ASHRAE Guideline 1.1 2007 Spanish
$47.13
ASHRAE Directriz 1.1-2007 Requisitos Tecnicos para el Proceso de Comision HVAC&R
Published By | Publication Date | Number of Pages |
ASHRAE | 2007 | 164 |
HVAC&R commissioning guidance is now available in Spanish! Guideline 1.1-2007 has been translated in full into Spanish. Although Guideline 1.1 focuses upon HVAC&R systems, a successful total building commissioning process will carefully validate interfaces and possible interferences between all building systems. Even when HVAC&R is the primary focus of the commissioning process, coordination among disciplines is essential for success. Annexes are included in this guideline to assist in the implementation of the commissioning process to HVAC&R systems and assemblies. The annexes are based upon actual project experience, with details based upon current practice, and they illustrate application of the commissioning process to a variety of HVAC&R systems and equipment.
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | PRÓLOGO |
6 | 1. PROPÓSITO 1.1 El propósito de esta directriz es describir los requisitos técnicos para la aplicación del proceso de comisión descrito en la Directriz 0-2005 de ASHRAE que verificará que los sistemas de calefacción, ventilación, aire acondicionado y refr… 2. ALCANCE 2.1 Los requisitos de procedimientos, métodos y documentación en esta directriz describen la aplicación del proceso de comisión para la entrega de cada fase del proyecto desde el Pre Diseño hasta la Ocupación y Operaciones del Dueño para todos… 2.2 Los requisitos de procedimientos, métodos y documentación se aplican a construcciones nuevas y a las actividades del proceso de comisión continuo o requisitos de todas las porciones de edificios e instalaciones. También pueden aplicarse a pro… 3. USO 3.1 La aplicación de esta directriz dependerá de los Requisitos del Proyecto del Dueño y de cómo los proyectos van a ser diseñados, construidos y operados. Esta directriz es suplementaria al proceso de comisión detallado en la Directriz 0-2005…. 3.2 Esta guía describe detalles específicos requeridos para implementar en forma adecuada el proceso de comisión relativo a sistemas HVAC&R. Esto incluye documentación, procedimientos de prueba y listas de verificación. 4. DEFINICIONES 5. FASE DE PRE DISEÑO 5.1 Introducción |
7 | 5.2 Actividades del Pre Diseño del Proceso de Comisión |
11 | 5.3 Criterios de Aceptación. Ver la Directriz 0-2005 sección 5.3 para los requisitos generales de aceptación. Los Anexos H de la Directriz 0-2005 y de esta Directriz proveen información adicional. 5.4 Documentación de la Fase de Pre Diseño. Ver la sección 5.4 de la Directriz 0-2005 para los requisitos de la documentación. Se provee información adicional en el Anexo D de la Directriz 0-2005. 5.5 Identificación de Requisitos de Entrenamiento en la Fase de Pre Diseño. Ver la sección 5.5 de la Directriz 0-2005 para procedimientos de identificación de entrenamiento. Se provee información adicional en el Anexo P de la Directriz 0- 2005 y… 6. FASE DE DISEÑO 6.1 Introducción 6.2 Actividades del Proceso de Comisión para la Fase de Diseño |
15 | 6.3 Requisitos de Aceptación de la Fase de Diseño. Refiérase a la Directriz 0-2005, sección 6.3 para los requisitos de aceptación de la Fase de Diseño. 6.4 Requisitos de Documentación de la Fase de Diseño. Refiérase a la Directriz 0-2005 sección 6.4 para los requisitos de documentación de la Fase de Diseño. 6.5 Identificación de los Requisitos de Entrenamiento Durante la Fase de Diseño. Refiérase a la Directriz 0-2005, sección 6.5 para los requisitos de entrenamiento de la Fase de Diseño. 7. FASE DE CONSTRUCCIÓN 7.1 Introducción. Las actividades del proceso de comisión que serán desarrolladas por varios miembros del equipo de comisión, durante la Fase de Construcción se describen en la Directriz 0-2005, sección 7. Información adicional sobre las activ… 7.2 Actividades de la Fase de Construcción del Proceso de Comisión |
