{"id":80722,"date":"2024-10-17T18:47:22","date_gmt":"2024-10-17T18:47:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-125-1992\/"},"modified":"2024-10-24T19:44:30","modified_gmt":"2024-10-24T19:44:30","slug":"ieee-c57-125-1992","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-125-1992\/","title":{"rendered":"IEEE C57.125 1992"},"content":{"rendered":"
New IEEE Standard – Active. A procedure to be used to perform a failure analysis is recommended. The procedure is primarily focused on power transformers used on electrical utility systems, although it may be used for an investigation into any ac transformer failure. This document provides a methodology by which the most probable cause of any particular transformer failure may be determined. This document is also intended to encourage the establishment of routine and uniform data collection procedures, consistency of nomenclature and compatibility with similar efforts by other organizations, and cooperative effects by users and manufacturers during the failure analysis.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1. Introduction 1.1 Scope 1.2 Purpose 2. References <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4. Determination and Investigation of a Failure Occurrence 4.1 Following a Suspected Failure 4.2 Investigation Flow Chart <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5. Data Collection 5.1 General Approach 5.2 Preparation 5.3 On-Site Investigation <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.4 Off-Site Investigations <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.5 Untanking and Tear-Down <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6. Analysis 6.1 General 6.2 Analysis of Mechanical Failure of Windings <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.3 Analysis of Electrical Failure <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.4 Analysis of Other Electrical Failures 7. Bibliography <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Annex A\u2014Transformer Tests <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex B\u2014Transformer Construction <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Annex C\u2014Case Histories <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Failure Investigation, Documentation, and Analysis for Power Transformers and Shunt Reactors<\/b><\/p>\n |