{"id":70071,"date":"2024-10-17T14:15:25","date_gmt":"2024-10-17T14:15:25","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-d7430-2010-2\/"},"modified":"2024-10-24T18:49:21","modified_gmt":"2024-10-24T18:49:21","slug":"astm-d7430-2010-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-d7430-2010-2\/","title":{"rendered":"ASTM-D7430 2010"},"content":{"rendered":"<\/p>\n
1.1 This practice is divided into 4 parts. These 4 parts represent the previous standards D7256\/D7256M , D4916 , D4702 , and D6518 . These 4 standards are the 4 that govern the mechanical sampling of coal and have been combined into one document for the ease of reference of the users of these standards.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Scope <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Referenced Documents Terminology <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Summary of Practices Significance and Use Increment Collection Classification Organization and Planning of Sampling Operations TABLE 1 <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Procedures <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Maintenance of Mechanical Sampling Equipment Precision and Bias <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | FIG. 1 <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Summary of Practices Significance and Use Organization and Planning of Sampling Operations <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Precision and Bias <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Significance and Use Hazards Assessing the Organization and Planning of Sampling Operations General Observations of Coal Stream Variability as Related to Primary Increment Collection by Falling-Stream and Cross-Belt Samplers General Observations of Auger Placement <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Inspection of the Primary Sampler in Time-Based Cross-Belt or Falling-Stream Sampling Systems Inspection of Augers Criteria for Secondary Sampler Operation <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Criteria for Tertiary or Final Sampler Operation Cautions for Collecting Final Sample General Considerations to be Observed by the Inspector <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Summary of Practices Significance and Use Guidelines for When To Bias Test Apparatus <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Description of Test Procedures <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Organization and Planning <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Keywords <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | A1. COLLECTION OF REFERENCE SAMPLES (SECTION D \u2013 BIAS TESTING) A1.1 Reference Samples TABLE A1.1 <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | A1.2 Surrogate Samples FIG. A1.1 <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | A2. STATISTICAL PROCEDURES (SECTION D \u2013 BIAS TESTING) A2.1 Nonparametric Statistical Procedure TABLE A2.1 TABLE A2.2 TABLE A2.3 <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | TABLE A2.4 TABLE A2.5 TABLE A2.6 <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | A2.2 Interpretation of Nonparametric Results and Adequacy of Data TABLE A2.7 TABLE A2.8 <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | TABLE A2.9 TABLE A2.10 TABLE A2.11 <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | A2.3 Parametric Statistical Procedures <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | TABLE A2.12 <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | A2.4 Combined-Variance for Intraphase Test <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | A3. SELECTION OF TEST BATCH SIZE (SECTION D \u2013 BIAS TESTING) A3.1 A3.2 A3.3 A3.4 <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | A4. BIAS TESTING A MECHANICAL SAMPLING SYSTEM TABLE A4.1 <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | A5. TEST METHOD FOR ESTIMATING THE OVERALL VARIANCE FOR INCREMENTS A5.1 Scope A5.2 Procedure A5.3 Calculation TABLE A5.1 <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | TABLE A5.2 <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | X1. TYPICAL MECHANICAL COAL SAMPLER CHECKLIST (SECTION A \u2013 MECHANICAL SAMPLING & SECTION C \u2013 QUALITY MANAGEMENT) <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | X2. MONITORING COAL SAMPLING RATIOS USING CONTROL CHARTS (SECTION A \u2013 MECHANICAL SAMPLING & SECTION C \u2013 QUALITY MANAGEMENT) X2.1 Scope X2.2 Rationale (Commentary) X2.3 Data Collection and Charting Procedure X2.4 Detection of Special Causes (Out-of-Control Conditions) FIG. X2.1 <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | X2.5 Monitoring the Coefficient of Variation X2.6 Monitoring the Average Observed Sampling Ratio TABLE X2.1 <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | X3. THEORETICAL CONSIDERATIONS AND SOURCES OF FORMULAS AND TABLES (SECTION D \u2013 BIAS TESTING) X3.1 X3.2 X3.3 X3.4 <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | REFERENCES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" D7430-10b Standard Practice for Mechanical Sampling of Coal<\/b><\/p>\n |