{"id":465142,"date":"2024-10-20T10:38:57","date_gmt":"2024-10-20T10:38:57","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-186762024\/"},"modified":"2024-10-26T19:39:15","modified_gmt":"2024-10-26T19:39:15","slug":"bs-iso-186762024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-186762024\/","title":{"rendered":"BS ISO 18676:2024"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
11<\/td>\n4 Positioning of systems engineering management
4.1 General
4.2 Need for systems engineering management
4.3 Systems engineering <\/td>\n<\/tr>\n
12<\/td>\n4.4 Systems engineering management
4.5 Systems engineering management relative to the mission\/programme\/project <\/td>\n<\/tr>\n
13<\/td>\n5 Management of the systems engineering activities
5.1 General
5.2 Planning <\/td>\n<\/tr>\n
14<\/td>\n5.3 Assessment
5.4 Trade-offs and decision-making
5.5 Control <\/td>\n<\/tr>\n
15<\/td>\n6 Systems engineering management plan (SEMP)
7 Systems engineering management activities
7.1 Management of stakeholder requirements analysis
7.2 Management of system requirements analysis <\/td>\n<\/tr>\n
16<\/td>\n7.3 Management of architectural design
7.4 Management of detailed design
7.5 Management of assembly, integration and verification
7.6 Management of validation <\/td>\n<\/tr>\n
17<\/td>\n8 Work breakdown structures (WBS) <\/td>\n<\/tr>\n
18<\/td>\n9 Phasing, scheduling and recursivity
10 Budgeting and resource planning
11 Status reporting and assessment
11.1 General
11.2 Cost assessments <\/td>\n<\/tr>\n
19<\/td>\n11.3 Scheduling assessments
11.4 Performance assessments
11.5 Risk assessments <\/td>\n<\/tr>\n
20<\/td>\n12 Reviews, audits and control gates
12.1 General
12.2 Review <\/td>\n<\/tr>\n
21<\/td>\n12.3 Review list <\/td>\n<\/tr>\n
22<\/td>\n12.4 Audits
12.5 Control gates
13 Interfaces management with SE
13.1 General <\/td>\n<\/tr>\n
23<\/td>\n13.2 Acquisition and supply interface management
13.3 Implementation interface management <\/td>\n<\/tr>\n
24<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Space systems. Requirements and guidelines for the management of systems engineering<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2024<\/td>\n26<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":465152,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-465142","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/465142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/465152"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=465142"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=465142"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=465142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}