{"id":444222,"date":"2024-10-20T08:36:41","date_gmt":"2024-10-20T08:36:41","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1020-2023\/"},"modified":"2024-10-26T16:03:18","modified_gmt":"2024-10-26T16:03:18","slug":"ieee-1020-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1020-2023\/","title":{"rendered":"IEEE 1020-2023"},"content":{"rendered":"
Revision Standard – Active. Description of the electrical control, protection, and monitoring requirements for equipment and systems associated with small (100 kVA to 5 MVA) hydroelectric power plants are described in this standard.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1020\u2122-2023 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002General 1.2\u2002Scope 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2.\u2002Normative references 3.\u2002Small hydroelectric plant overview 3.1\u2002General 3.2\u2002Application and small hydro project evaluation <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3.3\u2002Operation and control 3.4\u2002Interconnection <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.5\u2002Unit arrangement <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.6\u2002Rehabilitation considerations 4.\u2002Equipment 4.1\u2002General 4.2\u2002Major equipment <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.3\u2002Mechanical auxiliary systems <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.\u2002Station service electrical system 5.1\u2002General <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.2\u2002Power plants with single auxiliary supply <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3\u2002Power plants using multiple auxiliary supplies <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.\u2002Protection 6.1\u2002General <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.2\u2002Malfunction considerations <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.3\u2002Application considerations <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.\u2002Control and monitoring 7.1\u2002General <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.2\u2002Unit control 7.3\u2002Connecting generator units to the system <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 7.4\u2002Local and off-site control and monitoring <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 7.5\u2002Communication requirements <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 8.\u2002Modes of operation 8.1\u2002General 8.2\u2002Waterway operation 8.3\u2002Project interface with the waterway system 8.4\u2002Electrical system operation <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex\u00a0A (informative) Project evaluation <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex\u00a0B (informative) Small hydraulic turbine characteristics B.1\u2002Reaction turbines B.2\u2002Impulse turbines <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex\u00a0C (informative) Protective relay considerations <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | C.1\u2002Non-electrical protective devices <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | C.2\u2002Electrical protection functions <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | C.3\u2002Utility studies <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex\u00a0D (informative) Glossary <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex\u00a0E (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Control of Small (100 kVA to 5 MVA) Hydroelectric Power Plants (Approved Draft)<\/b><\/p>\n |