ASME BPVC CC NC S01 2017
$377.00
ASME BPVC CODE CASES: Nuclear Components- Supplement 01-2017
Published By | Publication Date | Number of Pages |
ASME | 2017 | 131 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
49 | Tables Table -3131-1(a) Long-Term Allowable Stress, S, for Polyethylene (psi) Table -3131-1(b) Long-term Allowable Stress, S, for Polyethylene (MPa) |
50 | Table -3131-1(c) Elevated Temperature Allowable Stress, S, for Polyethylene (psi) Table -3131-1(d) Elevated Temperature Allowable Stress, S, for Polyethylene (MPa) Table -3210-1 Maximum Allowable Ring Deflection, Ωmax Table -3210-2(a) Soil Support Factor, FS (in.) |
51 | Table -3210-2(b) Soil Support Factor, FS (mm) Table -3210-3(a) Modulus of Elasticity of Polyethylene Pipe, Epipe (psi) Table -3210-3(b) Modulus of Elasticity of Polyethylene Pipe, Epipe (MPa) |
52 | Table -3220(a) Allowable Side Wall Compression Stress, Scomp (psi) Table -3220(b) Allowable Side Wall Compression Stress, Scomp (MPa) Table -3221.2-1 Ovality Correction Factor, fo Table -3223-1 Stress Indices, B1 and B2 Table -3223-2 Design and Service Level Longitudinal Stress Factors, k |
53 | Figures Figure -4310-1 Thermal Fusion Butt Joint Table -3223-3 Short Duration (<5 min) Allowable Longitudinal Tensile Stress Values Table -3311.2-1 Stress Intensification Factor, i |
54 | Figure -4421.3-1 Tapered Transition Joint |
56 | Figure -4520-1 Transition Flange Arrangement Figure -5321-1 Polyethylene Pipe Butt Fusion Joint O.D. Bead (Cross Section View) |
63 | Figure I-105 Horizontal Axis Position |
64 | Figure I-121-1 Polyethylene Pipe Butt Fusion Joint O.D. Bead (Cross-Section View) |
65 | Figure I-131.2 Tensile Full Thickness Impact Test Coupon Configuration Table I-131.4 Testing Speed |
66 | Figure I-131.7 Tensile Test Sample Evaluation Sample Figure I-133.1 Bend Specimen Figure I-221(b)-1 Minimum Melt Bead Size |
67 | Table I-221(b)-1 Minimum Melt Table I-221(b)-2 Maximum Heater Plate Removal Time for Pipe-to-Pipe Fusing |
76 | Table IV-121 Certification Requirements for Polyethylene Compound Table IV-141.1 Minimum Quality Testing Requirements for Polyethylene Compound Lots |
77 | Table IV-141.2 Minimum Quality Testing Requirements for Natural Compound Lots Table IV-141.3 Minimum Quality Testing Requirements for Pigment Concentrate Compound Lots Table IV-142.1 Minimum Quality Testing Requirements for Polyethylene Source Material |
78 | Table IV-142.2 Minimum Quality Testing Requirements for Polyethylene Material — Pipe |
80 | Table A-110-1 Fusion Standards and Specifications Referenced in Text |
83 | Figure B-1 Typical Time/Pressure Diagram of a Butt Fusion Joint |
84 | Figure B-2 Correct Procedure |
85 | Figure B-3 Incorrect Procedures |
86 | Figure C-1 Fusion Bead Configuration |
87 | Table D-1 Standards and Specifications Referenced in Text Table D-2 Seismic Strain Limits |
88 | Figure E-1 Polyethylene Material Organization Responsibilities per NCA-3970 |
91 | Figures Figure 1 Type A Reinforcing Sleeve |
92 | Figure 2 Type B Reinforcing Sleeves |
93 | Figure 3 Type A and Type B Sleeve Longitudinal Seams |
94 | Figure 4 Bulge to Accommodate Girth Weld |
95 | Figure 5 Design Details — Type B Full-Structural Sleeves |
96 | Figure 6 Sleeve Reinforcement Connection to Weld Neck Flange |
101 | Figures Figure 1 Structural Pad |
102 | Figure 2 Pressure Pad |
103 | Figure 3 Reinforcing Pad Connection to Weld Neck Flange |
109 | FORM FORM N-10 REPORT FOR REPAIRS TO STAMPED COMPONENTS* As Required by the Provisions of Section III, Division 1, Code and Code Case N-801 |
111 | Table Table N-10-1 Guide for Completing Form N-10 |
118 | Figures Figure -1000-1 Logic Flow Diagram of SBC Process |
119 | Tables Table 1 Degradation Mechanisms Criteria |
120 | Table 2A Alternative Requirements to Table IMB-2500-1 – Examination Category B-A |
121 | Table 2B Alternative Requirements to Table IMB-2500-1 – Examination Category B-B Table 2C Alternative Requirements to Table IMB-2500-1 – Examination Category B-J-1 |
122 | Table 2D Alternative Requirements to Table IMB-2500-1 – Examination Category B-J-2 Table 2E Alternative Requirements to Table IMB-2500-1 – Examination Category B-N |
126 | Figure II-2100-1 Reliability Evaluation Procedure |
127 | Figure II-3100-1 Failure Scenario Setting Procedure Figure II-4100-1 Modeling Procedure |
131 | Tables Table 1 Chemical Composition (Heat or Cast Analysis) Table 2 Mechanical Properties |