{"id":458891,"date":"2024-10-20T09:59:47","date_gmt":"2024-10-20T09:59:47","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-e917-12\/"},"modified":"2024-10-26T18:33:18","modified_gmt":"2024-10-26T18:33:18","slug":"astm-e917-12","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-e917-12\/","title":{"rendered":"ASTM-E917"},"content":{"rendered":"<\/p>\n
1.1 This practice establishes a procedure for evaluating the life-cycle cost (LCC) of a building or building system and comparing the LCCs of alternative building designs or systems that satisfy the same functional requirements.<\/p>\n
1.2 The LCC method measures, in present-value or annual-value terms, the sum of all relevant costs associated with owning and operating a building or building system over a specified time period.<\/p>\n
1.3 The basic premise of the LCC method is that to an investor or decision maker all costs arising from an investment decision are potentially important to that decision, including future as well as present costs. Applied to buildings or building systems, the LCC encompasses all relevant costs over a designated study period, including the costs of designing, purchasing\/leasing, constructing\/installing, operating, maintaining, repairing, replacing, and disposing of a particular building design or system.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Scope Referenced Documents <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Terminology Summary of Practice Significance and Use Procedure Objectives, Alternatives, and Constraints Data and Assumptions <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Compute LCC <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | TABLE 1 <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | TABLE 2 <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Compare LCCs and Make Final Decision FIG. 1 <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | FIG. 2 <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Report FIG. 3 TABLE 3 <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Applications Limitations Keywords X1. LIFE-CYCLE COST APPLICATION 1: INDUSTRIAL PLANT CASE STUDY X1.1 X1.2 <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | X1.3 TABLE X1.1 TABLE X1.2 <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | TABLE X1.3 TABLE X1.4 TABLE X1.5 TABLE X1.6 <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | TABLE X1.7 TABLE X1.8 TABLE X1.9 TABLE X1.10 TABLE X1.11 <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | X2. LIFE-CYCLE COST APPLICATION 2: DATA CENTER CASE STUDY X2.1 Background X2.2 Alternatives X2.3 Analysis Strategy X2.4 Assumptions and Cost Data TABLE X2.1 <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | X2.5 Results of Baseline Analysis TABLE X2.2 TABLE X2.3 <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | X2.6 Results of Monte Carlo Simulation TABLE X2.4 TABLE X2.5 TABLE X2.6 <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | TABLE X2.7 <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | TABLE X2.8 <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | X2.7 Final Decision FIG. X2.1 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" E917-05 Standard Practice for Measuring Life-Cycle Costs of Buildings and Building Systems<\/b><\/p>\n |