Shopping Cart

No products in the cart.

BS IEC/IEEE 80005-1:2019 – TC:2020 Edition

$280.87

Tracked Changes. Utility connections in port – High voltage shore connection (HVSC) systems. General requirements

Published By Publication Date Number of Pages
BSI 2020 167
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC/IEEE 80005-1:2019 is available as /2 which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition. IEC/IEEE 80005-1:2019 describes high-voltage shore connection (HVSC) systems, onboard the ship and on shore, to supply the ship with electrical power from shore. This document is applicable to the design, installation and testing of HVSC systems and addresses: – HV shore distribution systems, – shore-to-ship connection and interface equipment, – transformers/reactors, – semiconductor/rotating frequency convertors, – ship distribution systems, and – control, monitoring, interlocking and power management systems. It does not apply to the electrical power supply during docking periods, for example dry docking and other out of service maintenance and repair. Additional and/or alternative requirements can be imposed by national administrations or the authorities within whose jurisdiction the ship is intended to operate and/or by the owners or authorities responsible for a shore supply or distribution system. It is expected that HVSC systems will have practicable applications for ships requiring 1 MVA or more or ships with HV main supply. Low-voltage shore connection systems are not covered by this document. This second edition cancels and replaces the first edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) modification of 4.1, Figure 1: transformer on ship is optional, earthing switches on ship removed; b) 4.2.2 and new item 11.3: alternative procedure of periodic testing added; c) modification of 4.9: – minimum current value in the safety circuits shall be 50 mA; – opening of safety loop shall cause the automatic opening of ship and shore HVSC circuit breakers in a maximum time of 200 ms; d) modification of 5.2: added Figure on harmonic contents; e) modification of 6.2.3: – earthing transformer with resistor can be used also on the secondary side; – neutral earthing resistor rating in amperes shall be minimum 25 A, 5 s; f) modification of all annexes: the safety circuits shall be mandatory; g) modification of A.2.1: a metallic shield shall be installed at least on the power cores or common on pilot wires; h) modification of B.7.2.1: new safety circuit introduced: single line diagram and description; i) modification of C.4.1: SLD for cruise ships was updated, also the safety circuits to be coherent with main body, IEC symbols and introduced more details about the control socket-outlets and plugs manufacturer type; j) modification of C.7.3.1: – shore power connector pin assignment is updated; – all cruise ships shall use 4 cables in all cases; k) added D.6.1: the supply point on shore can be fixed or movable; l) modification of D.7.3.2: the voltage used in the pilot circuit for container ships shall be less than 60 V DC or 25 V AC. m) added D.8.6 and D.9.3.1: automatic restart and synchronization alternatives; n) Annex E set to informative; o) Annex F set to informative.

