{"id":27576,"date":"2024-10-17T02:48:44","date_gmt":"2024-10-17T02:48:44","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-d6597-2010\/"},"modified":"2024-10-24T13:57:27","modified_gmt":"2024-10-24T13:57:27","slug":"astm-d6597-2010","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-d6597-2010\/","title":{"rendered":"ASTM-D6597 2010"},"content":{"rendered":"<\/p>\n
1.1 This practice covers the steps necessary to determine if a site is ready for closure with emphasis on general sampling techniques and how to determine if the agreed upon level of remediation has been achieved.<\/p>\n
1.2 A minimum of statistical procedures is used in this practice.<\/p>\n
1.3 The standard practice does not address radioactive waste sites nor does it cover every situation that can occur in the field. It does cover the following general sampling techniques: soil sampling, swipe sampling of buildings and equipment, surface impoundments, waste piles, and layered tanks. It does not cover drum sampling, general water sampling and monitoring wells and their construction.<\/p>\n
1.4 The values stated in inch-pound units are to be regarded as standard. the values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.<\/p>\n
1.5 This standard does not purport to address all safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices to determine the applicability of regulatory limitations prior to use.<\/span><\/p>\n D6597-10 Standard Practice for Assessment of Attaining Clean Up Level for Site Closure<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 1<\/td>\n Scope
Referenced Documents <\/td>\n<\/tr>\n\n 2<\/td>\n Terminology
Summary of Practice
Significance and Use
Planning Using the DQO Process
General Sampling Considerations
Sample Design
Determination of Attainment of Clean Closure <\/td>\n<\/tr>\n\n 3<\/td>\n Sampling Soils
Sampling Waste Piles and Surface Impoundments
Sampling Tanks
Buildings and Equipment
Keywords <\/td>\n<\/tr>\n\n 4<\/td>\n X1. SOIL SAMPLING DEVICES
X1.1
X1.2
X1.3
X1.4
X1.5 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n ASTM<\/b><\/a><\/td>\n 2010<\/td>\n 4<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":27577,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[198,2637],"product_tag":[],"class_list":{"0":"post-27576","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-13-030-40","7":"product_cat-astm","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/27576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/27577"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=27576"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=27576"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=27576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}