21 | 7.3 Requisitos de Aceptación de la Fase de Construcción. Ver la Directriz 0-2005, sección 7.3 para los requisitos. 7.4 Requisitos de Documentación de la Fase de Construcción. Ver la Directriz 0-2005, sección 7.4 para los requisitos. 7.5 Requisitos de Entrenamiento de la Fase de Construcción. Ver la Directriz 0-2005, sección 7.5 para los requisitos. 8. FASE DE OCUPACIÓN Y OPERACIONES 8.1 Introducción. Las actividades del proceso de comisión descritas en esta sección a ser desarrolladas por varios miembros del equipo de comisión durante la Fase de Ocupación y Operaciones están descritos en general en la Directriz 0-2005, sec… 8.2 Actividades de la Fase de Ocupación y Operaciones del Proceso de Comisión |
23 | 8.3 Requisitos de Aceptación de la Fase de Ocupación y Operaciones. Los requisitos de aceptación de la Fase de Ocupación y Operaciones se detallan en la Directriz 0-2005, sección 8.3. 8.4 Requisitos de Documentación de la Fase de Ocupación y Operaciones. Los requisitos para la documentación de la Fase de Ocupación y Operaciones se detallan en la Directriz 0-2005, sección 8.4. 8.5 Requisitos de Entrenamiento de la Fase de Ocupación y Operaciones. Los requisitos de entrenamiento del proceso de comisión para la Fase de Ocupación y Operaciones se detallan en la Directriz 0-2005, sección 8.5. ÃNDICE A LOS ANEXOS |
24 | ANEXO INFORMATIVO G— PLAN DE COMISIÓN |
25 | TABLA DE CONTENIDOS RESUMEN DEL PLAN DE COMISIÓN |
26 | DESCRIPCIÓN DEL PROCESO DE COMISIÓN |
32 | Información de Contacto |
34 | ÃNDICE DE INFORMACIÓN SUPLEMENTARIA |
36 | REGISTRO DE ACONTECIMIENTOS/BENEFICIOS |
37 | ANEXO INFORMATIVO H— PLAN DE ACEPTACIÓN |
39 | ANEXO INFORMATIVO I— ORIENTACION PARA EL TALLER DE TRABAJO SOBRE LOS REQUISITOS DEL PROYECTO DEL DUEÑO ANEXO INFORMATIVO J— REQUISITOS DEL PROYECTO DEL DUEÑO |
44 | TABLA 1 Horario de Ocupación |
63 | ANEXO INFORMATIVO K— BASES DE DISEÑO |
71 | ANEXO INFORMATIVO L— ESPECIFICACIONES 1. ORGANIZACIÓN DE ESPECIFICACIONES DE LA COMISIÓN |
72 | 2. ACTIVIDADES RELACIONADAS A LA COMISIÓN |
73 | 3. PROCEDIMIENTOS DE PRUEBA DEL PROCESO DE COMISIÓN 4. ASIGNACIÓN PARA PRUEBAS 5. PRECIOS UNITARIOS PARA AJUSTAR ASIGNACIONES POR PRUEBAS |
74 | 6. LISTAS DE VERIFICACIÓN DE LA CONSTRUCCIÓN 7. INTRODUCCIÓN A LA GUÃA DE ESPECIFICACIONES |
75 | SECCIÓN 230800-COMISIÓN DE HVAC PARTE 1—GENERAL 1.1 DOCUMENTOS RELACIONADOS 1.2 RESUMEN 1.3 ASIGNACIONES 1.4 PRECIOS UNITARIOS 1.5 RESPONSABILIDADES DEL CONTRATISTA 1.6 RESPONSABILIDADES DE LA CxA 1.7 DOCUMENTACIÓN DE LA COMISIÓN |
76 | 1.8 ENTREGAS (SOMETIMIENTO) PARTE 2—PRODUCTOS (No Usada) PARTE 3—EJECUCIÓN 3.1 PREPARACIÓN PARA LAS PRUEBAS 3.2 VERIFICACIÓN DE LAS PRUEBAS Y BALANCEO 3.3 REQUISITOS GENERALES DE LAS PRUEBAS |
77 | 3.4 PROCEDIMIENTOS DE PRUEBAS DE SISTEMAS, SUBSISTEMAS Y EQUIPOS HVAC&R 3.5 PROCEDIMIENTOS PARA MEDICIÓN Y AJUSTES DE PRESURIZACIÓN DEL ESPACIO |
78 | 3.6 PROCEDIMIENTOS PARA MEDICIÓN Y AJUSTE DEL SISTEMA DE PRESURIZACIÓN DE LA CAJA DE ESCALERA |
79 | 3.7 PROCEDIMIENTOS PARA MEDICIONES DE VIBRACIÓN 3.8 PROCEDIMIENTOS PARA MEDICIONES DE NIVEL DE SONIDO |
80 | 3.9 PROCEDIMIENTOS PARA PRUEBA DE SISTEMAS DE CONTROL DE HUMO |
81 | 3.10 PROCEDIMIENTOS PARA MEDICIÓN DE CALIDAD DE AIRE INTERIOR FIN DE LA SECCIÓN 230800 ANEXO INFORMATIVO M— EJEMPLOS DE LISTAS DE VERIFICACIÓN |
83 | 1. Lista de Verificación de Pre Diseño: Segunda Revisión Mecánica (Como parte de la Programación de la Entrega a Sometimiento de la Segunda Revisión de Arquitectura) Directriz ASHRAE 1.1 Ejemplo de Lista de Verificació |
84 | 2. Lista de Verificación de Diseño para la Primera Entrega del Ingeniero Mecánico Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
85 | 3. Unidad Manejadora de Aire, Agua Fría y Agua Caliente: UMA-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
88 | 4. Caldera, Agua Caliente: B-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
90 | 5. Enfriador Centrífugo: EC-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
