{"id":440997,"date":"2024-10-20T08:18:49","date_gmt":"2024-10-20T08:18:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/icc-imc-2024-1stptg\/"},"modified":"2024-10-26T15:31:02","modified_gmt":"2024-10-26T15:31:02","slug":"icc-imc-2024-1stptg","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/icc\/icc-imc-2024-1stptg\/","title":{"rendered":"ICC IMC 2024 1stptg"},"content":{"rendered":"
The 2024 International Codes (I-Codes ) have undergone substantial formatting changes as part of the digital transformation strategy of the International Code Council (ICC ) to improve the user experience. The changes, promoting a cleaner, more modern look and enhancing readability and sustainability, include: Single column text format and modernized font styles improves readability QR Codes replace vertical margin sidebars and arrows to identify code changes more accurately Shading for table headers and notes improves locating tables and applicable notes Grouping of associated content brings tables and figures immediately after the parent section Users have capability to validate authenticity of their book and register it with the ICC to receive incentives. The International Mechanical Code (IMC ) establishes minimum regulations for mechanical systems using prescriptive and performance-related provisions. The IMC was developed with broad-based principles that make possible the use of new and innovative materials, methods and design. For the most current adoptions details go to International Code Adoptions. Important changes in the 2024 IMC include: Provisions prohibiting the use of domestic ductless range hoods in Groups I-1 and I-2 were removed. An identification requirement was added for Group A2L and B2L refrigerants. The requirements for machinery rooms containing Group A2L refrigerants were changed and Group B2L refrigerants were added to the provisions. Limits for the use of Group A1 and A2L refrigerants changed in high probability systems used for human comfort, unless permitted as excepted. UL 2158A Standard was added to the requirements for commercial dryer exhaust. Ventilation requirements for outpatient healthcare facilities to match the requirements in ASHRAE 62.1-2019. Addition of a new minimum landing at the roof hatch for personnel to safely use the hatch when accessing the roof for repair and maintenance. Addition of a new testing option for grease ductwork. Requirements for steam baths were added. A new standard requirement for refrigeration systems containing carbon dioxide was added.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 2024 INTERNATIONAL MECHANICAL CODE\u00ae <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | 2024 INTERNATIONAL MECHANICAL CODE\u00ae <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | COPYRIGHT <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | PREFACE FORMATTING CHANGES TO THE 2024 INTERNATIONAL CODES <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | CHAPTER 1: SCOPE AND ADMINSITRATION PART 1\u2014SCOPE AND APPLICATION SECTION 101\u2014SCOPE AND GENERAL REQUIREMENTS SECTION 102\u2014APPLICABILITY <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | PART 2\u2014ADMINISTRATION AND ENFORCEMENT SECTION 103\u2014CODE COMPLIANCE AGENCY SECTION 104\u2014DUTIES AND POWERS OF THE CODE OFFICIAL <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | SECTION 105\u2014PERMITS <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | SECTION 106\u2014CONSTRUCTION DOCUMENTS SECTION 107\u2014NOTICE OF APPROVAL <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | SECTION 108\u2014FEES SECTION 109\u2014SERVICE UTILITIES SECTION 110\u2014TEMPORARY USES, EQUIPMENT AND SYSTEMS SECTION 111\u2014INSPECTIONS AND TESTING <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | SECTION 112\u2014MEANS OF APPEALS SECTION 113\u2014BOARD OF APPEALS