{"id":81160,"date":"2024-10-17T18:51:53","date_gmt":"2024-10-17T18:51:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-13-5-2003\/"},"modified":"2024-10-24T19:45:51","modified_gmt":"2024-10-24T19:45:51","slug":"ieee-c57-13-5-2003","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-13-5-2003\/","title":{"rendered":"IEEE C57.13.5 2003"},"content":{"rendered":"
New IEEE Standard – Inactive – Superseded. This trial-use standard covers the test requirements, including test sequences, criteria, methods, and documentation for instrument transformers of 115 kV nominal system and above. It is to be used a supplement to IEEE STDPD C57.13 -1993. Besides the provision of up-to-date test requirements, the trial-use standard also provides test procedures that were not adequately covered in the previous standard.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1. Overview 1.2 Purpose 2. References <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3. Definitions 4. General 4.1 Insulation requirements <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.2 Mineral oil requirements 4.3 Requirements for accuracy and accuracy calibration systems <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.4 Mechanical performance requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.5 Thermal performance requirements 4.6 Ground shield requirements 4.7 Dissolved gas and water content requirements for new oil-immersed 4.8 Endurance capability for fast high-voltage transient <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.9 Performance of internal arc protection 4.10 Identification of test sample in the type test report 4.11 Secondary short-circuit capability for voltage transformers 5. Test conditions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6. Classification of tests 6.1 Routine tests and test sequences <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.2 Type tests and test sequences <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.3 Special tests <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7. Routine test procedures (applicable to instrument transformers) 7.1 Verification of terminal markings and polarity 7.2 Capacitance and dissipation factor test 7.3 Applied voltage test on secondary windings <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.4 Insulation resistance test on windings 7.5 Lightning impulse voltage test on the primary winding 7.6 Power frequency voltage withstand test <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.7 Partial discharge test 7.8 Dissolved gas and water content analysis for oil-immersed transformers (of a nominal system voltage 345 kV and above 7.9 Sealing test <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.10 Ground shield check <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.11 Tests on the mineral oil 8. Routine test procedures (applicable to current transformers) 8.1 Inter-turn overvoltage test <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8.2 Accuracy test for the metering rated current transformers 8.3 Resistance measurement of relaying rated secondary windings 8.4 Performance characteristics of relaying rated current transformers <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9. Routine test procedures (applicable to voltage transformers) 9.1 Applied voltage test on the neutral terminal 9.2 Accuracy test <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 9.3 Excitation characteristics with respect to rated voltage factor 9.4 Resistance measurement of windings 10. Type test procedures (applicable to instrument transformers) 10.1 Dissolved gas and water content analysis <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 10.2 Mechanical test 10.3 Lightning impulse voltage test on the primary winding <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 10.4 Switching impulse voltage test on the primary winding\u2014wet 10.5 External RIV test <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 10.6 Power frequency voltage withstand test\u2014wet 10.7 Power frequency voltage withstand\/partial discharge test\u2014dry 10.8 Temperature rise test <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 10.9 Short-time mechanical and thermal rating test <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 11. Type test procedure (applicable to current transformers) 11.1 Secondary open-circuit voltage withstand test 12. Special test procedures 12.1 Endurance chopped-wave test <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 12.2 Internal arc test <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 12.3 Seismic qualification 13. Identification of test sample in the type test report 13.1 Document package related to transformer type <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex A (normative) Test code <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex B (informative) Dielectric test performed at an altitude of 1000 m or less for instrument transformers designed for installation at altitudes greater than 1000 m <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex C (informative) Dielectric tests, oil sampling, and other related measurments in the field <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex D (informative) Internal arc protection for instrument transformers <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex E (normative) Validity of test reports and guidance for reviewing the design comparison report for the modified design <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Annex F (normative) Rated voltage factor <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Annex G (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Standard of Performance and Test Requirements of Instrument Transformers of a Nominal Voltage of 115 kV and Above<\/b><\/p>\n |