{"id":80047,"date":"2024-10-17T18:40:24","date_gmt":"2024-10-17T18:40:24","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1333-1995\/"},"modified":"2024-10-24T19:42:15","modified_gmt":"2024-10-24T19:42:15","slug":"ieee-1333-1995","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1333-1995\/","title":{"rendered":"IEEE 1333 1995"},"content":{"rendered":"
New IEEE Standard – Inactive – Withdrawn. Withdrawn Standard. Withdrawn Date: Feb 06, 2006. The method and equipment involved in proper and economical installation of insulated conductors and\/or conduits using the guided boring method are covered. The method addresses installations of insulated cable, cable preinstalled in conduit (CIC), and conduit alone.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1. Overview 2. References <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3. General description 3.1 Cable 3.2 Cable preinstalled in conduit (CIC) <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3.3 Plastic conduit 3.4 Metal conduit <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4. Equipment description 4.1 Boring unit (drill frame) 4.2 Field power unit (supply unit) 4.3 Drill (boring) head and locator <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.4 Required safety equipment <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.5 Supplemental equipment <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5. Preliminary inspection 5.1 Observation of field maps and circuit diagrams 5.2 Field survey <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.3 Surface marking of substructures 5.4 Material and equipment preparation <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.5 Job conditions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6. Precautions 6.1 General safety precautions 6.2 Guarding and protecting work area <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.3 Testing enclosure atmosphere 6.4 Shoring <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7. Drilling the run 7.1 Planning 7.2 Start of bore 7.3 Obstructions 7.4 Depth and spacing requirements 7.5 Pits 7.6 Drilling fluid control <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8. Cable preparation 8.1 Reel and reel trailers 8.2 Cable 8.3 Attaching cable to drill string <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 8.4 Reamers <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9. Installation 9.1 Cable\/conduit pulling <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 9.2 Completing the installation <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 10. Post-installation activities 10.1 Cleanup 10.2 Record as-built conditions <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Installation of Cable Using the Guided Boring Method<\/b><\/p>\n |