{"id":456990,"date":"2024-10-20T09:49:07","date_gmt":"2024-10-20T09:49:07","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1187-2013-2\/"},"modified":"2024-10-26T18:15:51","modified_gmt":"2024-10-26T18:15:51","slug":"ieee-1187-2013-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1187-2013-2\/","title":{"rendered":"IEEE 1187-2013"},"content":{"rendered":"

Revision Standard – Inactive-Reserved. This recommended practice provides guidance for the installation and installation design of valve-regulated lead acid (VRLA) batteries. This recommended practice is intended for all standby stationary installations. However, specific applications, such as emergency lighting units and semi-portable equipment, may have other appropriate practices and are beyond the scope of this recommended practice. Alternative energy applications are not covered.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1187\u2122-2013 front cover <\/td>\n<\/tr>\n
3<\/td>\nTitle page
\n <\/td>\n<\/tr>\n
5<\/td>\nImportant Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nIntroduction <\/td>\n<\/tr>\n
11<\/td>\nContents <\/td>\n<\/tr>\n
13<\/td>\nIMPORTANT NOTICE
\n
1. Overview
1.1 Scope <\/td>\n<\/tr>\n
14<\/td>\n1.2 Purpose
2. Normative references <\/td>\n<\/tr>\n
15<\/td>\n3. Definitions, acronyms, and abbreviations
3.1 Definitions
3.2 Acronyms and abbreviations <\/td>\n<\/tr>\n
16<\/td>\n4. Safety
4.1 General
4.2 Electrical hazards
4.2.1 Shock hazard
4.2.2 Ground fault detection <\/td>\n<\/tr>\n
17<\/td>\n4.2.3 Arc flash hazard
4.3 Chemical hazards <\/td>\n<\/tr>\n
18<\/td>\n4.4 Thermal hazards
4.5 Lifting and handling hazards
4.6 Personal protective equipment (PPE)
5. Installation design criteria <\/td>\n<\/tr>\n
19<\/td>\n5.1 Location
5.1.1 General considerations
5.1.2 Design for maintainability
5.1.2.1 Rack-mounted or stackable installations <\/td>\n<\/tr>\n
20<\/td>\n5.1.2.2 Cabinet installations
5.2 Mounting
5.3 Seismic <\/td>\n<\/tr>\n
21<\/td>\n5.4 Ventilation
5.4.1 Ventilation for temperature control
5.4.2 Ventilation for hydrogen control <\/td>\n<\/tr>\n
22<\/td>\n5.5 Instrumentation, controls, and alarms
5.5.1 Instrumentation
5.5.2 Controls
5.5.3 Alarms <\/td>\n<\/tr>\n
23<\/td>\n5.6 Parallel-battery strings
5.7 Charging <\/td>\n<\/tr>\n
24<\/td>\n5.8 Battery protection
5.8.1 General
5.8.2 Additional considerations for parallel battery strings
6. Installation procedures
6.1 Receiving and storage
6.1.1 Receiving inspection
6.1.2 Unpacking <\/td>\n<\/tr>\n
25<\/td>\n6.1.3 Storage
6.2 Assembly
6.2.1 Rack, enclosures, and modules
6.2.2 Cell\/Module installation and connections <\/td>\n<\/tr>\n
27<\/td>\n6.3 Freshening\/initial charge and testing
6.3.1 Freshening\/initial charge
6.3.2 Preparation of replacement VRLA cells\/modules <\/td>\n<\/tr>\n
28<\/td>\n6.3.3 Internal ohmic measurements
6.4 Connection to dc system
6.5 Measuring ac ripple voltage and current
6.6 Measuring battery temperature and ambient temperature
6.7 Measuring battery charging current
6.7.1 General <\/td>\n<\/tr>\n
29<\/td>\n6.7.2 Parallel strings
6.7.3 Series parallel strings
7. Records
7.1 Records for warranty and baseline data <\/td>\n<\/tr>\n
30<\/td>\n7.2 Records for environmental health and safety <\/td>\n<\/tr>\n
31<\/td>\nAnnex A (informative) Bibliography <\/td>\n<\/tr>\n
32<\/td>\nAnnex B (informative)
\nThermal runaway <\/td>\n<\/tr>\n
33<\/td>\nAnnex C (informative)
\nEffect of elevated temperature on expected battery life <\/td>\n<\/tr>\n
34<\/td>\nAnnex D (informative)
\nConnection resistance measurements <\/td>\n<\/tr>\n
41<\/td>\nAnnex E (informative) Cell internal ohmic measurements <\/td>\n<\/tr>\n
42<\/td>\nAnnex F (informative) Material handling <\/td>\n<\/tr>\n
45<\/td>\nAnnex G (informative)
\nArc flash PPE <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Recommended Practice for Installation Design and Installation of Valve-Regulated Lead-Acid Batteries for Stationary Applications (Redline)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2013<\/td>\n46<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":457000,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-456990","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/456990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/457000"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=456990"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=456990"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=456990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}