{"id":79360,"date":"2024-10-17T18:33:40","date_gmt":"2024-10-17T18:33:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-837-2003\/"},"modified":"2024-10-24T19:39:53","modified_gmt":"2024-10-24T19:39:53","slug":"ieee-837-2003","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-837-2003\/","title":{"rendered":"IEEE 837 2003"},"content":{"rendered":"
Revision Standard – Active. Direction and methods for qualifying permanent connections used for substation grounding are provided in this standard. This standard particularly addresses the connection used within the grid system, the connection used to join ground leads to the grid system, and the connection used to join the ground leads to equipment and structures.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover Page <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose 2. References <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3. Definitions 4. Qualification tests <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5. Performance criteria 5.1 General 5.2 Mechanical tests 5.3 Sequential tests <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6. Test procedures 6.1 General 6.2 Mechanical test samples 6.3 Sequential test samples 6.4 Connection description 6.5 Test conductors 6.6 Test assembly methods 6.7 Connection preparation 6.8 Installation <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7. Mechanical tests 7.1 General 7.2 Mechanical pullout test <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.3 Electromagnetic force test <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 8. Current-temperature cycling test 8.1 General 8.2 Current-temperature cycling test <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8.3 Ambient conditions 8.4 Control conductor <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 8.5 Current cycling <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.6 Current cycling loop configuration 8.7 Current cycling measurements <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 9. Freeze-thaw test 9.1 General 9.2 Freeze-thaw test 9.3 Freeze-thaw test samples and their configuration <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9.4 Freeze-thaw test equipment 9.5 Freeze-thaw test cycle 10. Corrosion tests 10.1 General 10.2 Corrosion test-salt spray <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 10.3 Corrosion test-acid (HNO3) <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 11. Fault-current test 11.1 General 11.2 Fault-current test 11.3 Fault-current test samples 11.4 Fault-current test configuration 11.5 Fault-current test duration <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 11.6 Fault-current test current 11.7 Fault-current number of surges 11.8 Fault-current test evaluation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex B (informative) Nitric acid dilution <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex C (normative) Conductor ampacity calculation <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Annex D (informative) Test sequencing <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for Qualifying Permanent Connections Used in Substation Grounding<\/b><\/p>\n |