{"id":601544,"date":"2024-11-05T22:10:48","date_gmt":"2024-11-05T22:10:48","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/iso-18828-32017\/"},"modified":"2024-11-05T22:10:48","modified_gmt":"2024-11-05T22:10:48","slug":"iso-18828-32017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/iso\/iso-18828-32017\/","title":{"rendered":"ISO 18828-3:2017"},"content":{"rendered":"

ISO 18828-3:2017 describes the information flows identified for each planning discipline within production planning, according to ISO 18828-2.<\/p>\n

The following aspects are within the scope of ISO 18828-3:2017:<\/p>\n

\u00b7 general overview of the main information flows within the reference planning process;<\/p>\n

\u00b7 basic pattern to describe the main information flows;<\/p>\n

\u00b7 detailed description of every main information flow;<\/p>\n

\u00b7 state notation structure of the main information flows objects;<\/p>\n

\u00b7 detailed descriptions for each information object state;<\/p>\n

\u00b7 proposal of checklists for benchmarking information objects.<\/p>\n

The following items are outside the scope of ISO 18828-3:2017:<\/p>\n

\u00b7 information flows to intersecting areas, including high-level planning;<\/p>\n

\u00b7 data models for production planning;<\/p>\n

\u00b7 complete description of all possible information flows\/objects within production planning;<\/p>\n

\u00b7 workflow engines for automated production planning;<\/p>\n

\u00b7 production facilities planning\/manufacturing facilities planning (physical plant and equipment); including any kind of resource that is not directly related to the manufacturing process;<\/p>\n

\u00b7 value chain (inbound logistics, operations management, outbound logistics, marketing and sales);<\/p>\n

\u00b7 process simulation\/safeguarding;<\/p>\n

\u00b7 investment planning during production process management.<\/p>\n","protected":false},"excerpt":{"rendered":"

Industrial automation systems and integration \u2014 Standardized procedures for production systems engineering \u2014 Part 3: Information flows in production planning processes<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ISO<\/b><\/a><\/td>\n2017-07<\/td>\n60<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":601556,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[385,2634],"product_tag":[],"class_list":{"0":"post-601544","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-25-040-40","7":"product_cat-iso","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/601544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/601556"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=601544"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=601544"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=601544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}