Shopping Cart

No products in the cart.

ACI 506R 16:2016 Edition

$51.46

506R-16 Guide to Shotcrete

Published By Publication Date Number of Pages
ACI 2016 56
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This guide is a companion document to ACI 506.2, “Specification for Shotcrete,” and provides information on materials and properties of both dry-mix and wet-mix shotcrete. Most facets of the shotcrete process are covered, including application procedures, equipment requirements, and responsibilities of the shotcrete crew. Other aspects, such as preconstruction trials, craftsman qualification tests, materials tests, finished shotcrete acceptance tests, and equipment, are also discussed. Keywords: dry-mix shotcrete; mixture proportion; placing; quality control; shotcrete; wet-mix shotcrete.

PDF Catalog

PDF Pages PDF Title
3 TITLE PAGE
TITLE PAGE
4 PREFACE
PREFACE
Introduction
Introduction
History
History
Applications
Applications
New developments
New developments
5 Research and development
Research and development
PART 1—GENERAL
PART 1—GENERAL
1.1—Scope
1.1—Scope
6 1.2—Definitions
1.2—Definitions
7 1.3—References: See Part 7—References
1.3—References: See Part 7—References
1.4—Submittals
1.4—Submittals
1.5—Preconstruction testing by contractor
1.5—Preconstruction testing by contractor
8 1.6—Testing during construction: quality assurance and quality control
1.6—Testing during construction: quality assurance and quality control
11 1.7—Delivery, storage, and handling
1.7—Delivery, storage, and handling
PART 2—PRODUCTS
PART 2—PRODUCTS
2.1—Materials
2.1—Materials
15 2.2—Packaged shotcrete materials
2.2—Packaged shotcrete materials
2.3—Fiber-reinforced shotcrete
2.3—Fiber-reinforced shotcrete
2.4—Shotcrete properties
2.4—Shotcrete properties
18 2.5—Proportioning
2.5—Proportioning
20 2.6—Batching and mixing
2.6—Batching and mixing
22 PART 3—EXECUTION
PART 3—EXECUTION
3.1—Surface preparation
3.1—Surface preparation
25 3.2—Joints
3.2—Joints
26 3.3—Alignment control
3.3—Alignment control
27 3.4—Application
3.4—Application
37 3.5—Finishing
3.5—Finishing
39 3.6—Curing
3.6—Curing
40 3.7—Protection
3.7—Protection
3.8—Tolerances
3.8—Tolerances
41 3.9—Repair
3.9—Repair
3.10—Acceptance
3.10—Acceptance
42 PART 4—EQUIPMENT
PART 4—EQUIPMENT
4.1—Introduction
4.1—Introduction
4.2—Dry-mix equipment
4.2—Dry-mix equipment
43 4.3—Wet-mix equipment
4.3—Wet-mix equipment
44 4.4—Air requirements
4.4—Air requirements
45 4.5—Mixing equipment
4.5—Mixing equipment
4.6—Hoses
4.6—Hoses
46 4.7—Nozzles
4.7—Nozzles
47 4.8—Auxiliary equipment
4.8—Auxiliary equipment
49 4.9—Plant layout and operation
4.9—Plant layout and operation
4.10—Other uses of shotcrete equipment
4.10—Other uses of shotcrete equipment
50 PART 5—CREW ORGANIZATION
PART 5—CREW ORGANIZATION
5.1—Introduction
5.1—Introduction
5.2—Composition and crew duties
5.2—Composition and crew duties
51 5.3—Crew qualifications
5.3—Crew qualifications
5.4—Communication
5.4—Communication
PART 6—SUSTAINABILITY
PART 6—SUSTAINABILITY
6.1—Shotcrete sustainability
6.1—Shotcrete sustainability
52 6.2—Formwork reduction or elimination
6.2—Formwork reduction or elimination
6.3—Construction efficiency
6.3—Construction efficiency
6.4—Repair and rehabilitation
6.4—Repair and rehabilitation
6.5—Creativity and efficiency of shotcrete sections
6.5—Creativity and efficiency of shotcrete sections
6.6—Summary
6.6—Summary
PART 7—REFERENCES
PART 7—REFERENCES
54 Authored references
Authored references
ACI 506R 16
$51.46