ACI 506R 16:2016 Edition
$51.46
506R-16 Guide to Shotcrete
Published By | Publication Date | Number of Pages |
ACI | 2016 | 56 |
This guide is a companion document to ACI 506.2, “Specification for Shotcrete,” and provides information on materials and properties of both dry-mix and wet-mix shotcrete. Most facets of the shotcrete process are covered, including application procedures, equipment requirements, and responsibilities of the shotcrete crew. Other aspects, such as preconstruction trials, craftsman qualification tests, materials tests, finished shotcrete acceptance tests, and equipment, are also discussed. Keywords: dry-mix shotcrete; mixture proportion; placing; quality control; shotcrete; wet-mix shotcrete.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | TITLE PAGE TITLE PAGE |
4 | PREFACE PREFACE Introduction Introduction History History Applications Applications New developments New developments |
5 | Research and development Research and development PART 1—GENERAL PART 1—GENERAL 1.1—Scope 1.1—Scope |
6 | 1.2—Definitions 1.2—Definitions |
7 | 1.3—References: See Part 7—References 1.3—References: See Part 7—References 1.4—Submittals 1.4—Submittals 1.5—Preconstruction testing by contractor 1.5—Preconstruction testing by contractor |
8 | 1.6—Testing during construction: quality assurance and quality control 1.6—Testing during construction: quality assurance and quality control |
11 | 1.7—Delivery, storage, and handling 1.7—Delivery, storage, and handling PART 2—PRODUCTS PART 2—PRODUCTS 2.1—Materials 2.1—Materials |
15 | 2.2—Packaged shotcrete materials 2.2—Packaged shotcrete materials 2.3—Fiber-reinforced shotcrete 2.3—Fiber-reinforced shotcrete 2.4—Shotcrete properties 2.4—Shotcrete properties |
18 | 2.5—Proportioning 2.5—Proportioning |
20 | 2.6—Batching and mixing 2.6—Batching and mixing |
22 | PART 3—EXECUTION PART 3—EXECUTION 3.1—Surface preparation 3.1—Surface preparation |
25 | 3.2—Joints 3.2—Joints |
26 | 3.3—Alignment control 3.3—Alignment control |
27 | 3.4—Application 3.4—Application |
37 | 3.5—Finishing 3.5—Finishing |
39 | 3.6—Curing 3.6—Curing |
40 | 3.7—Protection 3.7—Protection 3.8—Tolerances 3.8—Tolerances |
41 | 3.9—Repair 3.9—Repair 3.10—Acceptance 3.10—Acceptance |
42 | PART 4—EQUIPMENT PART 4—EQUIPMENT 4.1—Introduction 4.1—Introduction 4.2—Dry-mix equipment 4.2—Dry-mix equipment |
43 | 4.3—Wet-mix equipment 4.3—Wet-mix equipment |
44 | 4.4—Air requirements 4.4—Air requirements |
45 | 4.5—Mixing equipment 4.5—Mixing equipment 4.6—Hoses 4.6—Hoses |
46 | 4.7—Nozzles 4.7—Nozzles |
47 | 4.8—Auxiliary equipment 4.8—Auxiliary equipment |
49 | 4.9—Plant layout and operation 4.9—Plant layout and operation 4.10—Other uses of shotcrete equipment 4.10—Other uses of shotcrete equipment |
50 | PART 5—CREW ORGANIZATION PART 5—CREW ORGANIZATION 5.1—Introduction 5.1—Introduction 5.2—Composition and crew duties 5.2—Composition and crew duties |
51 | 5.3—Crew qualifications 5.3—Crew qualifications 5.4—Communication 5.4—Communication PART 6—SUSTAINABILITY PART 6—SUSTAINABILITY 6.1—Shotcrete sustainability 6.1—Shotcrete sustainability |
52 | 6.2—Formwork reduction or elimination 6.2—Formwork reduction or elimination 6.3—Construction efficiency 6.3—Construction efficiency 6.4—Repair and rehabilitation 6.4—Repair and rehabilitation 6.5—Creativity and efficiency of shotcrete sections 6.5—Creativity and efficiency of shotcrete sections 6.6—Summary 6.6—Summary PART 7—REFERENCES PART 7—REFERENCES |
54 | Authored references Authored references |