92 | 6. Torre de Enfriamiento: TE-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
94 | 7. Serpentín de Agua Caliente para Calefacción: SAC-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
95 | 8A. Tuberías HVAC: Aislamiento Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
96 | 8B. Tuberías HVAC: Aislamiento—Lista de Verificaciones Diarias Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
97 | 9A. Ductos: Instalación Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
98 | 9B. Ductos: Instalación—Lista de Verificación Diaria Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
99 | 10A. Ductos: Aislamiento Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
100 | 10B. Ductos: Aislamiento—Lista de Verificación Diaria Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
101 | 11 Rueda Recuperadora de Energía: RC-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
103 | 12. Ventilador de Extracción: VEX-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
105 | 13. Unidad Serpentín Ventilador—“Fan-coil”, AE agua enfriada y AC caliente: FC-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
107 | 14. Compuerta Contrafuego: CF-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
108 | 15. Rejillas, Registros y Difusores: Difusores Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
109 | 16. Humidificador, Vapor: HV-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
110 | 17. Tuberías HVAC: Instalación Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
111 | 18. Caja VAV, Sin Ventilador con Calefacción por Agua Caliente: VAV-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
113 | 19. Bomba, HVAC: B-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
115 | 20. Unidad de Aire Acondicionado de Sistema Dividido o “Split” (parte del serpentín): SDI-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
117 | 21. Unidad de Aire Acondicionado de Sistema Dividido o “Split” (parte del compresor): SDE-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
118 | 22. Calefactor Unitario (Agua Caliente): CU-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación |
119 | 23. Transmisión de Velocidad Variable: TVV-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
121 | 24. Caja VAV, Impulsada por Ventilador c/calefactor eléctrico: VAVCE-1 Directriz ASHRAE 1.1 Ejemplo de Lista de Verificación (Continuación) |
123 | 25. Operaciones y Mantenimiento: Lista de Verificación de Eficiencia Energética (Se debe completar una copia para el día 18 de cada mes, comenzando desde el [Mes][Año] hasta [Mes][Año], al finalizar la implementación del proceso inicial de comi… |
124 | ANEXO INFORMATIVO N— EJEMPLOS DE MUESTREO BASADO EN CALIDAD |
127 | ANEXO INFORMATIVO O— MANUAL DE SISTEMAS |
129 | ANEXO INFORMATIVO P— MANUAL DE ENTRENAMIENTO Y NECESIDADES DE ENTRENAMIENTO |
133 | ANEXO INFORMATIVO Q— PUBLICACIONES, ARTÃCULOS, REFERENCIAS, CÓDIGOS, REGULACIONES Y ESTÃNDARES |
138 | ANEXO INFORMATIVO R— REQUISITOS DE INTEGRACIÓN |
139 | Aspectos sobre Integración de Sistemas (de la Directriz NIBS 3) (Continuación) |
141 | Aspectos de los Cierres Exteriores (de la Directriz NIBS 3) (Continuación) |
146 | ANEXO INFORMATIVO S— INTERFERENCIA Y COORDINACIÓN CON OTROS SISTEMAS Y MONTAJES |
148 | Figura S-1 Dibujo típico de coordinación interdisciplinaria y detalle de sección del pleno. ANEXO INFORMATIVO T— COMUNICACIONES: QUÉ, CUÃNDO Y QUIÉN |
149 | Figura T-1 Requisitos del Proyecto del Dueño (RPD). |
150 | Figura T-2 Plan de Comisión (Plan Cx). |
151 | Figura T-3 Bases de Diseño (BoD). |
152 | Figura T-4 Requisitos de Sometimientos. |
153 | Figura T-5 Requisitos de Operaciones y Mantenimiento (O&M). |
154 | Figura T-6 Documentos de Registro. |
155 | Figura T-7 Requisitos de Entrenamiento. |
156 | Figura T-8 Manual de Sistemas. |
157 | ANEXO INFORMATIVO U— PROCEDIMIENTOS DE PRUEBA Y FORMULARIOS DE DATOS |
160 | Figura U-1 Disposición del Edificio para las pruebas de confort de los RPD. |