SECTION 114\u2014VIOLATIONS <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SECTION 115\u2014STOP WORK ORDER <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | CHAPTER 2: DEFINITIONS SECTION 201\u2014GENERAL SECTION 202\u2014GENERAL DEFINITIONS <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | CHAPTER 3: GENERAL REGULATIONS SECTION 301\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | SECTION 302\u2014PROTECTION OF STRUCTURE SECTION 303\u2014EQUIPMENT AND APPLIANCE LOCATION <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | SECTION 304\u2014INSTALLATION <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | SECTION 305\u2014PIPING SUPPORT <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | TABLE 305.4\u2014PIPING SUPPORT SPACINGa SECTION 306\u2014ACCESS AND SERVICE SPACE <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | SECTION 307\u2014CONDENSATE DISPOSAL TABLE 307.2.2\u2014CONDENSATE DRAIN SIZING <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | SECTION 308\u2014CLEARANCE REDUCTION <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | TABLE 308.4.2\u2014CLEARANCE REDUCTION METHODSb SECTION 309\u2014TEMPERATURE CONTROL SECTION 310\u2014EXPLOSION CONTROL <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | SECTION 311\u2014SMOKE AND HEAT VENTS SECTION 312\u2014HEATING AND COOLING LOAD CALCULATIONS <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | CHAPTER 4: VENTILATION SECTION 401\u2014GENERAL TABLE 401.5\u2014OPENING SIZES IN LOUVERS, GRILLES AND SCREENS PROTECTING AIR INTAKE OPENINGS <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | SECTION 402\u2014NATURAL VENTILATION SECTION 403\u2014MECHANICAL VENTILATION <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | TABLE 403.3.1.1\u2014MINIMUM VENTILATION RATES <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | TABLE 403.3.1.1\u2014MINIMUM VENTILATION RATES\u2014continued <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | TABLE 403.3.1.1\u2014MINIMUM VENTILATION RATES\u2014continued <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | TABLE 403.3.1.1\u2014MINIMUM VENTILATION RATES\u2014continued <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | TABLE 403.3.1.1\u2014MINIMUM VENTILATION RATES\u2014continued TABLE 403.3.1.1.1.2\u2014ZONE AIR DISTRIBUTION EFFECTIVENESSa, b, c, d EQUATION 4-1 <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | TABLE 403.3.1.1.1.2\u2014ZONE AIR DISTRIBUTION EFFECTIVENESSa, b, c, d\u2014continued EQUATION 4-2 EQUATION 4-3 EQUATION 4-4 EQUATION 4-5 TABLE 403.3.1.1.2.3.2\u2014SYSTEM VENTILATION EFFICIENCYa, b <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | TABLE 403.3.1.1.2.3.2\u2014SYSTEM VENTILATION EFFICIENCYa, b\u2014continued EQUATION 4-6 EQUATION 4-7 EQUATION 4-8 EQUATION 4-9 <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | TABLE 403.3.2.3\u2014MINIMUM REQUIRED LOCAL EXHAUST RATES FOR GROUP R-2, R-3 AND R-4 OCCUPANCIES SECTION 404\u2014ENCLOSED PARKING GARAGES SECTION 405\u2014SYSTEMS CONTROL SECTION 406\u2014VENTILATION OF UNINHABITED SPACES SECTION 407\u2014AMBULATORY CARE FACILITIES AND GROUP I-2 OCCUPANCIES <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | CHAPTER 5: EXHAUST SYSTEMS SECTION 501\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | SECTION 502\u2014REQUIRED SYSTEMS <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | SECTION 503\u2014MOTORS AND FANS <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | SECTION 504\u2014CLOTHES DRYER EXHAUST <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | TABLE 504.9.4.1\u2014DRYER EXHAUST DUCT FITTING EQUIVALENT LENGTH <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | SECTION 505\u2014DOMESTIC COOKING EXHAUST EQUIPMENT <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | SECTION 506\u2014COMMERCIAL KITCHEN HOOD VENTILATION SYSTEM