{"id":263940,"date":"2024-10-19T17:35:33","date_gmt":"2024-10-19T17:35:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-79812002\/"},"modified":"2024-10-25T13:26:07","modified_gmt":"2024-10-25T13:26:07","slug":"bs-79812002","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-79812002\/","title":{"rendered":"BS 7981:2002"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nBRITISH STANDARD <\/td>\n<\/tr>\n
2<\/td>\nCommittees responsible for this British\ufffdStandard <\/td>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\n1 Scope
2 Normative references
3 Terms and definitions
3.1 rated load
3.2 rated speed
3.3 transfer <\/td>\n<\/tr>\n
6<\/td>\n3.4 transport
3.5 base frame
3.6 chassis
3.7 outriggers
3.8 mast
3.9 guides
3.10 mast tie
3.11 work platform
3.12 main platform
3.13 buffer
3.14 overspeed
3.15 safety gear
3.16 competent person <\/td>\n<\/tr>\n
7<\/td>\n3.17 supplier-appointed person
3.18 management\/user-appointed person
3.19 installer
3.20 demonstrator
3.21 operator
3.22 user
3.23 mobile MCWP installation <\/td>\n<\/tr>\n
8<\/td>\nFigure 1 Typical single mast mobile MCWP <\/td>\n<\/tr>\n
9<\/td>\nFigure 2 Twin mast MCWP illustrating one fixed and one mobile chassis <\/td>\n<\/tr>\n
10<\/td>\nFigure 3 Typical mast tie arrangements <\/td>\n<\/tr>\n
11<\/td>\n4 Hazards associated with MCWP working
4.1 General
4.2 Erection and dismantling
4.3 Use
5 Specification, installation planning, erection and dismantling of MCWPs
5.1 General <\/td>\n<\/tr>\n
12<\/td>\n5.2 Responsibilities of supplier-appointed person
6 Management and control of MCWP operation
6.1 General
6.2 Responsibilities of the management\/user-appointed person <\/td>\n<\/tr>\n
13<\/td>\n7 Personnel and training
7.1 Selection
7.2 Minimum attributes of personnel
7.3 Training arrangements <\/td>\n<\/tr>\n
14<\/td>\nTable 1 Mast climbing work platform training needs analysis <\/td>\n<\/tr>\n
16<\/td>\n8 Planning of the installation
8.1 General
8.2 Planning <\/td>\n<\/tr>\n
17<\/td>\n8.3 Method statement
9 Siting of MCWPs
9.1 General
9.2 Access to the platform at the boarding point <\/td>\n<\/tr>\n
18<\/td>\n9.3 Traffic access <\/td>\n<\/tr>\n
19<\/td>\n10 Installation
10.1 Installation personnel
10.2 Erection
10.3 Alteration <\/td>\n<\/tr>\n
20<\/td>\n10.4 Dismantling
11 Operation, use, maintenance and inspection of MCWPs
11.1 Operation and use of MCWPs
11.2 Transfer
11.3 Daily checks <\/td>\n<\/tr>\n
21<\/td>\n11.4 Weekly inspections
11.5 Maintenance of MCWPs
11.6 Use of safety harnesses
12 Thorough examination and testing of MCWPs
12.1 General
12.2 MCWPs tied to the building or structure <\/td>\n<\/tr>\n
22<\/td>\n12.3 MCWPs free-standing
12.4 Extent of thorough examination
12.5 Thorough examination reports
12.6 Competent persons <\/td>\n<\/tr>\n
23<\/td>\n13 Safety at the work site
13.1 Clearances and warning notices
13.2 Maintenance of barriers
13.3 Electrical hazards
13.4 Use with other plant
13.5 Removal of guard-rails and toe-boards
13.6 Use as props or jacks
13.7 Rated load
13.8 Alterations and additional fixed loads <\/td>\n<\/tr>\n
24<\/td>\n13.9 Restriction
13.10 Tandem mountings and bridges between work platforms
13.11 Emergency contingency <\/td>\n<\/tr>\n
25<\/td>\nAnnex A (informative) Typical check lists for daily and weekly inspections
A.1 Daily checks
A.2 Weekly inspections <\/td>\n<\/tr>\n
26<\/td>\nAnnex B (informative) Typical check lists for thorough examinations <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Code of practice for the installation, maintenance, thorough examination and safe use of mast climbing work platforms (MCWPs)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2002<\/td>\n30<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":263945,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[838,2641],"product_tag":[],"class_list":{"0":"post-263940","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-53-020-99","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/263940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/263945"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=263940"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=263940"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=263940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}