{"id":410207,"date":"2024-10-20T05:39:19","date_gmt":"2024-10-20T05:39:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-22-30442303-dc-2022\/"},"modified":"2024-10-26T10:23:59","modified_gmt":"2024-10-26T10:23:59","slug":"bsi-22-30442303-dc-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-22-30442303-dc-2022\/","title":{"rendered":"BSI 22\/30442303 DC 2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope and general 1.1 Scope 2 Normative reference 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 General principles and considerations 4.1 General <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.2 Safety 4.3 Principles of sampling 4.4 Objectives of sampling in coal preparation plants 4.4.1 General <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.4.2 Determination of scope of sampling using a sampling decision tree <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5 Design considerations 5.1 Principles 5.1.1 Solids sampling 5.1.2 Slurry sampling <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2 Systems for new plants and retrofitting 5.2.1 New plant mechanical sampling systems <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2.2 New plant manual sample points 5.2.3 Existing plant with no mechanical system 5.2.4 Manual sampling points in existing plants 6 Planning for sampling 6.1 Pre-sampling inspection <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.2 Personnel 6.3 Containers 6.4 Method 6.4.1 Overview <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.4.2 Sampling Time 6.4.3 Sampling for feed quality characterization <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.4.4 Sampling for quality monitoring and control <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.4.5 Sampling for equipment performance <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.4.6 Sample mass <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7 Sampling management 7.1 Consideration of process <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 7.2 Handling of samples after collection 8 Sampling from a slurry stream 8.1 Slurry flow regimes <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.2 Sampling locations <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 8.3 Slurry sampling methods 8.3.1 Considerations for sampling of slurry streams <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 8.3.2 Manual sampling <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 8.3.3 Automatic slurry samplers <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 8.4 Secondary sampling of slurry streams 9 Considerations for screen discharge sampling <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 10 Sampling of magnetite received in bulk 11 Sampling report <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex\u20acA (informative) Recommended manual sampling locations and options <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Annex\u20acB (informative) Checklist examples <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Annex\u20acC (informative) Recommended laboratory analysis <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Annex\u20acD (informative) Example of sampling plan <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS ISO 4077. Coal preparation plant. Guide to sampling in coal preparation plants<\/b><\/p>\n |