{"id":430069,"date":"2024-10-20T07:21:30","date_gmt":"2024-10-20T07:21:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-506-4r-2019-werrata2022\/"},"modified":"2024-10-26T14:00:22","modified_gmt":"2024-10-26T14:00:22","slug":"aci-506-4r-2019-werrata2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-506-4r-2019-werrata2022\/","title":{"rendered":"ACI 506.4R 2019 wERRATA2022"},"content":{"rendered":"
This document provides information on the evaluation of both dry-mix and wet-mix shotcrete. It is assumed throughout the document that shotcrete is a method of placing concrete. However, for the sake of readability, the word \u201cshotcrete\u201d is often used either to identify the shotcrete process (method) or the shotcrete mixture (product) in the present document. Evaluation of in-place shotcrete requires experience, education, and engineering judgment. This document serves as a guide for engineers, inspectors, contractors, and others involved in accepting, rejecting, or evaluating in-place dry- or wet-mix shotcrete. Keywords: absorption and voids test; beam test; bond pullout test; density; drilled core test; end-beam tester; in-place density; mockup panel; nailing guns method; needle penetrometer; nondestructive testing; penetrating probe method; round panel test; soil penetrometer<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | TITLE PAGE <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CHAPTER 1\u2014INTRODUCTION AND SCOPE 1.1\u2014Introduction 1.2\u2014Scope CHAPTER 2\u2014DEFINITIONS CHAPTER 3\u2014PLANNING TESTING PROGRAM 3.1\u2014General <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 3.2\u2014Standards 3.3\u2014Planning CHAPTER 4\u2014EVALUATION OF FRESHLY MIXED SHOTCRETE 4.1\u2014General 4.2\u2014Shotcrete mixture proportions 4.3\u2014Tests applicable for wet-mix shotcrete 4.4\u2014Tests applicable for dry-mix shotcrete 4.5\u2014Frequency and relevance <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CHAPTER 5\u2014TEST PANEL PRODUCTION AND TEST SPECIMEN SAMPLING 5.1\u2014General 5.2\u2014Test panels <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 5.3\u2014Materials 5.4\u2014Procedure 5.5\u2014Curing 5.6\u2014Obtaining specimens from panels 5.7\u2014Reporting test panel data CHAPTER 6\u2014EVALUATION OF EARLY-AGE STRENGTH 6.1\u2014General <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 6.2\u2014Field test methods <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 6.3\u2014Frequency CHAPTER 7\u2014STRENGTH 7.1\u2014General 7.2\u2014Destructive testing <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 7.3\u2014Nondestructive testing 7.4\u2014Frequency <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 7.5\u2014Relevance CHAPTER 8\u2014VOIDS AND BOND 8.1\u2014General 8.2\u2014Sounding 8.3\u2014Wetting 8.4\u2014Bond pulloff testing <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 8.5\u2014Nondestructive test methods 8.6\u2014Frequency 8.7\u2014Relevance CHAPTER 9\u2014POROSITY AND PERMEABILITY 9.1\u2014General 9.2\u2014Density, absorption, and voids in hardened concrete 9.3\u2014Permeability tests 9.4\u2014Concrete\u2019s ability to resist chloride ion penetration <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 9.5\u2014Density 9.6\u2014Frequency 9.7\u2014Relevance CHAPTER 10\u2014ACCEPTANCE CRITERIA FOR SHOTCRETE 10.1\u2014General 10.2\u2014Application difficulty levels <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 10.3\u2014Acceptance criteria for defects and reinforcement encapsulation quality in shotcrete <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 10.4\u2014Examples for specification of acceptance criteria for shotcrete CHAPTER 11\u2014PRECONSTRUCTION TESTING 11.1\u2014General <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 11.2\u2014Preconstruction approaches 11.3\u2014Procedure outline 11.4\u2014Details <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | CHAPTER 12\u2014EVALUATION OF IN-PLACE SHOTCRETE 12.1\u2014General 12.2\u2014Preliminary investigations 12.3\u2014Detailed investigations <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | CHAPTER 13\u2014REFERENCES <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Authored documents APPENDIX A\u2014QUALITY ASSURANCE FLOWCHART <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ACI PRC-506.4-19: Guide for the Evaluation of Shotcrete with ERRATA as of April 5, 2022<\/b><\/p>\n |