{"id":425533,"date":"2024-10-20T06:57:22","date_gmt":"2024-10-20T06:57:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-cen-clc-tr-17603-10-022021-3\/"},"modified":"2024-10-26T13:07:02","modified_gmt":"2024-10-26T13:07:02","slug":"bsi-pd-cen-clc-tr-17603-10-022021-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-cen-clc-tr-17603-10-022021-3\/","title":{"rendered":"BSI PD CEN\/CLC\/TR 17603-10-02:2021"},"content":{"rendered":"
This handbook provides additional information for the application of the verification standard EN 16603-10-02 to a space system product.<\/p>\n
This handbook does not contain requirements and therefore cannot be made applicable. In case of conflict between the standard and this handbook, the standard prevails.<\/p>\n
This handbook is relevant for both the customer and the supplier of the product during all project phases.<\/p>\n
To facilitate the cross-reference, this handbook follows as much as is practical, the structure of the standard and quotes the requirements, to make it self standing and easier to read (the text from the standard is in italic<\/i>).<\/p>\n
As the Standard applies to different products at different product levels from single equipment to the overall system (including space segment hardware and software, launchers and Transportation Systems, ground segment, Verification tools, and GSE) several examples of tailoring, to match the specificity of each application, are proposed in Annex B.<\/p>\n
Specific discipline related verification aspects are covered in other dedicated standards and handbooks. In particular the detailed aspects for Testing are covered in the EN 16603-10-03 and in its corresponding handbook TR 17603-10-03.<\/p>\n
The application of the requirements of the standard to a particular project is intended to result in effective product verification and consequently to a high confidence in achieving successful product operations for the intended use, in this respect this handbook has the goal to help reaching these objectives.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3.1 Terms from other documents 3.2 Terms specific to the present handbook <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3.3 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.1 Introduction 4.2 Verification versus Validation <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.3 Applicability to all engineering domains 4.4 Development <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.1 Verification process 5.2 Verification planning 5.2.1 Verification approach 5.2.1.1 General <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.2.1.2 What <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2.1.3 How <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2.1.4 When (stage and event) <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.2.2 Verification methods 5.2.2.1 General <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.2.2.2 Test <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.2.2.3 Analysis <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.2.2.4 Review\ufffdof\ufffddesign (ROD) <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.2.2.5 Inspection 5.2.3 Verification levels <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.2.4 Verification stages 5.2.4.1 General 5.2.4.2 Qualification <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.2.4.3 Acceptance 5.2.4.4 Pre-launch 5.2.4.5 In-orbit <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.2.4.6 Post-landing 5.2.5 Models and Models Description 5.2.5.1 Introduction <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.2.5.2 Models description <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.2.5.3 Model philosophies description <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.2.5.4 Product matrix <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 5.2.6 Verification tools 5.2.6.1 General 5.2.6.2 Ground Support Equipment (GSE) <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 5.2.6.3 Software validation facility (SVF) 5.2.6.4 Simulators 5.2.6.5 Software tools for verification by analysis <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 5.2.6.6 Integration & test facilities and test tools 5.2.7 Verification process phasing 5.2.7.1 General <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 5.2.7.2 Phase A 5.2.7.3 Phase B 5.2.7.4 Phase C <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 5.2.7.5 Phase D 5.2.7.6 Phase E 5.2.7.7 Phase F 5.2.7.8 Verification flow <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 5.3 Verification execution and reporting 5.3.1 General 5.3.2 Example of verification team responsibility and interfaces 5.3.2.1 Verification team responsibility <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 5.3.2.2 Relationship with specific engineering disciplines 5.3.2.3 Relationship with product assurance and quality control <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 5.3.2.4 Relationship with project management and product\/quality assurance 5.4 Verification control and close-out 5.4.1 General <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 5.4.2 Verification control board (VCB) 5.4.3 Re-verification <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 6.1 Introduction <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 6.2 Verification planning documents 6.2.1 Verification plan (VP) 6.2.1.1 General 6.2.1.2 VP DRD explanation <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 6.2.2 Verification control document (VCD) 6.2.2.1 General <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 6.2.2.2 VCD DRD explanation <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 6.2.3 Other verification planning Documents 6.2.3.1 Assembly, Integration and Test plan (AITP) <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 6.2.3.2 Test Requirement Specification 6.3 Verification execution and reporting documentation 6.3.1 Test report (TRPT) 6.3.1.1 General <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 6.3.1.2 TRPT DRD explanation <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 6.3.2 Analysis report (ARPT) 6.3.2.1 General <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 6.3.3 Review-of-design report (RRPT) 6.3.3.1 General <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 6.3.3.2 RRPT DRD explanation <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | 6.3.4 Inspection report (IRPT) 6.3.4.1 General <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 6.3.4.2 IRPT DRD explanation <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 6.3.5 Verification report (VRPT) 6.3.5.1 General <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 6.3.6 VRPT DRD explanation <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 6.3.7 Other verification execution and reporting Document 6.3.7.1 Test Specification (TSPE) <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 6.3.7.2 Test Procedures (TPRO) 6.3.7.3 Miscellaneous <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 6.3.8 Other close-out documents <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Space engineering. Verification guidelines<\/b><\/p>\n |