{"id":451073,"date":"2024-10-20T09:15:50","date_gmt":"2024-10-20T09:15:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-16484-12024\/"},"modified":"2024-10-26T17:15:51","modified_gmt":"2024-10-26T17:15:51","slug":"bs-en-iso-16484-12024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-16484-12024\/","title":{"rendered":"BS EN ISO 16484-1:2024"},"content":{"rendered":"
This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS). This document specifies the phases required for the BACS project, including \u2014 design (determination of project requirements and production of design documents including technical specifications), \u2014 engineering (detailed function and hardware design), \u2014 installation (installing and commissioning of the BACS), and \u2014 completion (handover, acceptance and project finalization). This document also specifies the requirements for as-built documentation and training. This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.1 Overview 5.1.1 General 5.1.2 Phases of the BACS project <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.1.3 Documentation 5.1.4 Training 5.1.5 Reviewing and improving building performance 5.1.6 Graphical overview <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2 Design phase 5.2.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2.2 Determination of project requirements <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2.3 Project planning and organization <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2.4 Design documents and technical specification <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.2.5 Contract 5.3 Engineering phase 5.3.1 General 5.3.2 Project planning and coordination details 5.3.3 Detailed hardware and function design <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.3.4 Approval of design submittals 5.3.5 Hardware configuration 5.3.6 Control strategy configuration <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.3.7 Management and operator function configuration 5.3.8 System test <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.4 Installation phase 5.4.1 General 5.4.2 Installation <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.4.3 BACS commissioning <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.5 Completion phase 5.5.1 General <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.5.2 System demonstration 5.5.3 Operator training 5.5.4 Handover <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.5.5 Acceptance 5.5.6 Finalization 5.5.7 Completion decision 5.6 Documentation 5.6.1 General 5.6.2 User documents 5.6.3 Datasheets 5.6.4 Operation and maintenance documents <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.7 Training <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Building automation and control systems (BACS) – Project specification and implementation<\/b><\/p>\n |