{"id":197892,"date":"2024-10-19T12:35:56","date_gmt":"2024-10-19T12:35:56","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c200-2017\/"},"modified":"2024-10-25T05:09:17","modified_gmt":"2024-10-25T05:09:17","slug":"awwa-c200-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c200-2017\/","title":{"rendered":"AWWA C200 2017"},"content":{"rendered":"
This standard covers butt-welded, straight-seam or spiral-seam steel pipe, 6 in. (150 mm) and larger, for transmission and distribution of water.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
15<\/td>\n | 1 General 1.1 Scope 1.2 Purpose 1.3 Application <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 2 References <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3 Definitions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4 Requirements 4.1 Permeation <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.2 Materials 4.3 Drawings 4.4 Calculations 4.5 Selection of Materials <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.6 Requirements for Welding \n Qualification 4.7 Fabrication of Pipe <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 4.8 Production Weld Tests <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 4.9 Permissible Variations in \n Dimensions 4.10 Ancillary Pipe <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 4.11 Preparation of Ends <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 4.12 Protective Coatings and Linings <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 4.13 Special Sections 4.14 Fabrication of Special Sections 5 Verification 5.1 Inspection <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.2 Test Procedures <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 5.3 Calibration of Equipment <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 5.4 Test Reports 6 Delivery 6.1 Marking 6.2 Handling and Loading 6.3 Affidavit of Compliance <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C200-17 Steel Water Pipe, 6 In. (150 mm) and Larger<\/b><\/p>\n |