PDF Catalog

PDF Pages PDF Title
91 undefined
93 CONTENTS
97 FOREWORD
100 INTRODUCTION
101 1 Scope
2 Normative references
102 3 Terms and definitions
104 4 General requirements
4.1 System description
105 4.2 Distribution system
4.2.1 General
4.2.2 Equipotential bonding
Figures
Figure 1 – Block diagram of a typical described HVSC system arrangement
106 4.3 Compatibility assessment before connection
4.4 HVSC system design and operation
4.4.1 System design
4.4.2 System operation
107 4.5 Personnel safety
4.6 Design requirements
4.6.1 General
4.6.2 Protection against moisture and condensation
4.6.3 Location and construction
108 4.6.4 Electrical equipment in areas where flammable gas or vapour and/or combustible dust can be present
4.7 Electrical requirements
4.8 System study and calculations
109 4.9 Emergency shutdown including emergency-stop facilities
110 5 HV shore supply system requirements
5.1 Voltages and frequencies
111 5.2 Quality of HV shore supply
Figure 2 – Phase sequences
112 Figure 3 – Single harmonic distortion limits
113 6 Shore side installation
6.1 General
6.2 System component requirements
6.2.1 Circuit-breaker, disconnector and earthing switch
6.2.2 Transformer
114 6.2.3 Neutral earthing resistor
6.2.4 Equipment-earthing conductor bonding
6.3 Shore-to-ship electrical protection system
115 6.4 HV interlocking
6.4.1 General
6.4.2 Operating of the high-voltage (HV) circuit breakers, disconnectors and earthing switches
116 6.5 Shore connection convertor equipment
6.5.1 General
6.5.2 Degree of protection
6.5.3 Cooling
117 6.5.4 Protection
7 Ship-to-shore connection and interface equipment
7.1 General
7.2 Cable management system
7.2.1 General
118 7.2.2 Monitoring of cable mechanical tension
7.2.3 Monitoring of the cable length
7.2.4 Connectors protection
7.2.5 Equipotential bond monitoring
7.2.6 Slip ring units
119 7.3 Connectors
7.3.1 General
7.3.2 Pilot contacts
7.3.3 Earth contact
120 7.3.4 Fibre-optic connection
Figure 4 – Fibre-optic socket outlet
121 7.4 Interlocking of earthing switches
7.5 Ship-to-shore connection cable
Figure 5 – Fibre-optic plug
122 7.6 Control and monitoring cable
7.7 Storage
7.8 Data communication
8 Ship requirements
8.1 General
123 8.2 Ship electrical distribution system protection
8.2.1 Short-circuit protection
8.2.2 Earth fault protection, monitoring and alarm
8.3 Shore connection switchboard
8.3.1 General
8.3.2 Circuit-breaker, disconnector and earthing switch
124 8.3.3 Instrumentation and protection
8.4 Onboard transformer
8.5 Onboard receiving switchboard connection point
8.5.1 General
8.5.2 Circuit-breaker and earthing switch
125 8.5.3 Instrumentation
8.5.4 Protection
126 8.5.5 Operation of the circuit-breaker
8.6 Ship power restoration
127 9 HVSC system control and monitoring
9.1 General
9.2 Load transfer via blackout
9.3 Load transfer via automatic synchronization
9.3.1 General
128 9.3.2 Protection
10 Verification and testing
10.1 General
10.2 Initial tests of shore side installation
10.2.1 General
10.2.2 Tests
129 10.3 Initial tests of ship-side installation
10.3.1 General
10.3.2 Tests
10.4 Tests at the first call at a shore supply point
10.4.1 General
10.4.2 Tests
130 11 Periodic tests and maintenance
11.1 General
11.2 Tests at repeated calls of a shore supply point
11.2.1 General
11.2.2 Verification
11.3 Earthing bonding connections
131 12 Documentation
12.1 General
12.2 System description
132 Annexes
Annex A (informative) Ship-to-shore connection cable
A.1 Rated voltage
A.2 General design
135 A.3 Tests on complete cables
136 Figure A.1 – Bending test arrangement
138 Annex B (normative) Additional requirements for Roll-on Roll-off (Ro-Ro) cargo ships and Ro-Ro passenger ships
B.1 General
139 Figure B.1 – General system diagram
141 Figure B.2 – Safety circuits
142 Figure B.3 – Three-phase plug and socket-outlet contact assignment
143 Annex C (normative) Additional requirements for cruise ships
C.1 General
Figure C.1 – General system diagram
144 Figure C.2 – Cruise ship HVSC system functional diagram
147 Figure C.3 – Safety and control circuits
148 C.6 Shore side installation
149 Figure C.4 – Three-phase ship connector and ship inlet contact assignment
150 Figure C.5 – Three-phase ship inlet fitted with fail-safe limit switch
151 Annex D (normative) Additional requirements of container ships
D.1 General
Figure D.1 – General system diagram
153 Figure D.2 – Safety circuits
154 Figure D.3 – Three-phase plug and socket-outlet contact assignment
155 Annex E (informative) Additional requirements of liquefied natural gas carriers (LNGC)
E.1 General
156 Figure E.1 – General system diagram
157 Tables
Table E.1 – LNGC 140 000 m3 to 225 000 m3
Table E.2 – LNGC > 225 000 m3
159 Figure E.2 – Three-phase ship connector and ship inlet contact assignment
161 Annex F (informative) Additional requirements for tankers
F.1 General
Figure F.1 – General system diagram
163 Figure F.2 – Three-phase shore plug and ship socket-outlet contact assignment
164 Bibliography
BS IEC/IEEE 80005-1:2019 - TC
$280.87