DUCTS AND EXHAUST EQUIPMENT <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | SECTION 507\u2014COMMERCIAL KITCHEN HOODS <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | TABLE 507.2.8\u2014MINIMUM DISTANCE BETWEEN THE LOWEST EDGE OF A GREASE FILTER AND THE COOKING SURFACE OR THE HEATING SURFACE <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | SECTION 508\u2014COMMERCIAL KITCHEN MAKEUP AIR SECTION 509\u2014HAZARDOUS EXHAUST SYSTEMS <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | TABLE 509.8\u2014MINIMUM DUCT THICKNESS TABLE 509.8.2\u2014CLEARANCE TO COMBUSTIBLES <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | TABLE 509.8.2\u2014CLEARANCE TO COMBUSTIBLES\u2014continued SECTION 510\u2014DUST, STOCK AND REFUSE CONVEYING SYSTEMS <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | TABLE 510.2\u2014CONSTRUCTION, CLEARANCE AND TERMINATION REQUIREMENTS FOR SINGLE-WALL METAL CHIMNEYS SECTION 511\u2014SUBSLAB SOIL EXHAUST SYSTEMS SECTION 512\u2014SMOKE CONTROL SYSTEMS <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | SECTION 513\u2014ENERGY RECOVERY VENTILATION SYSTEMS <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | CHAPTER 6: DUCT SYSTEMS SECTION 601\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | SECTION 602\u2014PLENUMS <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | SECTION 603\u2014DUCT CONSTRUCTION AND INSTALLATION TABLE 603.4\u2014DUCT CONSTRUCTION MINIMUM SHEET METAL THICKNESS FOR SINGLE DWELLING UNITSa <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | TABLE 603.4\u2014DUCT CONSTRUCTION MINIMUM SHEET METAL THICKNESS FOR SINGLE DWELLING UNITSa\u2014continued <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | SECTION 604\u2014INSULATION <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | SECTION 605\u2014AIR FILTERS SECTION 606\u2014SMOKE DETECTION SYSTEMS CONTROL <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | SECTION 607\u2014DUCT AND TRANSFER OPENINGS [BF] TABLE 607.3.2.1\u2014FIRE DAMPER RATING <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | SECTION 608\u2014BALANCING <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | CHAPTER 7: COMBUSTION AIR SECTION 701\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | CHAPTER 8: CHIMNEYS AND VENTS SECTION 801\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | SECTION 802\u2014VENTS TABLE 802.2\u2014VENT APPLICATION <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | SECTION 803\u2014CONNECTORS TABLE 803.9(1)\u2014MINIMUM CHIMNEY CONNECTOR THICKNESS FOR LOW-HEAT APPLIANCES <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | TABLE 803.9(2)\u2014MINIMUM CHIMNEY CONNECTOR THICKNESS FOR MEDIUM- AND HIGH-HEAT APPLIANCES TABLE 803.10.4\u2014CHIMNEY CONNECTOR SYSTEMS AND CLEARANCES TO COMBUSTIBLE WALL MATERIALS FOR DOMESTIC HEATING APPLIANCESa, b, c, d <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | TABLE 803.10.6\u2014CONNECTOR CLEARANCES TO COMBUSTIBLES SECTION 804\u2014DIRECT-VENT, INTEGRAL VENT AND MECHANICAL DRAFT SYSTEMS <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | SECTION 805\u2014FACTORY-BUILT CHIMNEYS <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | SECTION 806\u2014METAL CHIMNEYS <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | CHAPTER 9: SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT SECTION 901\u2014GENERAL SECTION 902\u2014MASONRY FIREPLACES SECTION 903\u2014FACTORY-BUILT FIREPLACES SECTION 904\u2014PELLET FUEL-BURNING APPLIANCES SECTION 905\u2014FIREPLACE STOVES AND ROOM HEATERS SECTION 906\u2014FACTORY-BUILT BARBECUE APPLIANCES <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | SECTION 907\u2014INCINERATORS AND CREMATORIES SECTION 908\u2014COOLING TOWERS, EVAPORATIVE CONDENSERS AND FLUID COOLERS SECTION 909\u2014VENTED WALL FURNACES SECTION 910\u2014FLOOR FURNACES <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | SECTION 911\u2014DUCT FURNACES SECTION 912\u2014INFRARED RADIANT HEATERS SECTION 913\u2014CLOTHES DRYERS SECTION 914\u2014SAUNA HEATERS <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | SECTION 915\u2014ENGINE AND GAS TURBINE-POWERED EQUIPMENT AND APPLIANCES SECTION 916\u2014POOL AND SPA HEATERS SECTION 917\u2014COOKING APPLIANCES SECTION 918\u2014FORCED-AIR WARM-AIR FURNACES SECTION 919\u2014CONVERSION BURNERS SECTION 920\u2014UNIT HEATERS SECTION 921\u2014VENTED ROOM HEATERS SECTION 922\u2014KEROSENE AND OIL-FIRED STOVES <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | SECTION 923\u2014SMALL CERAMIC KILNS SECTION 924\u2014STATIONARY FUEL CELL POWER SYSTEMS SECTION 925\u2014MASONRY HEATERS SECTION 926\u2014GASEOUS HYDROGEN SYSTEMS SECTION 927\u2014RADIANT HEATING SYSTEMS SECTION 928\u2014EVAPORATIVE COOLING EQUIPMENT SECTION 929\u2014UNVENTED ALCOHOL FUEL-BURNING DECORATIVE APPLIANCES SECTION 930\u2014LARGE-DIAMETER CEILING FANS <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | SECTION 931\u2014STEAM BATH EQUIPMENT <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | CHAPTER 10: BOILERS, WATER HEATERS AND PRESSURE VESSELS SECTION 1001\u2014GENERAL SECTION 1002\u2014WATER HEATERS SECTION 1003\u2014PRESSURE VESSELS <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | SECTION 1004\u2014BOILERS TABLE 1004.3.1\u2014BOILER TOP CLEARANCES SECTION 1005\u2014BOILER CONNECTIONS <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | SECTION 1006\u2014SAFETY AND PRESSURE RELIEF VALVES AND CONTROLS SECTION 1007\u2014BOILER LOW-WATER CUTOFF SECTION 1008\u2014BOTTOM BLOWOFF VALVE <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | SECTION 1009\u2014HOT WATER BOILER EXPANSION TANK EQUATION 10-1 TABLE 1009.2\u2014CLOSED-TYPE EXPANSION TANK SIZING SECTION 1010\u2014GAUGES <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | SECTION 1011\u2014TESTS <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | CHAPTER 11: REFRIGERATION SECTION 1101\u2014GENERAL TABLE 1101.2\u2014FACTORY-BUILT EQUIPMENT AND APPLIANCES <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | SECTION 1102\u2014SYSTEM REQUIREMENTS SECTION 1103\u2014REFRIGERATION SYSTEM CLASSIFICATION <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL\u2014continued <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL\u2014continued <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL\u2014continued <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL\u2014continued <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL\u2014continued <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | TABLE 1103.1\u2014REFRIGERANT CLASSIFICATION, AMOUNT AND OEL\u2014continued <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | SECTION 1104\u2014REFRIGERATION SYSTEM APPLICATION REQUIREMENTS <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | SECTION 1105\u2014MACHINERY ROOM, GENERAL REQUIREMENTS <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | SECTION 1106\u2014MACHINERY ROOM, SPECIAL REQUIREMENTS TABLE 1106.4.2\u2014GROUP A2L and B2L DETECTOR ACTIVATION SECTION 1107\u2014PIPING MATERIAL <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | TABLE 1107.4\u2014REFRIGERANT PIPE TABLE 1107.5\u2014REFRIGERANT PIPE FITTINGS TABLE 1107.5.1\u2014COPPER BRAZED SWAGED CUP DEPTHS <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | SECTION 1108\u2014JOINTS AND CONNECTIONS <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | SECTION 1109\u2014REFRIGERANT PIPE INSTALLATION <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | TABLE 1109.3.2\u2014SHAFT VENTILATION VELOCITY <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | SECTION 1110\u2014REFRIGERATION PIPING SYSTEM TEST [F] SECTION 1111 \u2014PERIODIC TESTING <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | CHAPTER 