (informative) Equivalence of measurement station locations <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Annex D (informative) Quality control of measured data D.1 General D.2 Procedure 1: checking for physically possible values Table D.1 \u2013 Quality control procedure 1 \u2013 Physically possible values <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | D.3 Procedure 2: checking for extremely rare values D.4 Procedure 3: checking for coherence of radiation variables Table D.2 \u2013 Quality control procedure 2 \u2013 Extremely rare values Table D.3 \u2013 Quality control procedure 3 \u2013 Coherence of variables <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Solar thermal electric plants – General. Creation of annual solar radiation data set for solar thermal electric (STE) plant simulation<\/b><\/p>\n |