{"id":437422,"date":"2024-10-20T07:59:05","date_gmt":"2024-10-20T07:59:05","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-338-2022-2\/"},"modified":"2024-10-26T15:01:35","modified_gmt":"2024-10-26T15:01:35","slug":"ieee-338-2022-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-338-2022-2\/","title":{"rendered":"IEEE 338-2022"},"content":{"rendered":"
Revision Standard – Active. Criteria for the performance of periodic surveillance testing of nuclear power generating station safety systems are provided in this standard. The scope of periodic surveillance testing consists of functional tests and checks, calibration verification, and time response measurements, as required, to verify that the safety system performs its defined safety function. Post-maintenance and post-modification testing are not covered by this document. The periodic surveillance testing requirements of IEEE NPEC nuclear standards are amplified in this standard. Some design requirements are also identified in this standard.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 338\u2122-2022 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.\u2002Overview 1.1\u2002General 1.2\u2002Scope <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.3\u2002Purpose 1.4\u2002Word usage 2.\u2002Normative references <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.2\u2002Acronyms and abbreviations 4.\u2002System design requirements for testing <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.\u2002Testing program requirements 5.1\u2002General considerations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2\u2002Program objectives <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.3\u2002Types of tests <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.4\u2002Test methods <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.5\u2002Test intervals <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.6\u2002Procedure format and documentation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex\u00a0B (informative) General overview of risk-informed surveillance testing B.1\u2002Objective and scope B.2\u2002Effects of surveillance testing on risk <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | B.3\u2002Elements of the risk-informed approach to changing surveillance test interval B.4\u2002On-line monitoring general information <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex\u00a0C (informative) Evaluation process for surveillance test changes C.1\u2002Surveillance test interval risk <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | C.2\u2002Adverse effects of surveillance testing <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Annex\u00a0D (informative) Programmatic approach to risk-informed surveillance test interval management D.1\u2002Overview D.2\u2002Background <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | D.3\u2002Definitions D.4\u2002Risk-informed surveillance test interval management program <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | D.5\u2002PRA requirements <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | D.6\u2002Concurrent configuration control method <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for Criteria for the Periodic Surveillance Testing of Nuclear Power Generating Station Safety Systems (Approved Draft)<\/b><\/p>\n |