{"id":80567,"date":"2024-10-17T18:45:36","date_gmt":"2024-10-17T18:45:36","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-122-1988\/"},"modified":"2024-10-24T19:43:57","modified_gmt":"2024-10-24T19:43:57","slug":"ieee-c37-122-1988","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-122-1988\/","title":{"rendered":"IEEE C37.122 1988"},"content":{"rendered":"

New IEEE Standard – Inactive – Superseded. Superseded by C37.122-1993.. The technical requirements for the design, fabrication, testing, and installation of a gasinsulated substation (GIS) are covered. The parameters to be supplied by the purchaser are set, and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are established.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
11<\/td>\n1 Introduction
1.1 Scope
1.2 References <\/td>\n<\/tr>\n
13<\/td>\n1.3 Definitions <\/td>\n<\/tr>\n
15<\/td>\n1.4 Service Conditions <\/td>\n<\/tr>\n
16<\/td>\n2 Standards
2.1 Equipment Ratings
2.1.1 Temperature Ratings
2.1.2 General Ratings
2.2 Barriers Bus Bus Supports Enclosures and Expansion Joints
2.2.1 General <\/td>\n<\/tr>\n
17<\/td>\n2.2.2 Enclosures
2.2.3 Adjacent and Supporting Structures
Voltage Ratings of Gas-Insulated Substations at Normal Operating Gas Pressure <\/td>\n<\/tr>\n
18<\/td>\n2.2.4 Expansion Joints
2.2.5 Electrical Requirements
2.3 Bushings and Transition Compartments
2.3.1 General
2.3.2 Bushing Requirements
2.4 Insulating Gas – Requirements
2.5 Gas Monitoring and Instrumentation
2.5.1 Monitoring
2.5.2 Monitoring Device Contacts and Calibration <\/td>\n<\/tr>\n
19<\/td>\n2.5.3 Leakage
2.5.4 Piping
2.6 Factory Testing
2.6.1 General
2.6.2 Design Tests <\/td>\n<\/tr>\n
20<\/td>\n2.6.3 Production Tests <\/td>\n<\/tr>\n
21<\/td>\n2.7 Installation of Gas-Insulated Substations – Requirements
2.7.1 Shipment and Preinstallation Storage
2.7.2 Access During Construction
2.7.3 Temporary Protective Covers
2.7.4 Special Tools
2.7.5 Installation Drawings and Instructions
3 Recommended Practices
3.1 Equipment Handling and Cleanliness
3.1.1 General
3.1.2 Design Considerations for Ease of Maintenance or Repair <\/td>\n<\/tr>\n
22<\/td>\n3.1.3 Safety During Maintenance or Repair
3.1.4 Environmental Considerations
3.1.5 Equipment Necessary At the Site
3.1.6 Work Procedure <\/td>\n<\/tr>\n
23<\/td>\n3.2 Gas Handling
3.2.1 General
3.2.2 Service Conditions
3.2.3 New Gas <\/td>\n<\/tr>\n
24<\/td>\n3.2.4 Gas-Handling Equipment
3.2.5 Filling GIS Apparatus <\/td>\n<\/tr>\n
25<\/td>\n3.2.6 Removal of SF6 From GIS Apparatus <\/td>\n<\/tr>\n
26<\/td>\n3.2.7 General Precautions
3.3 Safety
3.3.1 General
3.3.2 Operation Precautions
Safe Operating Procedures
Safe Maintenance and Repair Procedures <\/td>\n<\/tr>\n
27<\/td>\n3.4 Field Testing
3.4.1 General
3.4.2 Mechanical Tests <\/td>\n<\/tr>\n
28<\/td>\n3.4.3 Electrical Tests
Voltage Steps for Power Frequency Tests <\/td>\n<\/tr>\n
29<\/td>\n3.5 Nameplates
3.5.1 General
One-Line Diagram Nameplate
GIS Ratings Nameplate
3.5.4 Equipment Nameplate
4 Guides
4.1 Arrangements
4.1.1 General <\/td>\n<\/tr>\n
31<\/td>\n4.1.2 Bus Schemes
4.1.3 Arrangement Selection
4.1.4 Appendix-GGIS Arrangements
4.2 High-Voltage Alternating-Current Cable Terminations
4.2.1 General
4.2.2 Ratings <\/td>\n<\/tr>\n
45<\/td>\n(i) Eight Row Arrangement Breaker Grouping <\/td>\n<\/tr>\n
50<\/td>\n4.2.3 Electrical Requirements
4.2.4 Mechanical Requirements
4.2.5 Nameplate Markings
4.3 Grounding
4.3.1 Introduction
4.3.2 General Considerations <\/td>\n<\/tr>\n
51<\/td>\nGround Potential Gradients and their Control
Protection of Personnel Inside Substation Area
Safety Precautions for Areas Outside of Substation Fence <\/td>\n<\/tr>\n
52<\/td>\nUse of Concrete Encased Electrodes
Prevention of Unwanted Interconnections with Other Ground Systems
4.3.8 Effect of Buried Objects <\/td>\n<\/tr>\n
53<\/td>\n4.3.9 Other Requirements
4.3.10 Grounding of Enclosures – Continuous Enclosure Design
4.3.1 1 Recommended Responsibilities for GIS Grounding- User <\/td>\n<\/tr>\n
54<\/td>\n4.3.12 Recommended Responsibilities for GIS Grounding – Manufacturer
4.3.13 Appendix I -Enclosures and Circulating Currents
4.4 Seismic Requirements
4.4.1 Introduction <\/td>\n<\/tr>\n
55<\/td>\n4.4.2 Seismic Criteria <\/td>\n<\/tr>\n
56<\/td>\nResponse Spectra <\/td>\n<\/tr>\n
57<\/td>\nMacro-Zone Map <\/td>\n<\/tr>\n
58<\/td>\n4.4.3 Performance Requirements <\/td>\n<\/tr>\n
59<\/td>\n4.4.4 Qualification Methods <\/td>\n<\/tr>\n
66<\/td>\n4.4.5 Design Philosophy <\/td>\n<\/tr>\n
68<\/td>\n4.4.6 Recommended Installation Provisions and Practices <\/td>\n<\/tr>\n
69<\/td>\n4.5 Installation
4.5.1 General
4.5.2 Site Selection
4.5.3 Planning the Installation <\/td>\n<\/tr>\n
70<\/td>\n4.5.4 Installation Crew
4.5.5 Equipment Requirements for Installation <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Standard for Gas-Insulated Substations<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n1988<\/td>\n75<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":80568,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-80567","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/80567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/80568"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=80567"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=80567"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=80567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}