Shopping Cart

No products in the cart.

AWWA C602 2023

$76.92

AWWA C602-23 Cement-Mortar Lining of Water Pipelines in Place—4 In. (100 mm) and Larger

Published By Publication Date Number of Pages
AWWA 2023 32
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The purpose of this standard is to define the minimum requirements for cement-mortar lining of water pipelines, 4 in. (100 mm) and larger, in place, including materials, design, and methods for construction.

PDF Catalog

PDF Pages PDF Title
7 Foreword
I. Introduction.
I.A. Background. Cement–mortar lining provides the interior of a ferrous-metal pipe with a smooth finish that protects it from corrosion and tuberculation. The lining can significantly retard the recurrence of these problems in previously used pipe if the
8 I.C. Acceptance. In May 1985, the US Environmental Protection Agency (USEPA) entered into a cooperative agreement with a consortium led by NSF International (NSF) to develop voluntary third-party consensus standards and a certification program for direct
11 III.B. Modification to Standard. Any modification to the provisions, definitions, or terminology in this standard must be provided by the purchaser.
IV. Major Revisions. The major changes made to the standard in this edition include the following:
13 AWWA Standard
0BSECTION 1: GENERAL
Sec. 1.1 Scope
Sec. 1.2 Purpose
14 Sec. 1.3 Application
1BSECTION 2: REFERENCES
SECTION 3: DEFINITIONS
15 SECTION 4: REQUIREMENTS
Sec. 4.1 Workmanship
Sec. 4.2 Equipment
Sec. 4.3 Materials for Construction
16 Sec. 4.4 General Cement–Mortar Lining Design
27 Sec. 5.2 Inspection of Rehabilitated Pipelines
AWWA C602 2023
$76.92