12: HYDRONIC PIPING SECTION 1201\u2014GENERAL SECTION 1202\u2014MATERIAL TABLE 1202.4\u2014HYDRONIC PIPE <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | TABLE 1202.5\u2014HYDRONIC PIPE FITTINGS SECTION 1203\u2014JOINTS AND CONNECTIONS <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | SECTION 1204\u2014PIPE INSULATION SECTION 1205\u2014VALVES SECTION 1206\u2014PIPING INSTALLATION <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | SECTION 1207\u2014TRANSFER FLUID SECTION 1208\u2014TESTS SECTION 1209\u2014EMBEDDED PIPING <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | TABLE 1209.6.1\u2014MAXIMUM CIRCUIT LENGTH OF RADIANT TUBING FROM A SUPPLY-AND-RETURN MANIFOLD ARRANGEMENT TABLE 1209.7.1\u2014MAXIMUM CIRCUIT LENGTH OF SNOW- ANDICE-MELT TUBING FROM A SUPPLY-AND-RETURN MANIFOLD ARRANGEMENT <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | SECTION 1210\u2014PLASTIC PIPE GROUND-SOURCE HEAT PUMP LOOP SYSTEMS TABLE 1210.4\u2014GROUND-SOURCE LOOP PIPE TABLE 1210.5\u2014GROUND-SOURCE LOOP PIPE FITTINGS <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | CHAPTER 13: FUEL OIL PIPING AND STORAGE SECTION 1301\u2014GENERAL SECTION 1302\u2014MATERIAL TABLE 1302.3\u2014FUEL OIL PIPING AND FITTINGS <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | SECTION 1303\u2014JOINTS AND CONNECTIONS SECTION 1304\u2014PIPING SUPPORT SECTION 1305\u2014FUEL OIL SYSTEM INSTALLATION <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | SECTION 1306\u2014OIL GAUGING SECTION 1307\u2014FUEL OIL VALVES SECTION 1308\u2014TESTING <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | CHAPTER 14: SOLAR THERMAL SYSTEMS SECTION 1401\u2014GENERAL SECTION 1402\u2014DESIGN AND INSTALLATION <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | SECTION 1403\u2014HEAT TRANSFER FLUIDS SECTION 1404\u2014LABELING <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | CHAPTER 15: REFERENCED STANDARDS ACCA AHRI AISI AMCA ANSI ASHRAE <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | ASME <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | ASSE ASSP ASTM <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | AWS AWWA CPSC CSA <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | DOL FDA FS ICC <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | IIAR MSS NAIMA NBBI NFPA <\/td>\n<\/tr>\n | ||||||
161<\/td>\n | NSF SMACNA <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | UL <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | APPENDIX A: CHIMNEY CONNECTOR PASS-THROUGHS SECTION A101\u2014CHIMNEY CONNECTOR SYSTEMS FIGURE A101.1(1)\u2014CHIMNEY CONNECTOR SYSTEMS <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | FIGURE A101.1(2)\u2014CHIMNEY CONNECTOR SYSTEMS <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | APPENDIX B: RECOMMENDED PERMIT FEE SCHEDULE SECTION B101\u2014MECHANICAL WORK, OTHER THAN GAS PIPING SYSTEMS SECTION B102\u2014FEE FOR REINSPECTION SECTION B103\u2014TEMPORARY OPERATION INSPECTION FEE SECTION B104\u2014SELF-CONTAINED UNITS LESS THAN 2 TONS <\/td>\n<\/tr>\n | ||||||
169<\/td>\n | APPENDIX C: BOARD OF APPEALS [A] SECTION C101\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | APPENDIX D: CLEAN AIR DELIVERY SECTION D101\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | APPENDIX E: CLEAN AIR DELIVERY AND MONITORING SECTION E101\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | INDEX <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | ICC EVALUATION SERVICE\u00ae <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | ICC CREDENTIALING <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | ICC CHANGES TO THE CODE DEVELOPMENT PROCESS <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | ICC DIGITAL CODES PREMIUM\u00ae <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" International Mechanical Code<\/b><\/p>\n |