{"id":465085,"date":"2024-10-20T10:38:38","date_gmt":"2024-10-20T10:38:38","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-50463-52017a12024\/"},"modified":"2024-10-26T19:38:34","modified_gmt":"2024-10-26T19:38:34","slug":"bs-en-50463-52017a12024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-50463-52017a12024\/","title":{"rendered":"BS EN 50463-5:2017+A1:2024"},"content":{"rendered":"
This New Work Item Proposal has the scope to provide an amendment of the European standard EN 50463-5 in order to update the annex ZZ<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope 2 Normative references 3 Terms, definitions and abbreviations 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.2 Abbreviations <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4 Conformity assessment approach 4.1 General 4.2 Situation of applicability 4.3 General Methodology <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.4 EMS Specific Methodology 5 Conformity assessment procedures 5.1 General <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2 EMS integration design review <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.3 EMS integration type test 5.3.3.1 General 5.3.3.2 Visual inspection 5.3.3.3 Power-up 5.3.3.4 Power-down 5.3.3.5 Traction system change 5.3.3.6 EMS Data flow test <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.4 EMS installation design review 5.4.2.1 General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.4.2.2 Insulation 5.4.2.3 Enclosure 5.4.2.4 Protection from non-authorized access 5.4.2.5 General safety requirements 5.5 EMS Installation type test <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.5.4.1 General 5.5.4.2 Visual inspection 5.5.4.3 EMS data flow test 5.5.4.4 Data transfer through all communication channels 5.6 EMS installation routine test <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.6.3.1 General 5.6.3.2 Visual inspection 5.6.3.3 Power-up <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.6.3.4 Power-down 5.6.3.5 Traction supply system change 5.6.3.6 Insulation 5.6.3.7 Protection from non-authorized access 5.6.3.8 Indicator 5.6.3.9 General safety requirements 5.6.3.10 EMS data flow test 5.7 Periodic re-verification <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.8 Replacement of devices and ancillary components <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Railway applications. Energy measurement on board trains – Conformity assessment<\/b><\/p>\n |