{"id":434166,"date":"2024-10-20T07:42:39","date_gmt":"2024-10-20T07:42:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-14972-152021\/"},"modified":"2024-10-26T14:38:06","modified_gmt":"2024-10-26T14:38:06","slug":"bs-en-14972-152021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-14972-152021\/","title":{"rendered":"BS EN 14972-15:2021"},"content":{"rendered":"
This document specifies fire testing requirements for water mist systems used for fire protection of combustion turbines in enclosures with volumes not exceeding 260 m\u00b3.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions 4 General requirements <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5 Test enclosure requirements <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6 Combustion turbine mock-up requirements <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 7 Test equipment requirements 8 Instrumentation requirements <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 9 Fire test requirements 9.1 General <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 9.2 Unshielded 1 MW diesel spray fire 9.3 Shielded 1 MW diesel spray fire <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 9.4 Shielded 1 m2 diesel pool fire <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 9.5 Shielded 2 MW diesel spray fire, system performance under limited natural ventilation 9.6 Shielded 2 MW diesel spray fire, system performance at smaller enclosure volumes <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 9.7 Spray cooling (optional test) <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9.8 Saturated insulation mat and spray fire (optional test) 9.9 Large saturated insulation mat (optional test) <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 10 Test report <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 1 National Annex NA (informative) Further recommendations and guidance on the application of BS EN 14972-10. 1.1 General 1.2 Hazard evaluation 1.3 Limits of application 1.4 Ventilation conditions 1.5 Obstructions <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 1.6 Test report <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | NATIONAL ANNEX NB (informative) <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Fixed firefighting systems. Water mist systems – Test protocol for combustion turbines in enclosures not exceeding 260 m\u00b3 for open nozzle systems<\/b><\/p>\n |