{"id":161002,"date":"2024-10-19T09:40:16","date_gmt":"2024-10-19T09:40:16","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-506r-16\/"},"modified":"2024-10-25T01:58:51","modified_gmt":"2024-10-25T01:58:51","slug":"aci-506r-16","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-506r-16\/","title":{"rendered":"ACI 506R 16"},"content":{"rendered":"
This guide is a companion document to ACI 506.2, \u201cSpecification for Shotcrete,\u201d and provides information on materials and properties of both dry-mix and wet-mix shotcrete. Most facets of the shotcrete process are covered, including application procedures, equipment requirements, and responsibilities of the shotcrete crew. Other aspects, such as preconstruction trials, craftsman qualification tests, materials tests, finished shotcrete acceptance tests, and equipment, are also discussed. Keywords: dry-mix shotcrete; mixture proportion; placing; quality control; shotcrete; wet-mix shotcrete.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | TITLE PAGE TITLE PAGE <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | PREFACE PREFACE Introduction Introduction History History Applications Applications New developments New developments <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Research and development Research and development PART 1\u2014GENERAL PART 1\u2014GENERAL 1.1\u2014Scope 1.1\u2014Scope <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 1.2\u2014Definitions 1.2\u2014Definitions <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1.3\u2014References: See Part 7\u2014References 1.3\u2014References: See Part 7\u2014References 1.4\u2014Submittals 1.4\u2014Submittals 1.5\u2014Preconstruction testing by contractor 1.5\u2014Preconstruction testing by contractor <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1.6\u2014Testing during construction: quality assurance and quality control 1.6\u2014Testing during construction: quality assurance and quality control <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.7\u2014Delivery, storage, and handling 1.7\u2014Delivery, storage, and handling PART 2\u2014PRODUCTS PART 2\u2014PRODUCTS 2.1\u2014Materials 2.1\u2014Materials <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 2.2\u2014Packaged shotcrete materials 2.2\u2014Packaged shotcrete materials 2.3\u2014Fiber-reinforced shotcrete 2.3\u2014Fiber-reinforced shotcrete 2.4\u2014Shotcrete properties 2.4\u2014Shotcrete properties <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 2.5\u2014Proportioning 2.5\u2014Proportioning <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 2.6\u2014Batching and mixing 2.6\u2014Batching and mixing <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | PART 3\u2014EXECUTION PART 3\u2014EXECUTION 3.1\u2014Surface preparation 3.1\u2014Surface preparation <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 3.2\u2014Joints 3.2\u2014Joints <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 3.3\u2014Alignment control 3.3\u2014Alignment control <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 3.4\u2014Application 3.4\u2014Application <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 3.5\u2014Finishing 3.5\u2014Finishing <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 3.6\u2014Curing 3.6\u2014Curing <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 3.7\u2014Protection 3.7\u2014Protection 3.8\u2014Tolerances 3.8\u2014Tolerances <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 3.9\u2014Repair 3.9\u2014Repair 3.10\u2014Acceptance 3.10\u2014Acceptance <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | PART 4\u2014EQUIPMENT PART 4\u2014EQUIPMENT 4.1\u2014Introduction 4.1\u2014Introduction 4.2\u2014Dry-mix equipment 4.2\u2014Dry-mix equipment <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 4.3\u2014Wet-mix equipment 4.3\u2014Wet-mix equipment <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 4.4\u2014Air requirements 4.4\u2014Air requirements <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 4.5\u2014Mixing equipment 4.5\u2014Mixing equipment 4.6\u2014Hoses 4.6\u2014Hoses <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 4.7\u2014Nozzles 4.7\u2014Nozzles <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 4.8\u2014Auxiliary equipment 4.8\u2014Auxiliary equipment <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 4.9\u2014Plant layout and operation 4.9\u2014Plant layout and operation 4.10\u2014Other uses of shotcrete equipment 4.10\u2014Other uses of shotcrete equipment <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | PART 5\u2014CREW ORGANIZATION PART 5\u2014CREW ORGANIZATION 5.1\u2014Introduction 5.1\u2014Introduction 5.2\u2014Composition and crew duties 5.2\u2014Composition and crew duties <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 5.3\u2014Crew qualifications 5.3\u2014Crew qualifications 5.4\u2014Communication 5.4\u2014Communication PART 6\u2014SUSTAINABILITY PART 6\u2014SUSTAINABILITY 6.1\u2014Shotcrete sustainability 6.1\u2014Shotcrete sustainability <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 6.2\u2014Formwork reduction or elimination 6.2\u2014Formwork reduction or elimination 6.3\u2014Construction efficiency 6.3\u2014Construction efficiency 6.4\u2014Repair and rehabilitation 6.4\u2014Repair and rehabilitation 6.5\u2014Creativity and efficiency of shotcrete sections 6.5\u2014Creativity and efficiency of shotcrete sections 6.6\u2014Summary 6.6\u2014Summary PART 7\u2014REFERENCES PART 7\u2014REFERENCES <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Authored references Authored references <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 506R-16 Guide to Shotcrete<\/b><\/p>\n |