{"id":79540,"date":"2024-10-17T18:35:28","date_gmt":"2024-10-17T18:35:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1010-1988\/"},"modified":"2024-10-24T19:40:28","modified_gmt":"2024-10-24T19:40:28","slug":"ieee-1010-1988","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1010-1988\/","title":{"rendered":"IEEE 1010 1988"},"content":{"rendered":"
New IEEE Standard – Inactive – Superseded. Superseded by IEEE Std 1010-2006 Abstract: The control and monitoring requirements for equipment and systems associated with conventional and pumped-storage hydroelectric plants are described. Typical methods of local and remote control, details of the control interfaces for plant equipment, requirements for centralized and off-site control, and trends in control systems are included. The various categories that affect the levels of control for a plant, namely, location, mode, and supervision, are described. Block diagrams and descriptions of the control and monitoring requirements for major plant systems and equipment are given. Control sequencing of generating and pumped storage units, centralized control, and off-site control are covered. The information is directed toward practicing engineers in the field of power plant design who have a basic knowledge of hydroelectric facilities.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Scope and Introduction 1.1 Scope 1.2 Introduction <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1.3 References <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 2. Control Hierarchy 2.1 General 2.2 Control Locations <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2.3 Control Modes 2.4 Control Supervision <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 2.5 Summary 3. Control and Monitoring of Plant Equipment 3.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3.2 Information and Control Signals <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 4. Control Sequencing\u2014Generating Units <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 4.1 Steps in Starting Sequence <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 4.2 Automation of the Control System <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 5. Control Sequencing\u2014Pumped-Storage Units 5.1 Steps in the Starting Sequence <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 5.2 Unit Shutdown 5.3 Control Sequence Automation 6. Centralized Control <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 6.1 Control System Hardware Requirements 7. Off-Site Control <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 7.1 Control 7.2 Status 7.3 Alarm 7.4 Data <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 8. Trends <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | Annex A <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Control of Hydroelectric Power Plants<\/b><\/p>\n |